Cool Roofs in California’s Title Building Energy Efficiency Code

Slides:



Advertisements
Similar presentations
Delta Confidential 1 5/29 – 6/6, 2001 SAP R/3 V4.6c PP Module Order Change Management(OCM)
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
SEATTLE ENERGY CODE ENFORCEMENT PROCEDURES: PLAN REVIEW AND INSPECTION John Hogan, A.I.A., P.E. Seattle Department of Planning and Development 700 Fifth.
Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
RESNET Federal Tax Incentives for Building Energy Efficiency RESNET Web Site
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
2007 PAVEMENT MARKING ACTIVITIES AND PERFORMANCE
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Air Conditioners.
ACTIVE LEARNING PROCESS
Arizona Priority Lists Charlie Gohman Az Dept of Commerce Energy Office.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Building Data Entry NEAT/MHEA Common Errors Oak Ridge National Laboratory Weatherization.
Building a Better Future Stretch Building Code October 15, 2009.
ENERGY STAR ® Qualified Fenestration Products ENERGY STAR Meeting – June 4, 2008 Steve Hopwood Office of Energy Efficiency.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Transitioning to Version 8 Building Data Entry Issues in NEAT/MHEA and Oak Ridge National.
Mestek Overview Founded in Westfield, MA in 1946 as Sterling Radiator by John E. Reed 4 employees in a rented garage Produced only hydronic finned-tube.
Solve Multi-step Equations
3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 1 UPA Package 3, Module 2 COPING WITH THE EFFECTS OF.
Energy Efficiency: Benefits to Apartment Owners & Tenants
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
Module Reading Plans and Elevations
DBE Uniform Reporting: Understanding and Avoiding Common Errors Office of Civil Rights January 2014.
Identifying and Air Sealing the Building Envelope
Andrea Mariottini Riello Gas Boilers Division
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
PRODUCTIVITY MANAGEMENT IN ASELSAN Tuncay İBİŞ ASELSAN A.Ş. Energy Manager Facilities and Support Services Director.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
2 |SharePoint Saturday New York City
Green Eggs and Ham.
VOORBLAD.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
1 Training Package Re-Design and its opportunities.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Energy Saving in Hospitals: Hong Kong Initiatives
Subtraction: Adding UP
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Januar MDMDFSSMDMDFSSS
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
1 DOE Data Center Tools Suite Data Center Energy Profiler (“DC Pro”) Lawrence Berkeley National Laboratory ANCIS EYP Mission Critical Rumsey Engineers.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Cool Roofs in California’s Title 24 Building Energy Efficiency Code 2005 Update and 2008 Preview CRRC.
SEEA Presentation to SEES March 2006 SEEA Presentation to SEES February 2006 SOUTHEAST ENERGY EFFICIENCY ALLIANCE.
C A L I F O R N I A E N E R G Y C O M M I S S I O N The ARMA Message: Suggestions for Communicating California’s Title 24 ARMA Communications Committee.
City of San Mateo 2016 Reach Code
Presentation transcript:

Cool Roofs in California’s Title 24 2005 Building Energy Efficiency Code Elaine Hebert, Energy Efficiency Specialist California Energy Commission, Sacramento

What We Will Cover Today How Cool Is a Cool Roof? How California’s Title 24 (Part 6 is Energy Code) Works Title 24 Cool Roof regulations Contact Information/Resources

How Cool is a Cool Roof? (1) Sacramento, CA July 12, 2000 89 ºF, about noon, with local delta breeze BUR topped with aggregate 159 °F BUR topped with capsheet 158 °F EPDM single-ply 173 °F Courtesy Dan Varvais, Applied Polymer Systems

How Cool is a Cool Roof? (2) Sacramento, CA July 12, 2000 89 ºF noon delta breeze Cool single-ply 121 °F Cool coating over BUR 108 °F Courtesy Dan Varvais, Applied Polymer Systems

This is important because we still have an electricity crisis. Cool Roofs and Energy Cooler roof surfaces can save 15% of electricity needed to cool a building This is important because we still have an electricity crisis. Not quite enough supply to meet demand and have mandated reserve Transmission lines – aging, inadequate capacity

Adequate electricity supplies help prevent blackouts in California (this blackout in the Midwest equaled about $6B in damage)

Through Energy Efficiency Measures, California Keeps Per Person Use of Electricity Steady While Rest of US Goes Up

Title 24, Part 6, California’s Energy Code: How It Works (1) Sets an energy budget for residential and nonresidential buildings New buildings and additions/alterations (alterations can include re-roofing) Budget is in kBtu/square foot/year Budget varies by climate zone 16 climate zones in California

California’s 16 Climate Zones www.energy.ca.gov/maps/climate_zone_map.html Climate Zone 1, coastal, foggy most of year Climate Zone 16 – mountains, snows in winter, less than 80°F in summer Many inland climate zones – mild winters, hot dry summers (population increasing most, air conditioning needs increasing)

Title 24, Part 6: How It Works (2) Regulates the Following: Insulation levels in walls, floors, and ceilings/attics/roofs Tightness of air ducts Allowed square footage of windows, doors, and skylights And more ... Efficiency of Lighting Windows, doors, skylights Water heating systems Space heating and cooling systems Nonresidential Roofs (as of Oct. 2005)

Title 24, Part 6: How It Works (3) How to Meet the Energy Budget Design the building or addition/alteration with appropriate energy efficiency features Submit documentation to bldg. dept. with permit application Construct the building/addition/alteration with those features Building Inspectors are responsible for confirming that the installed energy features match the features in the paperwork you submitted

Meeting the Energy Budget: Design and build a building … …using items from previous slide that comprise: Prescriptive Measures OR Performance Method Mandatory Measures (for energy efficiency) AND Provide documentation to bldg dept with bldg permit application

“Prescriptive” means - - Title 24 provides a list of the minimum efficiencies of some energy features. The list is like a prescription for how to construct a building to meet the energy budget. Follow the ‘prescription’ exactly to construct the building and it automatically complies with Title 24 – no calculations or computer needed

“Performance” means - - Model how the entire building will perform energy-wise using approved computer program – Allows flexibility - can trade off among energy efficiency measures – Energy budget for your (modeled) building is established by a similar modeled building (“standard building”) having all mandatory and prescriptive measures Buy software yourself, or hire a Title 24 consultant - see www.cabec.org for trained Calif. energy consultants; most have the software

Cool Roofs Are a Prescriptive Measure for Nonresidential Buildings (Cool roofs are NOT mandatory) WHICH MEANS if you use the prescriptive compliance method, you must install a cool roof (or do an allowed tradeoff among building envelope components only) OR if you use performance compliance, you can install a cool roof or not, but a cool roof helps set the energy budget for your proposed project

What is a (Prescriptive) Cool Roof under California’s Title 24 Energy Standards? Roof material must Be rated through Cool Roof Rating Council (Title 24, Part 1, §10-113) Be properly labeled (Title 24, Part 1, §10-113) Have reflectance ≥ 0.70 and emittance ≥ 0.75 (or if emittance is lower, need higher reflectance) [Part 6, §118(i)1 and 2] For coatings liquid-applied in the field, meet performance requirements [Part 6, §118(i)3 & Table 118-C]

What Are Reflectance and Emittance? Reflectance – straightforward – sun’s energy (heat) bouncing off roof surface Emittance – not ALL energy bounces off; some is absorbed. Absorbed energy is given off – emitted – at different rates by different materials. “Emittance” is a measure of how quickly or efficiently the absorbed energy is given off. Important because slowly emitted heat has time to penetrate downward into the building - - undesirable in most Calif. climate zones; increases air conditioning

Title 24 (Prescriptive) Cool Roofs Apply to - - Conditioned space (heated or cooled) Low slopes (≤ 2:12) Nonresidential buildings only, Occupancy Groups A, B, E, F, H, M, S, and U (next slide) EXCLUDES Occupancy “I”- hospitals, prisons, mental institutions, other institutions hotels/motels refrigerated warehouses

Occupancy Groups (from CBC/UBC) A = Assembly – theaters, churches, restaurants, etc B = Businesses – office buildings, colleges/univers. E = Educational facilities (12th grade & under) F = Factories, low and moderate hazard H = High hazard facilities M = Mercantile; sale of merchandise S = Storage, low and moderate hazard U = Utility – garages, towers, agric. buildings, etc Expanded list on page 8 of www.energy.ca.gov/2005publications/CEC-400-2005-053/CEC-400-2005-053.PDF

Cool Roofs Are Only Optional (NOT prescriptive, NOT mandatory) for - - Hotels and motels ALL residential buildings (including houses and high-rise apartments/condos) Unconditioned buildings Refrigerated warehouses, other spaces held under 55°F, and spaces held over 90°F Buildings cooled by evaporative coolers/swamp coolers Roofs with slopes over 2:12

Take Note Qualifying historic buildings (per Title 24, Part 8) are exempted from Title 24, Part 6 energy standards.

Cool Roofs 2005 - Nonresidential Re-roofing Still prescriptive If >50% or >2,000 sf of low-sloped roof, whichever is less, is being replaced, recovered, or recoated, cool roof “requirements” kick in [§ 149(b)1B] Install a cool roof OR Install a noncool roof plus roof insulation This is how a garden roof or BIPV* roof can be installed when re-roofing Coming soon: easy calculator for how much insulation *BIPV = Building-integrated photovoltaics (solar electric pv modules become the roof)

Reroofing Existing Unconditioned Warehouse Containing Conditioned Office Space - Cool Roof?? Consider two cases: 1. Conditioned space’s ceiling is lower than warehouse roof

Unconditioned warehouse containing conditioned space (see the air ducts!) Energy Commission considers this building unconditioned, so no cool roof rules are triggered

Case 1 – Reroofing unconditioned warehouse containing conditioned office – walls of office do not reach warehouse roof No cool roof requirements are triggered!

Case 2 – Reroofing unconditioned warehouse containing conditioned office – walls of office reach up to warehouse roof (Sorry, no photo yet) Cool Roof requirements apply OVER THE CONDITIONED SPACE(S) ONLY not over the entire warehouse roof

TAKE NOTE! Energy Star is a different program (Federal not state) An Energy Star roof does not automatically qualify as a cool roof in California Cool Roof Rating Council’s rated product directory has over 650 roof materials – some comply with Title 24 and some don’t

Excerpt from CRRC Rated Product Directory (www.coolroofs.org)

NOTE: “Partly” Cool Roofs Roofing materials not meeting the FULL 0.70 reflectance/0.75 emittance Title 24 levels can get “partial” energy credit for some building types when using computer performance modeling and overall envelope prescriptive compliance Materials NOT rated through CRRC are assigned a default value in Title 24 for reflectance – it is LOW – so you must meet the energy budget using other energy-efficient features

Help Is on the Way Energy Commission has started a collaborative for training on cool roof regulations for Roofing Contractors Building departments And eventually, architects/specifiers, building owners, consultants

Resources Title 24 Website – www.energy.ca.gov/title24 (Title 24 Energy Standards and support documents) Title 24 Energy Hotline - 1-800-772-3300 (within CA), 916-654-5106 (outside CA), title24@energy.state.ca.us Title 24 Office – 916/654-4064 Elaine Hebert – 916/654-4800, ehebert@energy.state.ca.us Approved energy compliance software: MicroPas (residential), www.micropas.com EnergyPro (res & nonres), www.energysoft.com

Resources Cool Roof Rating Council - www.coolroofs.org, (866) 465-2523 CABEC (Calif. Assoc. of Building Energy Consultants) - www.cabec.org, (866) 360-4002 Title 24 Energy Information Videos (free) - www.energyvideos.com Coming soon: cool roof website, insulation calculator, shortened form for cool roof reroofing permits, training materials for roofing contractors & other parties, 2008 Standards

Thank you!