Doc.: IEEE 802.11-02/532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 1 High Throughput Study Group WG Report and Meeting Slides Jon Rosdahl.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Doc.: IEEE /661r1 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Doc.: IEEE /661r0 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Doc.: IEEE /078 Submission May 2000 Matthew Shoemake, AlantroSlide 1 Information Regarding and Status of HRbSG Matthew B. Shoemake HRbSG Chairperson.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Doc.: IEEE /854R3 SubmissionSlide 1 July 2004 Sheung Li, Atheros Section 21 Procedure (formerly Procedure 10) Request for P802.11j Conditional.
Doc.: IEEE Submission March 2006 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
1 Hyades Command Routing Message flow and data translation.
David Burdett May 11, 2004 Package Binding for WS CDL.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Create an Application Title 1Y - Youth Chapter 5.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Doc.: IEEE /012r0 Submission January 2003 Jon Rosdahl, Micro LinearSlide 1 High Throughput Study Group WG Report and Meeting Slides Jon Rosdahl.
Submission doc.: IEEE Comment #1 from WG Comment: In Section 5.2.b two examples of spectrum resource measurements are given: PER and.
Doc.: IEEE /222r4 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
GEtServices Services Training For Suppliers Requests/Proposals.
Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE /0022r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Discussion on Contention-based Protocol (CBP) Study Group Notice:
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CSD for P802.1AS-REV WG Wednesday, 05 November 2014.
PAR and CSD for P802.1Qxx WG January PAR (1) 1.1 Project Number: P802.1Qxx 1.2 Type of Document: Standard 1.3 Life Cycle: Full Use 2.1 Title:
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
CSD for P802.1Qcj WG January Project process requirements Managed objects – Describe the plan for developing a definition of managed objects.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
1 6/3/2003 IEEE Link Security Study Group, June 2003, Ottawa, Canada Secure Frame Format PAR: 5 Criteria.
Doc.: IEEE /1220r0 Submission November 2009 Jon Rosdahl, CSRSlide 1 WG11 Comments on PARs submitted Nov 2009 Date: Authors:
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
1 IEEE interim, Orlando, Florida, March, 2008new-nfinn-fast-chains-rings-par5c-0308-v1 Fast Recovery for Chains and Rings Proposal for PAR and 5.
Doc.: IEEE /57 Submission March 1999 Bob Heile, GTESlide Working Group Report to ExCom Thursday, March 11, 1999 Wireless Personal Area.
Doc.: IEEE /0860r0 Submission July 2010 Jon Rosdahl, CSRSlide 1 Comments for p New PAR – July 2010 Date: Authors:
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
<month year> Denver, March 2006
Privacy Recommendation PAR Proposal
<month year> Denver, March 2006
Comments for p New PAR – July 2010
High Throughput Study Group WG Report and Meeting Slides
Submission Title: BAN closing report for San Diego, CA
Presentation transcript:

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 1 High Throughput Study Group WG Report and Meeting Slides Jon Rosdahl

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 2 Report to the WG HT-SG had its Inaugural Meeting where a starting point was begun. HT-SG was able to answer the following Questions: –What: Scope –Why: Purpose

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 3 Report to the WG (cont) Current Scope of the project: To define standardized modifications to the MAC and PHY layers that achieve a minimum increase (xx) in throughput as measured at the MAC data SAP.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 4 Report to the WG (cont) Current Purpose of the Project: To improve the wireless LAN user experience by providing significantly higher throughput for current applications and to enable new applications and market segments.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 5 Objectives for November 2002 Finalize the wording of the PAR. Create the response to 5 Criteria. Request that members of the SG come prepared to enjoy the creation of a PAR and the response to 5 Criteria (and the 6 th one too)

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 6 HT-SG Welcome to High Throughput Study Group Wednesday

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 7 Meeting Tone PLEASE Bring your Engineer Mentality and Technologist Attitude Please keep a Positive Attitude Please check your Ego and Politics at the door.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 8 Inaugural Meeting Slides Inaugural Meeting held Wednesday Sept. 11, 2002 in Monterey, CA.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 9 Confirmation of Secretary Garth Hillman has volunteered to be the HT-SG Secretary. Others? no Affirmed by acclamation

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide Review IEEE/802 & Policies and Rules Study Group: Everyone Votes. All 802 policies apply All policies apply Submissions must meet document format criteria

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 11 Agenda Wednesday 1 Meeting Call to Order 2 Elect/Confirm Secretary 3 REVIEW IEEE/802 & POLICIES and RULES 4 APPROVE/MODIFY AGENDA 5 Set/Review Objectives 6 Discuss/Revise PAR and 5 Criteria 7 Recess for the Day

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 12 Agenda Thursday 8. Discuss/Revise PAR and 5 Criteria 9. Develop plan for future HT SG Work 11. Adjourn for the session

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 13 Sept Objectives Generate PAR Generate response to LMSC 802 Criteria

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 14 Review PAR 4. Project Title 8. Fill in Projected Completion Date for Submittal to RevCom: (July 2004?) 9. Scope of Proposed Project 10. Purpose of Proposed Project

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 15 Possible Proposed Title Amendment to STANDARD [FOR] Information Technology- Telecommunications and information exchange between systems-Local and Metropolitan networks-Specific requirements-Part 11: Wireless LAN Medium Access Control (MAC) and Physical Layer (PHY) specifications:Enhancements for Higher Effective Throughput

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 16 Target Schedule for a SG Sept – 5 Criteria and PAR started Nov 2002 – Request for creation of Task Group to be sent to ExCom with 5 Criteria and PAR

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 17 Target Schedule (cont.) Jan 2003 – Technology solutions presented in earnest – Requirements doc complete. Mar 2003 – Technology Solutions presented May 2003 – Selection of Solution and start writing Draft July 2003 – Complete initial draft and send out 1 st WG Letter Ballot. Sept –process comments and send 2 nd WG Letter Ballot

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 18 Target Schedule (cont.) Nov 2003 – Comment resolution and start recirculation LB Jan 2004 – final resolution of comments Mar 2004 – Send to Sponsor Ballot May 2004 – Resolve comments July 2004 – Send to Revcom

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 19 Scope for consideration Solutions in achieving High Throughput shall be considered which provide enhancement to existing.11 MAC and PHY layers through standardized mechanism or interface. A view submitted to the Chair Sept.2002

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 20 A View on Criteria Study group should emphasize high performance (throughput/rate) WLANs in general SG should emphasize overall performance Backwards compatibility is vital SG should have broad scope and the authorization to recommend all necessary changes A view presented Mar 2002

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide Five Criteria 1.Broad Market Potential 2.Compatibility 3.Distinct Identity 4.Technical Feasibility 5.Economic Feasibility 6.Interference Considerations (tentative)

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 22 Straw Poll Would you like to enhance the 11b throughput? a? g?

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 23 Another Proposed Scope Statement To define standardized modifications to the.11MAC and OFDM PHY layers that achieve an increase in throughput measured at the MAC data SAP

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 24 Straw Poll Should we consider only existing.11standards as the baseline from which this group operates?

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 25 Straw Poll Quantify Minimum Increase at the MAC SAP Interface in the Scope or not?

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 26 Update to the Scope Paragraph To define standardized modifications to the.11MAC and OFDM PHY layers that achieve a minimum increase (xx) in throughput measured at the MAC data SAP

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 27 Update to the Scope Paragraph To define standardized modifications to the.11 MAC and PHY layers that achieve a minimum increase (xx) in throughput measured at the MAC data SAP

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 28 Thursday Evening Meeting Slides for Thursday, Sept. 12, 2002 at Monterey, CA

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 29 Meeting Tone PLEASE Bring your Engineer Mentality and Technologist Attitude Please keep a Positive Attitude Please check your Ego and Politics at the door.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 30 Agenda Thursday 8. Discuss/Revise PAR and 5 Criteria 9. Develop plan for future HT SG Work 11. Adjourn for the session

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 31 Current Scope Paragraph To define standardized modifications to the.11 MAC and PHY layers that achieve a minimum increase (xx) in throughput measured at the MAC data SAP.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 32 Questions to answer on PAR 4. Project Title 8. Fill in Projected Completion Date for Submittal to RevCom: (July 2004?) 9. Scope of Proposed Project 10. Purpose of Proposed Project 16. Other Details

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 33 Criteria The current rules have the following 5 Criteria listed. See

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 34 Criteria 6.1. Broad Market Potential A standards project authorized by IEEE 802 shall have a broad market potential. Specifically, it shall have the potential for: a) Broad sets of applicability. b) Multiple vendors and numerous users. c) Balanced costs (LAN versus attached stations).

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 35 Criteria 6.2 Compatibility IEEE 802 defines a family of standards. All standards shall be in conformance with the IEEE Architecture, Management and Interworking documents as follows: 802. Overview and Architecture, 802.1D, 802.1Q and parts of 802.1f. If any variances in conformance emerge, they shall be thoroughly disclosed and reviewed with 802.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 36 Criteria 6.2 Compatibility (cont) Each standard in the IEEE 802 family of standards shall include a definition of managed objects which are compatible with systems management standards.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 37 Criteria 6.3 Distinct Identity Each IEEE 802 standard shall have a distinct identity. To achieve this, each authorized project shall be: a) Substantially different from other IEEE 802 standards. b) One unique solution per problem (not two solutions to a problem). c) Easy for the document reader to select the relevant specification.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 38 Criteria 6.4 Technical Feasibility For a project to be authorized, it shall be able to show its technical feasibility. At a minimum, the proposed project shall show: a) Demonstrated system feasibility. b) Proven technology, reasonable testing. c) Confidence in reliability.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 39 Criteria 6.5 Economic Feasibility For a project to be authorized, it shall be able to show economic feasibility (so far as can reasonably be estimated), for its intended applications. At a minimum, the proposed project shall show: a) Known cost factors, reliable data. b) Reasonable cost for performance. c) Consideration of installation costs.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide Purpose of the Proposed Project Ideas from the Group on WHY? –Looking for a Good Technology solution that has the right balance of Wow and Value. –Market Spaces: Wireless LANs in the Home Hot Spot Deployment Corporate LAN Deployment –Higher Data Rate – Real Simple (>200 Mbps)

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 41 Purpose of the Proposed Project (Cont) Remember to think Latterly –Both MAC and PHY – Improve End-to-End Make Concert of Changes –Scalability -- Higher Data Rates Provide Wireless Support for High Speed Application Video – file service – etc.

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 42 Purpose of the Proposed Project (Cont) High Speed delivery of advanced services to Hand Held Devices Video, interactive pictures etc. Increase the size of Market via Standardize leading Edge “WOW” solutions. Improved Spectrum Efficiency Extended Range Provide a Value to the End User –User Experience

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 43 Purpose of the Proposed Project (Cont) Keep in Perspective Range vs Rate and the trade offs. Smooth Transition from one Technology to another Provide to prevent the effective range from being reduced significantly. Scalable Solution for Range, Rate, and Power Consumption trade-offs Hit Moore’s Law

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 44 Area 16: Other Items Bits/sec/Hz/user

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 45 Purpose (WHY) Initial Words to include To make Wireless LANS better than they are right now. Higher Throughput to improve the End- User experience. Market Spaces including but not limited to: Wireless LANs in the Home Hot Spot Deployment Corporate LAN Deployment (75-6-3)

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 46 Proposed purpose To improve the wireless LAN user experience by providing significantly higher throughput for Applications including but not limited to those in the Home, Hot-spot and Enterprise Markets. (65-1-1) (original paragraph) (65-0-8) (add: including but not limited to)

doc.: IEEE /532r0 Submission September 2002 Jon Rosdahl, Micro LinearSlide 47 Final Proposed Purpose. To improve the wireless LAN user experience by providing significantly higher throughput for current applications and to enable new applications and market segments