WMO SPICE Guthega Dam (Australia) Site Configuration Update Oct 10 th, 2012 Information from Shane Bilish Prepared by Rodica Nitu.

Slides:



Advertisements
Similar presentations
ConcepTest 1 Series Resistors I
Advertisements

Unit of Measurement Day 1 9/23/2013 Day 2 9/24/2013 Day 3 9/25/2013 Day 4 9/26/2013 Day 5 9/27/2013 MeanMedianMode Max Temperature Precipitation Air.
Doc.: IEEE 802 EC-11/0025r2 Report November 2011 Jon Rosdahl, CSRSlide 1 Executive Secretary Agenda Items Nov 2011 Date: Authors:
Updated China's 5GHz Spectrum Regulation
Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
User Meeting 15 June 2005 Monthly Forecasting Frederic Vitart ECMWF, Reading, UK.
Hans Koolen NMOC/CFMU Network Operations Services
G LEN R IDGE P UBLIC S CHOOLS CONSTRUCTION PROJECT UPDATE FOREST AND LINDEN AVENUE SCHOOLS JULY 23, 2012.
Course Selection and Registration in the Trimester Homestead High School January 9-12, 2012.
Issue of NOC for setting up Retail Outlets Along NHs.
ET-ABO 1 st Session th September 2013, WMO, Geneva Commission for Instruments and Methods of Observation (CIMO) Task Team – Aircraft-based Observations.
WMO ET-ABO Work Plan & Program Development ET-ABO Approved Work Plan, Strategy & Program Development (Agenda Item 5.1.1)
WMO SPICE Bratt’s Lake (Canada) Site Configuration Update Oct 10 th, 2012 Information from Craig Smith Prepared by Rodica Nitu.
WMO SPICE Volga (Russia) Site Configuration Update Oct 10 th, 2012 Information from Arkadi Koldaev Prepared by Rodica Nitu.
WMO SPICE Haukeliseter (Norway) Site Configuration Update Oct 11 th, 2012 Information Provided by Mareile Wolff Prepared by Rodica Nitu, updated by Mareile.
WMO SPICE Sodankyla (Finland) Site Configuration Update Oct 10 th, 2012 Information from Osmo Aulamo and Timo Laine Prepared by Rodica Nitu.
WMO SPICE Marshall (USA) Site Configuration Update Oct 10 th, 2012 Information from Scott Landolt Prepared by Rodica Nitu.
40 meters Discussion on Time Interval for Calculating Rain rates For WMO Intercomparison Experiment Vigna Di Valle Precipitation testbed at Sterling, VA.
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
WMO SPICE Tapado (Chile) Site Configuration Update Oct 10 th, 2012 Information from Shelley MacDonell Prepared by Rodica Nitu.
IOC SPICE - 3 Chair Report Rodica Nitu Brussels Oct 15, 2012.
WMO SPICE: CARE (Canada) - Site Configuration Update - Oct 10, 2012 Prepared by Rodica Nitu.
WMO SPICE Hala Gąsienicowa(Poland) Site Configuration Update Oct 10 th, 2012 Information from Maciej Karzyński Prepared by Maciej Karzyński.
WMO SPICE Caribou Creek (Canada) Site Configuration Update Oct 10, 2012 Information from Craig Smith Prepared by Rodica Nitu.
WMO SPICE Weissfluhjoch Site Configuration Update Oct 10 th, 2012 Information from Yves-Alain Roulet Prepared by Rodica Nitu.
Event/ date: WB WS UWWTD & emissions, , Skopje Author: Anita Künitzer 1 West Balkan Regional workshop on Urban Waste Water Treatment Directive.
Virginia Department of Education Office of Program Administration and Accountability.
PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 1 03/03/200 0 PSB Recombination Layout Present Kickers & Septa BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10.
World Meteorological Organization Working together in weather, climate and water Snowfall Measurement Challenges WMO SPICE Solid Precipitation Intercomparison.
Series Circuits: Other examples:. Series circuits - ________________________________________ _________________________________________ Assume: 1. _____________________________________________________.
WMO Intercomparison of Instruments and methods for the Measurement of Solid Precipitation and Snow on the Ground, WMO-SPICE: Pre-SPICE Studies R. Rasmussen(1)
 Know how to measure weather.  Know the tools we use it to measure weather.
Financial Upgrade 8.8 Update. Status Fit Gap Complete Fit Gap Complete Design in Progress Design in Progress Development in Progress Development in Progress.
Network Delays, Statistical Multiplexing
WMO I NTERCOMPARISON OF I NSTRUMENTS AND M ETHODS FOR THE M EASUREMENT OF S OLID P RECIPITATION AND S NOW ON THE G ROUND (WMO SPICE) O RGANIZATION OF THE.
LWE and Checktime Demo Scott Landolt & Steve Cristanelli - NCAR October 27, 2009.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1. Sensor Classification System Canadian Version: Siting Classification Rodica Nitu.
The NOAA/FAA/NCAR Winter Precipitation Test Bed: How Well Are We Measuring Snow? t Roy Rasmussen 1, Bruce Baker 2, John Kochendorfer 2, Tilden Myers 2,
The NOAA/FAA/NCAR Winter Precipitation Test Bed: How Well Are We Measuring Snow? t Roy Rasmussen 1, Bruce Baker 2, John Kochendorfer 2, Tilden Myers 2,
CIMO Survey National Summaries of Methods and Instruments Related to Solid Precipitation Measurement at Automatic Weather Stations - Very Preliminary results.
Topic 6 Managing stage boundaries
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Plan: 1)3 meter deep and a 10 meter deep holes at the undisturbed site. We have a location picked out and Yuri and I are planning to go there this week.
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
Market Systems Release Update Modifications Committee Meeting 52 December 5 th
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
WMO CIMO Survey National Summaries of Methods and Instruments for Solid Precipitation Measurement - Preliminary results - R Nitu Meteorological Service.
WMO TECHNICAL CONFERENCE ON METEOROLOGICAL AND ENVIRONMENTAL INSTRUMENTS AND METHODS OF OBSERVATION TECO-2012 Brussels, Belgium, October 2012 ENVIRONMENTAL.
Quantifying Uncertainty and Biases in Automated Precipitation Measurements John Kochendorfer, Bruce Baker, Tilden Meyers and Mark Hall NOAA/ATDD Roy Rasmussen,
CryoNet Status Report to GCW-SG Wolfgang Schöner University of Graz, Department of Geography and Regional Research, Graz, Austria.
1 Peter Johnston, MPI New Zealand Case study: NZ/DAFF ePhyto Project.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
All The future of DC work. GEO DC workshop June Restructuring of DC and Detector Work for many reasons the DC work was not very efficient in the.
Afghanistan Area Weather and Climate Products cpc. ncep
Broken Hill Solar Plant
Exit Ticket: Weather Instruments
3rd week souvenir Task 1: In case of hosting your e-B or e-C system, what are your considerations? Explore in more detail!
Chacaltaya glacier.
Triple-GEM setup at the GIF++
Customer Overview Pack – September 2018
On the accuracy of precipitation measurements in the Arctic
UK Link Technology Refresh
Toolik 2016 Met Station Update
Change Management Committee – June 2019 Update
Customer Overview Pack – September 2018
Friends and Partners NBAA 2003
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Latest Project Mthatha Airport Temporary Terminal Building
Presentation transcript:

WMO SPICE Guthega Dam (Australia) Site Configuration Update Oct 10 th, 2012 Information from Shane Bilish Prepared by Rodica Nitu

Site Layout Under development

Data Flow and Archive

Site Commissioning Anticipated date of commissioning: 01 May 2013 Expected status on commissioning: References (where applicable): – R1: N/A – R2: N/A – R3: 2x Geonor T-200BM3, precipitation detector Instruments under test: – Provided by the host: 3x ETI NOAH II (DFIR fence, Half DFIR fence, Alter shield only) – From Instrument Providers: N/A Instruments for Ancillary Measurements: T, RH, P, wind speed and direction (3 m and 10 m); snow depth possible Expected status on Nov 15 th : Operational with existing instruments only (3x NOAH II, T, wind speed and direction) Gaps for the winter 2013: The site is expected to be fully operational (see Additional Information below)

Additional Information (in blue, provided by the Shane Bilish, Oct 01, 2012) Data archive; – Existing or planned: Existing – Frequency of data transmission site to an archive: At least weekly Have you sent data to NCAR for pre-SPICE? No – Which is the reasonable frequency of data transfer to NCAR/SPICE archive to be expected during the experiment: To be agreed – weekly may be possible Additional Information: – We are still in the process of finalising the site configuration and obtaining development approval. – In the event that approval is not received for two new instrument pedestals (for the R3 gauges), we propose to replace one existing NOAH II with a Geonor and install one new pedestal.