24th Month Meeting WP4 Presentation Florence, GZE, 21 February 2013 www.3D-LightTrans.com Benoit LAURENT Federal-Mogul Systems Protection.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Delta Confidential 1 5/29 – 6/6, 2001 SAP R/3 V4.6c PP Module Order Change Management(OCM)
3D-LightTrans Large scale manufacturing technology for high performance lightweight 3D multifunctional components Abstract3D-LightTrans Concept Project.
Using Matrices in Real Life
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Finite Element Method CHAPTER 9: FEM FOR 3D SOLIDS
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Objectives: Generate and describe sequences. Vocabulary:
SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
Virtual Biodiversity ViBRANT Scripting Life: goals & logistics for day 2 Vince Smith Natural History Museum, London ViBRANT Virtual Biodiversity.
Contents of the EHES Joint Action Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
Brest, 27 – 29 of February COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th.
1YMLP-D Introduction to the FutureNEM project D2 Concertation meeting Brussels- 3-4 February 2010.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
ZMQS ZMQS
1/23 Dipl.-Ing. (EUR ING) Jan Kai Dobelmann MSc DGS-Vize-Präsident MicroCHEAP Kopenhagen MicroCheap Work Package 5.
Richmond House, Liverpool (1) 26 th January 2004.
The project 3D-LightTrans aims to provide a ground-breaking, highly flexible, efficient and adaptable manufacturing chain for the production of integral.
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
EGov-Bus 1st year review Advanced eGovernment Information Service Bus eGov-Bus, FP6-IST STP 1st Formal Review Meeting , Brussels eGov-Bus.
Electric Bus Management System
Presentation of the proposed Annex 19 – Safety Management
Understanding patent claims (b)Heating element for a washing machine.
RES-H Policy Project administration, contractual and financial issues
WEB- BASED TRAINING Chapter 4 Virginija Limanauskiene, KTU, Lithuania.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EUROCHIP 3 WP1 and WP3 Meeting Feeding the project Evaluation 17 September 2010 Sofia, Bulgaria.
TENCompetence Management Issues: WP1 Eric Kluijfhout.
4 October 2001 SEESCOASEESCOA STWW - Programma Software Engineering for Embedded Systems using a Component-Oriented Approach Vergadering Gebruikerscommissie.
VOORBLAD.
Last Planner ® National Capital Region Community of Practice Victor Sanvido – Southland Industries Matt Bruening – Southland Industries 1.
Squares and Square Root WALK. Solve each problem REVIEW:
Data Management Seminar, 8-11th July 2008, Hamburg Survey System – Overview & Changes from the Field Trial.
The Euronet-PBL Project: Overview of the Work Plan Pekka Kämäräinen University of Bremen, ITB, Presented at the 1st International Meeting of the Euronet-PBL.
Glasgow, , 1 W. Raskob (KIT) European Technology Platform on Preparedness for Nuclear and Radiological Emergency Response and Recovery NERIS-TP.
Project's financial status
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Further.
1 Status Report about Tasks of IBMT PolExGene – 12 month technical meeting , Helsinki, Finland Heiko Büth.
RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger
FPS HEALTH, FOOD CHAIN SAFETY AND ENVIRONMENT 1 Joint Action on Health Workforce Planning and Forecasting M.Vallimies-Patomaki, J.Lammintakanen Brussels.
FPS HEALTH, FOOD CHAIN SAFETY AND ENVIRONMENT 1 Joint Action on Health Workforce Planning and Forecasting Zuzana Matlonova Brussels – April 11th, 2013.
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
Addition 1’s to 20.
25 seconds left…...
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Developing an In-flight Fire Condition.
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
Week 1.
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
We will resume in: 25 Minutes.
1 Phase III: Planning Action Developing Improvement Plans.
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Management Accounting: A Business Partner Chapter 16.
Presentation transcript:

24th Month Meeting WP4 Presentation Florence, GZE, 21 February Benoit LAURENT Federal-Mogul Systems Protection

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program Agenda  Brief overview of WP  Background  Structure and progress update  WP4 Highlights during M18-M24  Selected exploitable results  WP4 Future Planning  Discussion Points 2

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP4 – Manufacturing processes of 3D TRP final compound Research partners  1 – AIT  6 – Ugent  8 – TUD  9 – Leitat Industrial partners  3 – CRF  4 – Coatema  5 – FMSP  15 – Bentley  17 – Promaut Work Package objective  WP4 develops the models, technologies and process adaptations to implement the final part draping and thermoforming. This WP is closely linked to WP3, developing former industrial steps, and overseen by WP2. 3

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP4: Structure and progress update 4 Tasks:  Task 4.1: Final production of the TRTC component 50%  Task 4.2: Product finishing processes and assembly of module components 20% Deliverables:  D4.10: Supervised fixated preforms process M42 – Not complete  D4.11: Ready made technologiesM42 – Not complete

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Highlights M18 – M24 Task 4.1a Draping 5  In coordination with TUD simulations: draping tests over a 450mm hemisphere.  Manual tests simulating an automatic operation using a “push and hold” sequence.  Two hands at a time for draping.  Needles for fixing fabric around the base of the part.  Need for the usage of more or wider robot fingers for reducing space between them and prevent the wrinkling.  Design and building of passive grippers for robotic draping  The Fingers: for holding, dragging and pushing the fabric.  The Jellyfish: for brushing along the surface.

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Highlights M18 – M24 Task 4.1a Draping 6  Following the same draping strategies previously tried.  Tests carried out with a two arms Motoman robot.  Need for increasing the number of “tentacles” and raise their rigidity.  Introduction of active elements into the gripper or the tool.  Manipulation means studied in collaboration with PROMAUT, in case long displacements tasks are required during draping.  Vacuum: no affectation of A-class surfaces, high consumption, overcome porosity.  Needles: hinder surface finish, low consumption, poor holding force.

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Highlights M18 – M24 Task 4.1b Fixation 7  There is a significant melting of the PET-fibers after exposition to 6-9 flashes at a frequency of 2 flashes / s.  The result looks very similar to earlier trials with PP-fibers.  So the combination Glass/PET should be fixable in the same way as Glass/PP. The PET fibers should be black, mixed with white or colorless glass fibers.

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Highlights M18 – M24 Task 4.1d Thermopressing 8  2 nd Process campaign – Flat mold  Glassfibre 3D-Architecture + PP-Matrix

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Highlights M18 – M24 Task 4.1d Thermopressing 9  Design  Complex 3D-Geometry (Butter dish)  Manufacture  Heated top/bottom tools  Interim process campaign  Pure PET-Plate  Material issue  PP/PET  process investigations on 220 C°  initial U-Profile manufacture  PET  process investigations on 270 C°

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Highlights M18 – M24 Task 4.2 Product finishing, assembly 10  Metal - GFRP  Mold design  Mold manufacture Top stampBottom Die

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Highlights M18 – M24 Task 4.2 Class A Finish 11  Involved parameters Substrate quality Paint materials Process parameters  Testing requirement established Important characteristics Secondary characteristics  Processes: Formed film (GE plastic/Azdel Inc ) Paint Coating  Literature review Amorphous substrates have higher gloss than semicrystalline matrices Matrix-rich layer improves gloss Adding nano-particles (e.g. CaCO 3 ) can enhance gloss  Patent review Resin rich surface layer (powder or film) Polished mould Metal sheet on composite

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program Selected WP exploitable results 12 N.Exploitable result Exploitable result manager Beneficiaries involved Relevant WPs Relevant deliverables Progress % Expected Date of achievement

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP Future planning  WP4 meeting: 2013 March 15th in Crepy, France  Milestone 10: Fixation Process (M30 - Coatema)  Process for on-line/off-line fixation of high draped multilayer textiles available and functional  WP4 / WP6 Interractions a4.1d4.1b 4.1c c 3.2a a2.2b2.2c2.3 WP1 WP6 WP3 WP2 WP4 WP

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP Future planning 14

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP Future planning 15

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program WP 4 Discussion points  WP4 March meeting agenda discussion: Draping Missing input and status 3D textile draping Gripping strategy Fixation Strategy for fixing draped part Thermoforming Lessons learned PET process parameters acquisition 3D textile thermoforming strategy Finishing Sub-part assembly Part integration Class A finish Model and simulation process parameters (D2.6) 16

Florence, GZE, 21 February 2013 WP4 | BL A Project co-funded by the EC in the 7 th Framework Program Thank you for your attention! Questions? 17