Ohio Department of Transportation District 9 I RONTON -R USSELL B RIDGE R EPLACEMENT 2012-2016.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Dennis L. Edwards Tunnel
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
ODOT Structure Project Manager Training
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Why a Bus Fee Increase is Needed Texas States current bus contract expires the end of fiscal year 2014 (August 2014). – 10 year bus contract plus one extension.
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
HELP !!!!!! International border bridge located over the Rainy River on the Minnesota Trunk Highway 72 and Ontario Provincial Highway 11 This route provides.
St. Croix River Crossing S. P
Bridge Building 101 Presented by KEEN.
Copyright © Cengage Learning. All rights reserved.
LESNER BRIDGE REPLACEMENT PROJECT
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Bridge Enhancements 07/22/2013 Route 47 Missouri River Bridge Bridgescape, LLC.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Chapter 34 Bridge Construction.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.
The Millau viaduct is part of the new E11 expressway connecting Paris and Barcelona and features the highest bridge piers ever constructed. The tallest.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
1 Cold Spring Canyon Bridge Proposed Suicide Barrier Project Information Meeting & Open House Sara von Schwind Caltrans Project Manager.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
Viaduc de Millau. Project timeline 28 June28 June 1989: governmental approval of the middle route October19 October 1991: selection of the.
1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
1 Bridges The William H. Harsha Bridge is a cable- stayed bridge that spans the Ohio River between Maysville, Kentucky, and Aberdeen, Ohio. About how long.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
High Bridge Re-Deck Project
Blatnik Bridge Management Study
Clinton Street Bridge over the Maumee River
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Construction Engineering and Management National Central University
Replacement of Vehicle Bridge over Spring Creek
The Great Belt East Bridge
Replacement of Vehicle Bridge over Spring Creek
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Ohio Department of Transportation District 9 I RONTON -R USSELL B RIDGE R EPLACEMENT

Inception & Design  In 1999, ODOT undertook a replacement project study, which was furthered with four corridor options for the construction of a new bridge. By 2003… EIS completed Preferred alternative selected ROD issued  The alignment to relocate the bridge from Second and Jefferson streets in downtown Ironton to the U.S. Route 23 viaduct, south of downtown Russell in Kentucky, was selected based on public opinion and following numerous meetings with the general public and local community leaders from both Ironton and Russell. Ironton-Russell Bridge Replacement

Inception & Design  Original cost estimate: $75-$80 million (2005) Final state’s estimate: $99 million (2006)  Original contract bid amount: $109 million (2006)  Cost inflation at bid letting due to structure type, design, geometrics and materials.  Bids were rejected; project was reviewed and evaluated for redesign.  Redesign process began in late 2006, with consultants undertaking changes to the structure type, working within the selected footprint to maximize cost efficiency for construction of a new bridge.  Changes included: Constructing two towers rather than one Eliminating the sidewalk Reducing the overall width Ironton-Russell Bridge Replacement

 Two-lane, cable-stayed bridge consisting of three spans: Total length = 1,640 feet Width = 32 feet Navigational clearance = 805 feet Although other bridge types were considered, the cable-stayed design was selected due to construction cost, aesthetics, constructability, maintenance, serviceability and inspection.  Two, Delta-shaped cast-in-place, reinforced concrete towers: Height = feet (top of the towers to the river at normal pool) The towers measure feet from their top to their base at the deck. Design & Specifications

Ironton-Russell Bridge Replacement

 One hundred twenty cables: Fifteen pairs in the Ohio back span Thirty pairs in the main span Fifteen pairs in the Kentucky back span Made of steel, the number of strands in each of the cables varies from a minimum of 14 located in the cables nearest both towers to a maximum of 35 in the cables farthest from the towers on the back span sides. The cables at the mid-span contain 31 strands each.  One abutment, one pier on the Kentucky approach; four piers in the main span (two of which are towers); and one abutment, three piers on the Ohio approach. Pier 2 is tallest pier at 80 feet Pier 1 is widest pier at 60 feet All abutments, piers and towers will be cast-in-place, reinforced, concrete. Design & Specifications

Ironton-Russell Bridge Replacement

 The contractor for the project is Brayman Construction Corporation.  Construction began March 2012; as of February 2013, construction was approximately 20 percent completed.  The interim completion is Spring 2016, with the new bridge open to traffic.  Final completion for the entire project, which includes demolition of the existing bridge, is set for Fall 2016 – Spring  Construction cost is approximately $81.4 million, which is funded through ODOT’s Major New Bridge Program. Schedule & Cost

Ohio Department of Transportation District 9