 Uncertain outcome, failure, loss, hazard, threat to profit.  Projects are unique in nature and imply risk uncertainties  Risk level of a project is.

Slides:



Advertisements
Similar presentations
Chapter 10 Learning Objectives
Advertisements

Different Types of Market Structures
Chapter 7 Managing Risk.
The Land Market. Is the market for land different from that of other goods? Is there a fixed supply of land?
AACEI Contingency Forum Contingency Management
Chapter 10 Project Cash Flows and Risk
RISK MANAGEMENT PROGRAM AND PROJECT MANAGEMENT APPLICATION OCTOBER 6, 2006 Presented by Don Devieane, CGA, Manager Risk Management Program.
INTRODUCTION TO APPLIED WELFARE ECONOMICS AND BENEFIT-COST ANALYSIS.
October 29,  Fiscal Risks identified and quantified in Mexico: ◦ Budgetary impact of fluctuations in key assumed macro-economic variables ◦ Long-term.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Uncertainty and Risk Analysis Dave Ludwick Dept. of Mechanical Engineering University.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Project Estimation Describe project scope, alternatives, feasibility.
Chapter 10 Sensitivity and Breakeven Analysis. Handling Project Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Project Risk Management. Learning Objectives  Understand what risk is and the importance of good project risk management.  Identify project risks, describe.
Project Risk Management Presenter: Phil Harman, PMP Executive Director for ZCS Internal PMO and Enterprise Project Management (EPM) Practice Manager September.
Beyond NPV – Simulation, Options and Trees
Role and Components of Project Evaluation
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
Risk management process
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
MAGISTER ILMU KOMPUTER (M.Kom)
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
Marketing Plan. Industry Analysis Industry Analysis Industry Analysis National/local trends National/local trends Competitor Analysis Competitor Analysis.
Value Proposition of the Marketplace Making Sense of Sensors Network for the Smart City & Climate Change.
Small business management and Entrepreneurship
Course on Professionalism Statement of Principles.
New Venture Finance. First steps – how much $ does your new venture need? Must assemble pro forma financials to test assumptions (and convince investors.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
1 Conference Call 1Q12.  Reduction of 1.8% in consumption compared to 1Q11, mainly influenced by the residential class, due to lower temperature in the.
AGEC 407 Investment Analysis Time value of money –$1 received today is worth more than $1 received in the future Why? –Earning potential –Risk –Inflation.
Feasibility Analysis Outline
Team Assignment 10 K15T02-Team Scope 2.Risk Management Process 3.How to determine the impart of risk 4.Top 10 risk of Viking.
The Business Plan: Creating and Starting the Venture
FINANCE IN A CANADIAN SETTING Sixth Canadian Edition Lusztig, Cleary, Schwab.
Project Management It is a specialized branch of management capable of differentiation from others based on a variety of factors which includes the organization.
Project Risk Management. Risk-Defined A situation involving exposure to danger; “The combination of the probability of an event and its consequences”
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
 Start with a specific measurable goal ◦ Save $ to open an IRA  Pay Yourself First ◦ Set up a direct deposit to a personal club account. ◦ Open.
Risk planning Risks can be dealt with by: Risk acceptance – the cost of avoiding the risk may be greater than the actual cost of the damage that might.
Risk. Step 1-Risk identification Analyze the project to identify the source of risk Step 2-Risk Asessment Assess risk interms of Severity of impact Likely.
1 Chapter 3 Environmental Scanning and Industry Analysis By Khursheed Yusuf.
 EVOLUTION PROJECT REPORT PROJECT PROFILE PRE INVESTMENT STUDIES TECHNO ECONOMIC FEASIBILITY STUDIES PROJECT REPORT DETAILED PROJECT REPORT.
FIA Technical Workshop March 2015 Prepared by Yih Pin Tang.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
EN Regional Policy EUROPEAN COMMISSION Francesco ANGELINI European Commission, DG for Regional Policy Coordination Unit – Major Projects Team.
Risk Management in Software Development Projects Roberto Torres Ph.D. 11/6/01.
Chapter 17 How External Forces Affect a Firm’s Value Lawrence J. Gitman Jeff Madura Introduction to Finance.
WEEK 7 Project Management Magister Desain Universitas Komputer Indonesia.
Project Estimation Describe project scope, alternatives, feasibility.
Capital Budgeting: Estimating Cash Flows and Analyzing Risk
Country Risk Analysis.
INVESTMENT RISK APPRAISAL
Cash Flow Estimation and Risk Analysis
Risk Identification Canvas – New Product Launch
Project Management: Risk, Procurement, Integration Professor Akhilesh Bajaj The University of Tulsa ©Akhilesh Bajaj All Rights reserved.
Identifying and Prioritizing Risks
BUSINESS ENVIRONMENT AND LAW
Project Risk Management
An Introduction to Macroeconomics
Software Project Management (SPM)
An Introduction to Macroeconomics
Elements of Slide Show MA 664 May 2007.
إدارة المخاطر في المؤسسات المالية الإسلامية
The marketing environment
Project Management A Managerial Approach
Unsystematic Risk It is unique and peculiar to a firm or industry.
How did they answer the three basic economic questions
Presentation transcript:

 Uncertain outcome, failure, loss, hazard, threat to profit.  Projects are unique in nature and imply risk uncertainties  Risk level of a project is associated with the level of uncertainty about factors such as technology, time schedules, cost budgets  Risk = f ( likelihood, impact)

 Internal – promoters, stakeholders and project managers have control over them  Market risk  Technical risks  Price risk  Project completion risk  External - promoters, stakeholders and project managers have no control over them  Political risk  Interest rate risk  Exchange rate risk

 Risk identification  Risk Quantification (Analysis)  Risk response development ( how to handle risks)  Risk response control  Risk monitoring

 Schedule risk  Capital cost risk  Schedule and cost risk  Economic feasibility risk  Contractual risk  Pre completion risks  Post completion risks  Financial risks  Country risks

Ordinal scale (example) Very lowLowModerateHighVery High Cardinal Scale (example) CostInsignificant cost increase <5% cost increase 5-10% cost increase 10-20% cost increase > 20% cost increase ScheduleInsignificant schedule slippage <5% schedule slippage 5-10% schedule slippage 10-20% schedule slippage > 20% schedule slippage ScopeScope decreases barely noticeable Minor areas of scope are affected Major areas of scope are affected Scope reduction unacceptable to the client Project end item is effectively useless QualityQlty degradation barely noticeable Only very demanding applications are affected Qlty reduction requires client approval Qlty reduction unacceptable to the client Project end item is effectively unusable

 Avoid  Reduce  Transfer  Accept  Contingency

RISK ANALYSIS OF SINGLE INVESTMENTS

Estimation error Quality of mgmt Project Specific Unanticipated actions of competitors Competitive Unexpected Technological developments Regulatory changes Industry Specific GDP growth rate Interest Rate Inflation Market Exchange rate Political risk International

(Rs. ‘000)Year 0Years (1-10) Investment(20000) Sales18000 Variable 66.67% Fixed costs %2000 PBT %1000 PAT2000 CFAT4000 Discount 12%5.650 Present value22600 Net present value2600

Scenario Analysis  Pessimistic (worst)  Expected  Optimistic (best)