SunGuide TM Software Development Project Release 4.0 Data Fusion Follow-Up DR Jan. 8, 2008 Updated: Jan 4, 2008, 11:00 am.

Slides:



Advertisements
Similar presentations
SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Advertisements

Copyright © 2008 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 2 Introduction to XHTML Programming the World Wide Web Fourth edition.
SunGuide SM Software Development Project Ad Hoc Training.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Manuscript Central Training Author Center Module 2.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
1 Hyades Command Routing Message flow and data translation.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Summary of Convergence Tests for Series and Solved Problems
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Microsoft Access 2007 Advanced Level. © Cheltenham Courseware Pty. Ltd. Slide No 2 Forms Customisation.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
1 NatQuery 3/05 An End-User Perspective On Using NatQuery To Extract Data From ADABAS Presented by Treehouse Software, Inc.
Course Objectives After completing this course, you should be able to:
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
How to Use SPBQ Data to Improve Student Learning
2 |SharePoint Saturday New York City
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
Operating Systems Operating Systems - Winter 2012 Dr. Melanie Rieback Design and Implementation.
VOORBLAD.
Name Convolutional codes Tomashevich Victor. Name- 2 - Introduction Convolutional codes map information to code bits sequentially by convolving a sequence.
Benchmark Series Microsoft Excel 2013 Level 2
HORIZONT TWS/WebAdmin TWS/WebAdmin for Distributed
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
4 Oracle Data Integrator First Project – Simple Transformations: One source, one target 3-1.
1..
Jim Haywood (Product Manager for Statutory Returns) Adopted from Care - Spring Release 2014.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
FDOT Central Office ITS Software Update
2004 EBSCO Publishing Presentation on EBSCOadmin.
Chapter 10: The Traditional Approach to Design
Analyzing Genes and Genomes
Systems Analysis and Design in a Changing World, Fifth Edition
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Contract Audit Follow-Up (CAFU) 3.5 Pre-Defined & Ad hoc Reports November 2009 ITCSO Training Academy.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
May 16, 2007Change Management Board Meeting1 Local: Toll-Free: Ext
SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review.
SunGuide TM 4.0 Functionality Data Fusion: How Data is Managed June 24, 2008.
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007.
SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes GUI Design Review March 10, 2008.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
Presentation transcript:

SunGuide TM Software Development Project Release 4.0 Data Fusion Follow-Up DR Jan. 8, 2008 Updated: Jan 4, 2008, 11:00 am

2 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 2 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

3 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 3 Introductions

4 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 4 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

5 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 5 Meeting Objectives Requirements and Design: –Review high level design –Provide clarification to SwRIs initial design interpretation –Present revised prototype screens / reports Not an objective: –Revise requirements

6 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 6 Release 4.0 Development Activities

7 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 7 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

8 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 8 C2C XML Schema Draft schema delivered in December New Travel Time data type w/ Link inventory New Floodgate data type –Second language support being added New Traveler Event data type –Location and Roadway inventory data being added –Actual Lat/Lon instead of/in addition to Location ID –Note: Traveler Event needs to be a new event type because DF005G requires a unique icon for Traveler Events on the map. Add Offset in miles to Incident, Closure, and Traveler Event data types

9 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 9 Weather Alerts SwRI ready to evaluate Meteorlogix alert data Issues: –SwRI needs active web service to obtain sample data –Meteorlogix needs coverage instructions and geodata for covered roads and areas

10 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 10 External Events SwRI ready to accept external event data from C2C feed SwRI can develop new plug-in to publish FHP data, or SwRI can develop new SunGuide module to retrieve FHP data from FHP web service

11 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 11 Data To Be Fused Weather Alerts –Fused to EM Location Code –Location Code checked against existing Events –New Traveler Event presented to operator External Event Data (e.g. FHP CAD) –Fused to EM Location Code –Location Code checked against existing Events –Event conflict resolution dialog presented to operator

12 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 12 Data Fusion & FL-ATIS Extended telecon and interaction Resolved: –EM subsystem, GUI, and Admin changes –Location code usage –SAE code usage –Floodgate messages and GUI changes Unresolved: –Weather alerts

13 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 13 Event Management Changes Add new Alternate Route Admin dialog Add City and Metro Area selections to EM Location Admin dialog Update EM to include original lat/lon values in schema Update EM to use configurable snap-to radius for Location code selection Add Traveler Info event type Add Publish to ATIS control Populate existing Alternate Route ID dropdowns with values from new Alternate Route Admin dialog Note: Prototype EM GUI and Alternate Route dialog on following slides

14 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 14 EM Changes (contd)

15 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 15 EM Changes (contd)

16 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 16 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

17 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 17 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

18 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 18 Location Codes SunGuide C2C will publish Location and Roadway inventory data based on EM Location and Roadway data Data Fusion will use EM Location code if available, and newly available original lat/lon values

19 SAE Code Proposed Solution Requirements directed a GUI based solution where drop down were going to be provided to allow operators to select SAE codes. During design discussions: –It was concluded that this was requesting too much of an operator (they have enough to do) –FDOT wanted a standard approach to which SAE codes were selected Resolution: –SunGuide will use EM Event Codes (a combination of SAE codes and FDOT codes) and not claim to adhere to a standard –A EM Event Code translation table will be built and event attributes will be automatically mapped –SunGuide will distribute EM Event Codes codes via C2C –EM Event Codes will be transparent to SunGuide operators Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review

Implementation of EM Event Codes A list of requested codes was generated by PBS&J (and distributed to the Districts) District 4 provided additional requests The following slides show the results, the column SunGuide Support is important to review because this could impact cost and schedule (the original approach of drop downs was very simple): –Easy translation: can be derived from SG data –EM Event type: data available in SG –Event attribute: data available in SG –Hard translation: algorithm to derive from SG data will need to be created –Set Event type and lane flags: data available in SG –Not found: no data available to support

21 EM Event Codes: Translation Table for Event Type Issue: event type can be edited by the System Administrator – should this edit screen be removed so FDOT can have the SAME event types across all SunGuide deployments? Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review

22 EM Event Codes: Location and Lane Blockage Issue: some actual (real) lane configurations may not be captured above Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review

23 EM Event Codes: Various fields Note: weather conditions can be edited by the System Administrator – this edit screen be removed by FDOT direction so FDOT can have the SAME weather conditions across all SunGuide deployments. Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review

24 EM Event Codes: Proposed Additions (beyond the SAE standards) Theses codes are were requested by District 4 Codes that will not be included (no travel time related codes will be provided): Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review

25 SAE Codes: Issues to Resolve Does FDOT wish to rename? Codes will only be included if a mapping can be identified between SunGuide and the codes. Some compaction of codes may be implemented by using qualifiers (e.g. three center lanes blocked) Are the lists provided by PBS&J acceptable? –Final tables needed by end of January –Should Admin editor screens be removed? Should the D4 proposed additions be included? Once all of the above issues are resolved SwRI will determine the impact to the project. Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review

26 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 26 Floodgate Messages Add 2 nd language support to GUI and subsystem Add new GUI fields in support of FL-ATIS Add Floodgate support to SunGuide plug-in and C2C SunGuide interaction with 511 remains unchanged

27 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 27 Floodgate Messages (contd) Alternate language selection scheme

28 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 28 Reports Adding Crystal Reports 11 run-time to installer is in progress…

29 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 29 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

30 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 30 Action Item Summary NumberResponsible Text Resolution 190SwRI SwRI to provide the C2C XML schema. Closed: Provided on 12/12/07 191SwRI SwRI will provide analysis of impact to implement a Meteorlogix interface instead of a NWS interface. Open: waiting on data from IBI/DTN before the impact can be completed 192SwRI SwRI to provide justification of $6,700 line item in cost estimate if not to implement FHP interface. Closed: Provided on 11/14/07 193SwRI SwRI to provide analysis and impact of adding the FHP CAD feed to SunGuide. Closed: Has been provided to FDOT 194SwRI Determine an approach to providing Floodgate information to Logictree/IBI. Closed: FDOT has provided requirements to SwRI 195FDOT (PBS&J) John Bonds to distribute the SAE list to the districts. In progress: Proposed solution is being reviewed 196SwRI SwRI needs to provide a draft GUI layout for review by FDOT operations personnel with explanation of what fields are and how they will work. Needs to include: SAE coding, publishing to IDS, alternate routing, etc. Included in Follow-up Design Review

31 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 31 Action Item Summary - continued NumberResponsible Text Resolution 197FDOT (PBS&J) Erik Gaarder and Gene Glotzbach to ask Logic Tree / IBI Group of impact switching to J Closed: Change will not be made 198FDOT (PBS&J) PBS&J took action to pare down the SAE code table with help from districts. Closed: Provided to SwRI 199SwRI SwRI to coordinate with Logic Tree / IBI Group regarding floodgate messages. Closed: Requirements provided and implementation in process 200SwRI Add other deployments: MDX, Palm Beach County, Turnpike Closed: Added to schedule 201SwRI SwRI will provide some options to relieve operator work load for selecting SAE codes. Closed: Current approach is to automatically select

32 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 32 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

33 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 33 Deployments / Schedule Current high-level schedule: –Development to complete late March 2008 –Integration complete by April 4, 2008 –FAT the week of April 7, 2008 –IV&V the week of May 5, 2008 –Deployments starting week of May 12, 2008 (specific order will need to be verified by FDOT – 3 day installations might cover 2 deployments, assume that SunGuide is already installed) D2 (2 days) D3 (2 days) D4 (3 days) D5 (3 days) D6 (2 days) D7 (2 days) TERL (3 days) Based on the urgency of Release 3.1 (I-95 Express Lanes) the overall development schedule will be pushed 6 to 8 weeks

34 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 34 Agenda TimeItemLead 8:00 – 8:15 Introductions and Opening Remarks Tillander 8:15 – 8:30High Level Overview – meeting objectives Heller 8:30 – 9:45 Various topics: C2C XML Schemas Weather Alerts External Events Data To Be Fused Data Fusion and FL-ATIS Event Management Changes Heller / Brisco 9:45 – 10:00 Break 10:00 – 10:45Various topics: Location Codes SAE Codes Floodgate Messages Reports Heller / Brisco 10:45 – 11:00Action Item Review Heller / Brisco 11:00 – 11:15 Deployments / Schedule Heller / Brisco 11:15 – 11:30 Open Discussion All

35 Jan 8, 2008R4.0 Data Fusion Design Follow-up Design Review 35 Discussion ?