Industrial Facilities Design (7 th Term, Batch 2009)  28/3/2012 11  lectur # 31 & 32.

Slides:



Advertisements
Similar presentations
Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
Advertisements

Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 16 Unemployment: Search and Efficiency Wages.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
PowerPoint Presentation
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Inventory Fundamentals
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Sales and Capacity Planning
Sales and Operations Planning (Aggregate Planning)
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Managing Capacity.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Capacity and Constraint Management
Capacity and Constraint Management
Chapter 5 Capacity Planning For Products and Services
VOORBLAD.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Equal or Not. Equal or Not
Slippery Slope
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Fundamentals of Cost Analysis for Decision Making
PSSA Preparation.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Chapter 13 Capacity and Aggregate Planning. Aggregate Production Planning (APP) Matches market demand to company resources Matches market demand to company.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
Operations Management Aggregate Planning Chapter 13
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
IES 371 Engineering Management Chapter 14: Aggregate Planning
Aggregate Production Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPSM 301 Operations Management
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
Manufacturing’s Objectives
Supply Chain Management (SCM) Aggregate Planning
Chapter 8 Aggregate Planning in a Supply Chain
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Production Planning and Control.  Allocate the company’s ressources  Taking into account :  Strategic and operational objectives (quantity, quality,
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
Sales and Operations Planning
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Production Planning Activities
Chapter 14 Aggregate Planning.
BUAD306 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Sales and Operations Planning
Aggregate Production Planning (APP)
Presentation transcript:

Industrial Facilities Design (7 th Term, Batch 2009)  28/3/2012 11  lectur # 31 & 32

Lecture Outline  Production + Planning  Common of Objectives Of P Planning  P Planning (Classification)  Aggregate P Planning  Capacity Decision Hierarchy  Aggregate Planning Process  Methods of Influencing Demand & Supply  APP Variables  Strategies for Adjusting Capacity  Aggregate P Planning Example  13-2  28/3/2012  lectur # 31 & 32

Production Production is a function in which raw materials or human efforts (inputs) are transformed into finished good or services (outputs)  13-3  28/3/2012  lectur # 31 & 32

Planning An organizational process of creating and maintaining a plan;plan Or The psychological process of thinking about the activities required to create a desired goal on some scalethinking  13-4  28/3/2012  lectur # 31 & 32

 Slide 11.5 Common objectives of production planning...  MINIMIZE: cost, inventory levels, changes in work force levels, use of overtime, use of subcontracting, changes in production rates, plant/personnel idle time  MAXIMIZE: profits, customer service  28/3/2012  lectur # 31 & 32

 Slide 11.6 Production Planning  Long Range Planning Strategic planning (1-5 years)  Medium Range Planning Employment, output, and inventory levels (2- 18 months)  Short Range Planning Job scheduling, machine loading, and job sequencing (0-2 months)  28/3/2012  lectur # 31 & 32

 Slide 11.7 Aggregate production planning is medium-term capacity planning over a two to eighteen month planning horizon. It involves determining the lowest-cost method of providing the adjustable capacity for meeting production requirements.  28/3/2012  lectur # 31 & 32

 Slide 11.8 Capacity Decisions Hierarchy  Linkages  Facilities  Planning  Aggregate  Planning  Scheduling  Time Frame  Facilities Planning  Aggregate Planning  Scheduling  Time  28/3/2012  lectur # 31 & 32

 Slide 11.9 Aggregation refers to the idea of focusing on overall capacity, rather than individual products or services. Aggregation is done according to: Products Labor Time  28/3/2012  lectur # 31 & 32

 Slide Aggregate production planning involves managing...  Work force levels  Work force levels - the number of workers required for production.  Production rates  Production rates - the number of units produced per time period.  Inventory levels  Inventory levels - the balance of unused units carried forward from the previous period.  28/3/2012  lectur # 31 & 32

 Aggregate Planning Process  28/3/2012  lectur # 31 & 32

 Slide Methods of Influencing Demand  Price Incentives  Reservations  Backlogs  Complementary Products or Services  Advertising/promotion  28/3/2012  lectur # 31 & 32

 Slide Methods of Influencing Supply  Hiring/firing workers  Overtime/slack time  Part time/temporary labor  Subcontracting  Cooperative arrangements  Inventories  28/3/2012  lectur # 31 & 32

 Slide Aggregate Production Planning Variable Costs  Hiring/firing costs  Overtime/slack time costs  Part time/temporary labor costs  Subcontracting costs  Cooperative arrangements costs  Inventory carrying costs  Backorder or stock out costs  28/3/2012  lectur # 31 & 32

Strategies for Adjusting Capacity  Level production Producing at a constant rate and using inventory to absorb fluctuations in demand  Chase demand Hiring and firing workers to match demand  Peak demand Maintaining resources for high-demand levels   Overtime and under-time Increasing or decreasing working hours   Subcontracting Let outside companies complete the work   Part-time workers Hiring part time workers to complete the work   Backordering Providing the service or product at a later time period   28/3/2012  lectur # 31 & 32

Level Production  Demand Units Time Production  28/3/2012  lectur # 31 & 32

Chase Demand  Demand Units Time Production  28/3/2012  lectur # 31 & 32

Level Production Strategy  Level production = 100,000 pounds (50, , , ,000) 4 Spring80,000100,00020,000 Summer50,000100,00070,000 Fall120,000100,00050,000 Winter150,000100, ,000140,000 Cost of Level Production Strategy (400,000 X $2.00) + (140,00 X $.50) = $870,000 SALESPRODUCTION QUARTERFORECASTPLANINVENTORY  28/3/2012  lectur # 31 & 32

Chase Demand Strategy  Spring80,00080, Summer50,00050, Fall120,000120, Winter150,000150, SALESPRODUCTIONWORKERSWORKERSWORKERS SALESPRODUCTIONWORKERSWORKERSWORKERS QUARTERFORECASTPLANNEEDEDHIREDFIRED Cost of Chase Demand Strategy (400,000 X $2.00) + (100 x $100) + (50 x $500) = $835,000  28/3/2012  lectur # 31 & 32

Mixed Strategy  Combination of Level Production and Chase Demand strategies  Examples of management policies no more than x% of the workforce can be laid off in one quarter inventory levels cannot exceed x dollars  Many industries may simply shut down manufacturing during the low demand season and schedule employee vacations during that time   28/3/2012  lectur # 31 & 32

 A small manufacturing company with 200 employees produces umbrellas. The company produces the following three product lines: 1) the Executive Line, 2) the Durable Line and 3) the Compact line, as shown in the below  Executive Line  Durable Line  Compact Line Aggregate Planning Example  28/3/2012   lectur # 31 & 32

 Number of working days:  Jan: 22  Feb:19  Mar:21  Apr:21  May:22  Jun:20 Aggregate Planning Example: Demand for Executive Umbrellas  28/3/2012   lectur # 31 & 32

Aggregate Planning Example: Cost Information for Executive Umbrellas  28/3/2012   lectur # 31 & 32

Aggregate Planning Example: Determining Straight Labor Costs and Output for Executive Umbrellas  January  = 22 [days/month] * 7.25 [productive hrs/worker]  = [hrs/worker/month] /.15 [hrs/unit]  $1,408 = 8 [$/hr] * 8 [paid hrs/day] * 22 [days/month]  28/3/2012   lectur # 31 & 32

Aggregate Planning Example: Determining Straight Labor Costs and Output for Executive Umbrellas  28/3/2012   lectur # 31 & 32

4,500 units is the demand in January (any combination of firm orders and forecast4,500 units is the demand in January (any combination of firm orders and forecast 250 is the starting inventory position250 is the starting inventory position 4,250 = 4,500 – 2504,250 = 4,500 – = 4,250 / 1, = 4,250 / 1, = workforce level at the beginning of January7 = workforce level at the beginning of January 3 = 7 – 4 = workers fired3 = 7 – 4 = workers fired 4 = workforce level at end of January4 = workforce level at end of January 0 = ending inventory level0 = ending inventory level Aggregate Planning Example Chase Strategy for Executive Umbrellas Objective: Adjust workforce level so as to eliminate the need to carry inventory from period to periodObjective: Adjust workforce level so as to eliminate the need to carry inventory from period to period  28/3/2012   lectur # 31 & 32

Aggregate Planning Example Chase Strategy for Executive Umbrellas  28/3/2012   lectur # 31 & 32

Aggregate Planning Example Chase Strategy for Executive Umbrellas  January costs: $21, = 4,250 [units] * $5 [$/unit] $ 5, = [workers] * 1,408 [$/worker] $ = 3 [workers fired] * 250 [$/worker fired]  28/3/2012   lectur # 31 & 32

Aggregate Planning Example Level Strategy for Executive Umbrellas Objective: Adjust inventory level so as to eliminate the need to hire or fire workers from period to periodObjective: Adjust inventory level so as to eliminate the need to hire or fire workers from period to period Assume that January is started with 6 employeesAssume that January is started with 6 employees 6,380 = 6 [employees] *6,380 = 6 [employees] *  1, [units/worker] 2,130 = 6,380 – 4,250 (surplus)2,130 = 6,380 – 4,250 (surplus)  28/3/2012   lectur # 31 & 32

Aggregate Planning Example Level Strategy for Executive Umbrellas  28/3/2012   lectur # 31 & 32

Aggregate Planning Example Level Strategy for Executive Umbrellas  January costs: $8,448 = 6 [workers] * $1,408 [$/worker] $ 31,900 = 6,380 [units] * $5 [$/unit] $ 2,130 = 2,130 [surplus units] * $1 [$/unit held/month]  28/3/2012   lectur # 31 & 32

Aggregate Planning Example Which Plan is Cheaper? Level Capacity Chase $249,100.00$260,  Clearly, the level capacity plan is cheaper over the selected time horizon  Note: Be cautious in using the chase strategy as many intangibles, such as employee loyalty and commitment to the organization are adversely affected  28/3/2012   lectur # 31 & 32