MCM 5 – Post-Construction Runoff Control (DRAFT) YES NO Post-construction stormwater management for that construction activity is in compliance with MCM5.

Slides:



Advertisements
Similar presentations
Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Advertisements

Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm.
0 - 0.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Addition Facts
Storm Water Management
4. What is the boundary between two drainage basins called?
Well Permitting & Approvals
Total Suspended Solids (TSS) Reduction Presenter: Keith Noble, Saginaw Bay District Office.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
State Waters and Stream Buffers
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Filling and Wrapping Review Sheet
Storm Water Blue Ribbon Panel Recommendations to the California State Water Resources Control Board The Feasibility of Numeric Effluent Limits Applicable.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Surface Area of Irregular Shapes Volume of Irregular Shapes
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Watershed Staff Videoconference October 17, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Duluth’s Storm Sewers Chris Kleist. Overview My background About Duluth Storm sewer 101 June flood Flooding issues Considerations.
Stakeholders Meeting – March 5, 2014 Selvin T. Southwell, P.E.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Stormwater Rulemaking Briefing US Environmental Protection Agency.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Stormwater Management For Developing Municipalities What Residents Can Do What Towns Can Do.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Big Trout Lake Stormwater Management Design Project By Hannah Rollin.
Low Impact Development Best Management Practices
Env 247 Overview of Stormwater Management March 1, 2011.
Schuykill River Watershed. ebrateDetail.cfm?wsid=29.
Lecture ERS 482/682 (Fall 2002) Why watersheds? ERS 482/682 Small Watershed Hydrology.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
FNR 402 – Forest Watershed Management
RIPDES Storm Water Program: Large and Small Construction.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
GROWING COMMUNITIES ON KARST THURSDAY, SEPTEMBER 13, 2007 LOCAL GOVERNMENT INITIATIVES: JEFFERSON COUNTY, WEST VIRGINIA Tony Redman
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
By: Rick Ayers Yates County Soil & Water Conservation District
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
San Rafael, California November 12, 2015
6. Drainage basins and runoff mechanisms Drainage basins Drainage basins The vegetation factor The vegetation factor Sources of runoff Sources of runoff.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Slides excerpted from the Ecosystem Services module
Protecting Non-Impaired Resources
Running Water and Groundwater
Presentation transcript:

MCM 5 – Post-Construction Runoff Control (DRAFT) YES NO Post-construction stormwater management for that construction activity is in compliance with MCM5 and Anti-deg standards. No further action required. Rates and volume of stormwater runoff from each site where construction activity takes place will be equal to or less than pre-development rates and volume of stormwater runoff. Will the construction activity be conducted on land that is described as any of the following? A.A brownfield site B. High Density (> 7 units per acre) C.Vertical Density, (Floor to Area Ratio (FAR) of 2 or > 18 units per acre) D.Mixed use and Transit Oriented Development (within ½ mile of transit) Will rates and volume of stormwater runoff from each site where construction activity is described as A-D, meet 50% of pre- development rates and volume of stormwater runoff. Post const. rates and volume are equal to or less than that of pre-const (existing land use). Mitigation must be conducted that results in rates and volumes of runoff equal to the projects pre-development hydrology within 1) the stormshed, 2) watershed, 3) the MS4 Can mitigation be conducted up-stream and prior to the initiation of the const. project. Anit-deg is satisfied Permittee must conduct a Social and Economic Justification. This will involve the proposal of the least degrading alternative. Mitigation must be conducted that results in rates and volumes of runoff being at least 50% of the project’s pre- development hydrology within 1) the stormshed, 2) watershed, 3) the MS4 "Construction Activity" includes construction activity as defined in 40 C.F.R. pt (b)(14)(x) and small construction activity as defined in 40 C.F.R. pt (b)(15). This includes a disturbance to the land that results in a change in the topography, existing soil cover (both vegetative and non-vegetative), or the existing soil topography that may result in accelerated stormwater runoff, leading to soil erosion and movement of sediment into surface waters or drainage systems. Examples of construction activity may include clearing, grading, filling, and excavating. Construction activity includes the disturbance of less than one acre of total land area that is a part of a larger common plan of development or sale if the larger common plan will ultimately disturb one (1) acre or more. “Pre-Development” means stormwater run-off rates and volume calculated using native soils and vegetation. “Pre-Construction” means land use prior to the beginning of a specific construction activity. “Post-Construction” means land use immediately following a specific construction activity. MCM 5 Limitations Any construction activity resulting in any of the following, is not authorized to use infiltration BMPs to meet the terms and condition of MCM5. NPDES permitted industrial activity prohibited from infiltration, Stormwater discharges from vehicle fuieling and maint. Areas, Discharges from areas 1000ft up-gradient, or 100ft down- gradient of karst features, Discharges from areas with less than 3ft separation distance from bottom of infiltration system to elevation of seasonal high groundwater or top of bedrock, Areas from etc etc etc. Draft Definitions Box 1 Box 3 Box 2 Box 4 Box 8 Box 5 Box 6 Box 10 Box 9 Box 7 Box 11 Box 14 Box 13 Box 15 Box 12