2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, 2014 6:30 p.m.  Evergreen and Whispering Pines Neighborhoods.

Slides:



Advertisements
Similar presentations
Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Advertisements

Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
Public Informational Meeting North Street Wood Avenue to St Joseph Avenue Plan no Project Nos , , & City of Marshfield,
Jon Chiglo, PE Project Director 2014 Construction Plans.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
JUNO BEACH PEACE GARDEN PROPOSAL April 15, 2011 Presented by Terron & Megan.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Public Informational Meeting for 2014 Mill-in-place City of Marshfield, Engineering Division 2014 Construction.
Update On CTH. AP (Midway Rd.) & LP Calumet County Highway Department July 15, 2008.
Highway 61/147th Street Intersection Business Meeting April 20, 2010.
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
City of Cudahy Packard Avenue Streetscape Project INFORMATIONAL MEETING #2 Prepared for the City of Cudahy Common Council Packard Avenue Businesses & Property.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
6 th Street Water Main And Street Reconstruction 2013.
City of Bloomfield Hills 2015 Road Improvement Program.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
STA Safety Project PID #76439 December 12, 2006.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Heritage Park Area Construction Update July 28, 2015
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
2016 Mill and Overlay Project
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
June 5, 2017.
Location Map.
DICKINSON AVENUE RECONSTRUCTION
City of Bloomfield Hills
SW Gage Blvd - Street Repair Project
Participatory Road Program neighborhood meeting Donahoo 174th Street
PROJ. 566(17) LOR PID MAJOR WIDENING
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Meadow Lake Boulevard Street Extension Project
URBAN TRAIL PROJECT UPDATES
Walker Street Reconstruction Project 25% Design Public Hearing
Robincrest/Elmgate/ Linneman Improvements Welcome!
2019 Capital Program Title of Presentation
Presentation transcript:

2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :30 p.m.  Evergreen and Whispering Pines Neighborhoods

Agenda  Project Scope  Schedule and Phasing  Overview of the Construction Process  Project Communication  Assessments  Review Commonly Asked Questions  Opportunity to Ask Questions

Project Scope

Evergreen & Whispering Pines Neighborhoods  Mill and overlay & full depth pavement replacement  Spot curb repairs  Sanitary sewer, water system and storm sewer repair and maintenance  Storm water quality improvements

Pinehurst Road and Tamberwood Trail  Sanitary sewer, water system and storm sewer repair and maintenance  Spot curb repairs on south and west sides  Full curb removal and north side of Pinehurst and east side of Tamberwood  Full pavement removal and replacement  Installation of 8-foot concrete trail

Construction Phasing

 Project work phasing is similar for each neighborhood area: Mobilization and traffic control Water system repairs Remove and replace damaged curb Mill or remove pavement Storm, sanitary sewer and water system repairs Restoration Pave street

Storm Sewer & Utility Repair

Spot Curb Removal & Irrigation

Curb Removal and Replacement

Street and Driveway Access

Pavement Removal Processes

Grading and Shaping

Restoration

Pavement Replacement & Overlay

Project Communication  Door Hangers  City Website  InTouch Notification Service  Project Hotline Provides a place to get project updates, register concerns, and set up appointments. Monitored daily by onsite manager.

In Touch Notification  Swiftest method to receive project notifications and updates To sign up for InTouch: 1.Go to www://ci.woodbury.mn.us/www://ci.woodbury.mn.us/ 2.Under E-Services for residents, click 3.Click “Register Now” 4.Fill in the five fields under “Create New Account” and click “Submit” 5.Click “Edit Your InTouch List Subscriptions” 6.Under “Special Notices from City Departments” select “2014 Roadway Rehabilitation Projects” and click “Update”

Project Funding Funding Sources Project Funding Evergreen and Whispering Pines Currell Boulevard (Queens Drive to Bielenberg Drive) Tamarack Road (Radio Drive to Spring Hill Drive)Total Street Reconstruction/ Maintenance Fund $2,641,184.46$0.00$355,547.68$2,996, Storm Water Utility Fund $296,741.44$408.03$24,439.14$321, Storm Water Utility Fund (Quality) $385,300.00$61,495.95$0.00$446, Water & Sewer Utility Fund$199,428.81$4,247.83$42,031.92$245, Final Assessments$2,156,145.29$334,240.95$205,205.08$2,695, TOTALS$5,678,800.00$400,392.76$627,223.82$6,706,416.58

Assessments  Assessment Hearing is scheduled for June 25, 2014 City Council Meeting Single Family Homes  $3, Townhomes  $2,603.11

Assessment Payment  Assessments based on City’s Roadway Construction & Rehabilitation Financing Policy  Total Assessment is $2,695,600  Total Neighborhood Assessment $2,156,145  15-year Term  3.0% Interest  Residents can prepay interest free for 30 days. Payments need to be received by City Finance Department no later than July 25.

Frequently Asked Questions  Project Schedule The general contractor is Hardrives, Inc. Their preliminary schedule is to begin June 10 th. Substantial completion of the majority of the project areas is expected by early October. The contractor’s proposed schedule is very aggressive, and is a “best case” scenario. Please keep in mind the schedule can be delayed by weather or other unforeseen circumstances. For more detailed information, construction notices will be delivered to impacted homes throughout the duration of the project. Also, we STRONGLY RECOMMEND you sign up for the City’s InTouch notification service to provide critical construction updates throughout this project.  Will the streets be open during construction A drivable surface consisting of existing pavement or gravel will be maintained at all times during the construction. There will be days where street access will be difficult when the contractor is working directly in front of your home.  Contractor’s working hours The contractor’s work hours are from 7 a.m. to 7 p.m. They typically work 40-hour weeks from Monday through Friday; however, at times Saturday work may occur.  Driveway access during project You should have access to your driveway at most times throughout the construction process. However, there may be times when you will not have direct access and may need to park on your street or on an adjacent street (e.g., the contractor is working in front of your home, or if new curb is poured in front of your driveway). You will be notified if new curb will be poured in front of your driveway as you will not be able to drive across it for approximately five to seven days while the concrete cures.

Frequently Asked Questions  Garbage and mail service Regular garbage/recycling and mail service should be maintained throughout the project. Those companies will be regularly informed of the work being performed.  Irrigation systems, underground dog fences, and other landscaping features within the City right-of-way The City right-of-way for streets within this project area is 60 & 80 feet wide. Landscaping, sprinkler systems, underground dog fences, basketball hoops or any other private features that are within the right- of-way may be damaged or require modifications prior to construction starting. On this project, damage is most likely to occur during the removal and replacement of damaged concrete curb and gutter and storm sewer catch basin castings. In both cases, the ground is typically excavated up to three feet behind the curb into the boulevard. Before construction begins, the project inspector will paint the curb that will be replaced by the contractor. It is then the responsibility of the property owner to determine if any private features are located in the right-of-way and to either remove them from the construction limits or make arrangements with the project inspector to make the contractor aware of their presence. If the contractor knows the location of these facilities, they may be able to minimize or avoid damage. UNDER NO CIRCUMSTANCES WILL THE CITY, OR THE CONTRACTOR, REPAIR OR REPLACE ANY PRIVATE FEATURES THAT ARE DAMAGED WITHIN THE CITY RIGHT-OF-WAY. If you have any questions regarding any private features that may be impacted or whether curb is going to be removed in front of your property, please contact the project inspector by calling the Project Hotline number

Frequently Asked Questions  Turf restoration Curb replacement, grading, and utility work may result in the disruption of the boulevard adjacent to those locations. Any turf that is removed will be replaced with seed and hydro mulch. The contractor is responsible to warranty the establishment of the seed for 45 days after installation. After the warranty period ends, all future repairs will be the responsibility of the property owner. Watering permits will be distributed to affected homeowners at time of initial restoration.  Street signs All yield signs and stop signs that do not meet criteria established by the “Minnesota Manual of Uniform Traffic Control Devices” will be removed as part of this project (typically at three-legged intersections). Other street signs that are in poor condition will be removed and replaced.  Will the contractor offer residential driveway repair and replacement The contractor for this project will not be offering private driveway work.

Questions  Specific project questions  Staff will be available after meeting to answer one on one questions  Staff will provide assistance with InTouch subscription and City website access