Extract from Hot summary of the Fourth GSICS Users Workshop Fred Wu, Sebastien Wagner, Jerome Lafeuille Sopot, Poland, 4 September 2012.

Slides:



Advertisements
Similar presentations
GSICS Partnerships: CEOS WGCV IVOS, X-CAL, GRUAN
Advertisements

GRWG Report Tim Hewison 1 November Outline Status Updates – For Information only –GEO-LEO IR –GEO Solar –Lunar –Archive Re-Calibration Products.
CEOS-CGMS Working Group Climate, Darmstadt, Germany, 5-7 March 2014 Coordination Group for Meteorological Satellites - CGMS COORDINATION GROUP FOR METEOROLOGICAL.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Draft considerations on calibration and the.
Documenting GSICS as an element of the WMO Integrated Global Observing System 16th GSICS Executive Panel, Boulder, May 2015 Item 6 Jérôme Lafeuille.
Water Supply Planning Initiative State Water Commission November 22, 2004.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
© Copyright 2011 John Wiley & Sons, Inc.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California CLARREO GPS RO/AJM-JPL.
CI R1 LCO Review Panel Preliminary Report. General Comments –Provide clear definition of the goals of the phase (e.g. inception), the scope, etc. in order.
CGMS-42, May 2014, Guangzhou, China Coordination Group for Meteorological Satellites - CGMS GLOBAL SPACE-BASED INTER-CALIBRATION SYSTEM (GSICS) CGMS-42-WMO-WP22.
QA4EO in 10 Minutes! A presentation to the 10 th GHRSST Science Team Meeting.
GRWG Agenda Item Towards Operational GSICS Corrections for Meteosat/SEVIRI IR Channels Tim Hewison EUMETSAT 1.
GSICS Data and Products Servers Volker Gärtner (EUMETSAT) For GSICS Data Working Group.
Agency xxx, version xx, Date xx 2016 [update in the slide master] Coordination Group for Meteorological Satellites - CGMS Introduction to GSICS Presented.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO A WMO perspective on GSICS Joint Meeting of the.
GSICS web meeting on Planning for Annual GSICS WG meeting Agenda.
Recommendations to GSICS from international working groups GSICS meeting, March 2015, New Delhi, India Rob Roebeling.
16-20 March, GSICS Coordination Centre (GCC) Report Larry Flynn and Manik Bali 2015 GSICS Annual Meeting New Delhi, India March 16-20,
June, GSICS USER GUIDE Using GSICS Products and Services Manik Bali, Tim Hewison, Larry Flynn and Jerome Lafeuille 2016 GSICS Executive Panel Meeting.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Considerations on calibration and the role.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Documenting GSICS as an element of the WMO Integrated.
EUM/OPS/VWG/11/3248 Issue 1 04/09/2011 Eumetsat Conference, 3-7 September 2012, Sopot, Poland Satellite Event Working Group GSICS Workshop, 4 September.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
Community of Practice K Lead Project Team: الالتزامالتحفيز التفكير المؤسسي المرونةالتميزالشراكةالاستقامة.
Marianne König, Tim Hewison, Peter Miu
Users' Requirements During Algorithm Development
Summary Outcome of the First GSICS Users’ Workshop
Strategy for combining corrections for VIS/NIR+IR channels and plotting tool S. Wagner, T. Hewison (EUM) M. Takahashi (JMA)
Jerome Lafeuille WMO Space Programme Office
GSICS Collaboration Servers a Vehicle for International Collaboration Status 2011 Peter Miu EUMETSAT.
Planned Activities of GSICS Microwave sub-group
GSICS Coordination Center (GCC) Report
Report to 8th GSICS Exec Panel
Lunar Calibration Workshop Activities
Second Joint GSICS-IVOS Lunar Calibration Workshop
Second GSICS Users’Workshop:
Workshop on best practices on pre-flight and onboard calibration
Updates on GSICS Operation Plan
Masaya Takahashi Meteorological Satellite Center,
GSICS Data Management and Availability to Users
Actions and Recommendations of the Joint Session
Jo Schmetz1 on behalf of Tim Hewison1 EUMETSAT
GSICS Data Management and Availability to Users
GRWG VIS/NIR sub-group briefing report
VIS/NIR sub-group discussion
Update on the GSICS Procedure for Product Acceptance (GPPA)
2b. GSICS Coordination Centre (GCC)
Tim Hewison1 (1) EUMETSAT
Contribution to Agenda Item 8
WGCV-GSICS interactions
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 01 January 2019 Report of GRWG: Aims of meeting Review of Actions Proposal.
Status of the EUMETSAT GSICS DCC product
Lunar Calibration Workshop Wrap up, next steps and list of actions
GSICS Research Working Group Web Meeting :00-13:00 UTC Reference Instruments and their Traceability.
GSICS Coordination Center (GCC) Report
Preparatory Web meeting for 2018 Annual Meeting in Shanghai, China
Progress toward DCC Demo product
Hot summary of the Fourth GSICS Users Workshop
SCOPE-CM Statement of Needs John Bates (NOAA, SCOPE-CM Executive Panel Chair) Lothar Schüller (EUMETSAT, SCOPE-CM Secretariat)
Formation of IR Sub-Group and Reference Selection
CEOS WGCV (IVOS) potential interactions with GSICS
Discussion on intermediate data storage for inter-calibration activities Prepared by S. Wagner.
Second GSICS Users’Workshop:
VIS/NIR sub-group discussion
Infrared Sub-Group Report Tim Hewison
Lunar Calibration Workshop Activities
Lunar Calibration Workshop Status of the preparation
Towards a GSICS DCC product...
Presentation transcript:

Extract from Hot summary of the Fourth GSICS Users Workshop Fred Wu, Sebastien Wagner, Jerome Lafeuille Sopot, Poland, 4 September 2012

Users Request (1) Need for correction for solar bands The question of whether to supply calibration correction, or recalibrated archives will be addressed on a case-by-case basis. Access to intermediate data: will be considered as potential future product, to be analyzed with beta users. Need to validate the uncertainty estimation methodology with climate community. Need for common reference channel: we will consider recommending methodology for user to use such common reference channels.

Requests (2) Need to move the products to “operational” stage AVHRR IR channel cross-calibration Increased interaction with user community (incl. climate) Continue on-going development of products and services –Instruments : IASI-B, CrIS,.. –Instrument event log (coordinated specifications) –Online tools

Discussion on the future Vision (1) Scope: shall GSICS address other measurements (e.g. active, GPS RO)? Support access to pre-launch calibration data –Should precise the type of information needed Shall GSICS provide a variety of calibration information in addition to one official « GSICS » calibration ? –Hosting 3rd party calibration information if compliant with certain « maturity » requirements (e.g. proper documented)

Increased effort on uncertainty evaluation and documentation Further promote concept of on-orbit absolute reference payload (CLARREO, TRUTHS,…) Implement the calibration correction in the L1.5 data header when possible –Ensure future data formats allow inclusion of alternative calibration coefficients Discussion on the future Vision (2)