Special Issue of Journal Theme & Topics Journal & Editors Timeline.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Bellwork If you roll a die, what is the probability that you roll a 2 or an odd number? P(2 or odd) 2. Is this an example of mutually exclusive, overlapping,
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
GSICS Executive Committee – WMO Geneva – June CNES Activities in the Framework of GSICS Patrice Henry, Denis Blumstein, Denis Jouglet - CNES.
10 th GSICS EXP Meeting, June , Geneva NOAA GPRC Report to the GSICS 10 th EXP 6-8 June 2011, Geneva, Switzerland.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
ABC Technology Project
© S Haughton more than 3?
VOORBLAD.
15. Oktober Oktober Oktober 2012.
GRWG Report Tim Hewison 1 November Outline Status Updates – For Information only –GEO-LEO IR –GEO Solar –Lunar –Archive Re-Calibration Products.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Special Issue of Journal Theme & Topics Journal & Editors Timeline.
Combining Multiple References GSICS Web Meeting
Brief Update on Product Developments (GRWG) Jo Schmetz 1 on behalf of Tim Hewison 1 and all GSICS Research Working Group (1)EUMETSAT.
2011 GSICS Users' Workshop Tim Hewison 1 (1) EUMETSAT.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Fourth Quarter Oklahoma Data (October-December 2011)
Weekly Attendance by Class w/e 6 th September 2013.
CpSc 3220 Designing a Database
SADE Export Web Site Claire Tinel, Denis Blumstein, Patrice Henry - CNES Pascale Lafitte - CNES GSICS WG Meeting – Feb 2010 – Claire Tinel / CNES.
Manik Bali, Aleksandar Jelenak
Representing GSICS in other fora: CEOS WGCV & X-CAL
Fangfang Yu and Xiangqian Wu
Spectral Band Adjustment Factor (SBAF) Tool
Updates on GSICS Operation Plan
Introduction of the SCIAMACHY SBAF web tool
Using the Moon for Sensor Calibration Inter- comparisons
Agency Report Geoscience Australia
A Strategy for the Inter-Calibration of Solar Channels within GSICS
Williamsburg, Virginia
Update on GSICS Product Development
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 01 January 2019 Report of GRWG: Aims of meeting Review of Actions Proposal.
GSICS Web Meeting Tim Hewison
Presentation transcript:

Special Issue of Journal Theme & Topics Journal & Editors Timeline

Slide: 2 10 October 2014 Special Issue Tentative Title: – Inter-calibration of Satellite Instruments Proposed Guest Editors: – Gyanesh Chander (USGS) & Tim Hewison (EUMETSAT)

Slide: 3 10 October 2014 Choice of Journal 1.IEEE Transactions on Geoscience and Remote Sensing – Highly rated journal – Focuses on instrument design and calibration – Page charges could be problematic (for >6 pages) – Ed: Chris Ruf (GSICS Rep in GPM X-Cal) 2.Remote Sensing of the Environment – Rated 1 st in Remote Sensing – Ed: Marvin Bauer (UM), and Assoc Ed: P.J. Minnett (GRRHST) 3.Canadian Journal of Remote Sensing – Guest Ed: G. Chander (GSICS & IVOS member) – Page charges could be problematic

Slide: 4 10 October 2014 Tentative Timeline Proposed Schedule (Tentative Dates) #TopicDate 1Proposal submission to Editor-in-ChiefJune 1, Deadline for submission of manuscriptsDecember 18, Peer review complete (by GSICS + IVOS + IEEE)March 17, Author revisions completeMay 16, More review and revision if necessaryJune 15, Final manuscript submission to the pressJune 30, Page proofs to authorsSeptember 28, Page proofs returnedOctober 13, PublicationNovember 27, 2012

Slide: 5 10 October 2014 Partial List of Invited Papers Partial List of Invited Papers (Provisional Topics) #Working TitleCandidate Authors 1Overview/Introductory paper Hewison (EUMETSAT), Chander (SGT/USGS) 2 Deep Convective CloudsDoelling (LRC) et al. 3Liquid Water Cloud MethodSohn (SNU) et al. 4Desert and Bright Land SurfacesHenry (CNES) et al. 5Rayleigh Scattering MethodHenry (CNES) et al. 6Sun Glint MethodHeidinger (NOAA) et al. 7Moon MethodStone (USGS) et al. 8Star MethodWu (NOAA) et al. 9Ray-Matching MethodDoelling (NASA) et al. 10Pseudo-Invariant Sites (CNES SADE Database)Henry (CNES) et al. 11COVE ToolKillough (NASA) et al. 12 CEOS Comparison of Land Surface Reflectance (Tuz Golu Campaign Aug 18-24, 2009) (Tubitak/NPL) + Participants 13CEOS Land Surface Imaging (LSI) Dome C Campaign (Dec 08 – Feb 09) Cao (NOAA/NESDIS) + Participants 14Aqua MODIS sensor as a reference for inter-calibrationXiong (NASA/GSFC) et al. 15Landsat Inter-calibration Lessons LearnedHelder (SDSU) et al. 16 Landsat 7 ETM+ & Terra MODIS CEOS Reference Sites Spectral Band Adjustment Factor (SBAF) Corrections using EO-1 Hyperion and ENVISAT SCIAMACHY Chander (SGT/USGS) et al. 17GOES and AVHRR Inter-calibration Lessons LearnedWu (NOAA) et al. 18ATSR & AATSR Inter-calibrationSmith (RAL) et al. 19MERIS Inter-calibrationBouvet (ESA/ESTEC) et al.