CONSULTATION AND THE SAFEGUARD POLICIES ECA Safeguard Training for PIUs, May 17, 2011.

Slides:



Advertisements
Similar presentations
Training and Education
Advertisements

A Guide to Localizing the Hyogo Framework for Action
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Integrating the NASP Practice Model Into Presentations: Resource Slides Referencing the NASP Practice Model in professional development presentations helps.
Tips and Resources IASC Cluster/Sector Leadership Training
11 Scaling Up World Bank Group Engagement with Civil Society: A Strategic Priorities Paper Civil Society Team EXTIA.
EURADWASTE 29 March 2004 LOCAL COMMUNITIES IN NUCLEAR WASTE MANAGEMENT THE COWAM EUROPEAN PROJECT EURADWASTE, 29 March 2004.
Transport for London Supplier Diversity Stonewall Presentation Clive Saunders Equality & Inclusion Delivery Manager Group Services.
Project Appraisal Module 5 Session 6.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Gaining Senior Leadership Support for Continuity of Operations
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Providing Effective Feedback
EMS Checklist (ISO model)
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
A Roadmap to Successful Implementation Management Plans.
Evaluating administrative and institutional capacity building
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Stakeholders and the Public
Internal Control–Integrated Framework
The Rubric Reality Cobb Keys Classroom Teacher Evaluation System.
Care and support planning Care Act Outline of content  Introduction Introduction  Production of the plan Production of the plan  Planning for.
Child Safeguarding Standards
Chapter 14 Fraud Risk Assessment.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Scoping in the EIA process Proposal Identification Screening
ENVIRONMENTAL MANAGEMENT PLAN
PPA 503 – The Public Policy Making Process
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Johnson Appavoo Operations Analyst WB Safeguards.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
Environmental Impact Assessment (EIA): Overview
BioCarbon Fund Projects and World Bank Safeguard Policies Jean-Roger Mercier September 12, 2005.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
Module 23 Environmental Safeguards Accreditation Training, January 21 – 25, 2013 Public Consultation.
Module 2 Stakeholder analysis. What’s in Module 2  Why do stakeholder analysis ?  Identifying the stakeholders  Assessing stakeholders importance and.
Review of the Operational Policies and Guidelines: key issues from a civil society perspective Sven Harmeling, Germanwatch Held.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW Meeting, April – May 2013.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Ghana Commercial Agriculture Project: Model Lease Consultancy World Bank Land and Poverty Conference March 2015.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
The International Financial Institutions and Nam Theun 2 International Stakeholder Workshops Bangkok, Tokyo, Paris, Washington, Vientiane 31 August-24.
Involuntary Resettlement 0P 4.12 Principles and Objectives WB Safeguards Training Workshop Tbilisi, May 2013.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES Public Involvement EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE.
The partnership principle and the European Code of Conduct on Partnership.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
Revised AQTF Standards for Registered Training Organisations Strengthening our commitment to quality - COAG February August 2006.
DEVELOPING THE WORK PLAN
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
PARTICIPATORY GOVERNANCE ASSESSMENT (PGA) OVERVIEW OF PILOT RESEARCH IN CROSS RIVER STATE, NIGERIA Tony Atah, UN-REDD+ Stakeholder Engagement Specialist.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
EIA approval process, Management plan and Monitoring
Stakeholder consultations
Involuntary Resettlement 0P 4.12: Planning Instruments
Consultation & Participation
Strategic Environmental Assessment (SEA)
World Bank project example
The GEF Public Involvement Policy
Presentation transcript:

CONSULTATION AND THE SAFEGUARD POLICIES ECA Safeguard Training for PIUs, May 17, 2011

Outline The rationale of consultations World Bank policies on consultations The process of consultations Key Points & Principles to keep in mind 2

Rationale of consultations To help improve project design and implementation To inform people about changes that affect them To take their views into account in the design and implementation of projects To identify adverse impacts and mechanisms to enhance project benefits To identify risks from and to a project To increase project ownership and sustainability To comply with Bank/Government policies that require consultations 3

Bank Policy: General Obligation to Consult  For all Category A and B projects..., during the EA process, the borrower consults project-affected groups and local nongovernmental organizations (NGOs) about the project's environmental aspects and takes their views into account.  OP 4.01, Environmental Assessment, para 14 4

Bank Policy: Meaningful Consultations  For meaningful consultations between the borrower and project-affected groups and local NGOs on all Category A and B projects... the borrower provides relevant material in a timely manner prior to consultation and in a form and language that are understandable and accessible to the groups being consulted.  OP 4.01, Environmental Assessment, para. 15 5

Bank Policy: Involuntary Resettlement ... the overall objectives of the Bank's policy on involuntary resettlement are the following[(a) to (c)]: (b) ……resettlement activities should be conceived and executed as sustainable development programs……Displaced persons should be meaningfully consulted and should have opportunities to participate in planning and implementing resettlement programs. OP 4.12, Involuntary Resettlement, para 2 6

The process of consultations The primary responsibility for consultations rests with the borrower – often carried out with the help of consultants Consultations can take place in the context of Bank-required processes or otherwise Importance of having a Communications strategy for the consultations Questions that need to be addressed as part of the design of consultations: Issue Stakeholder Form Location Timing Documentation& Dissemination Reflection to the project 7

What issues should be consulted on? Identification of Impacts (negative, positive, cumulative, other) Improving project design Designing measures to enhance opportunities and mitigate adverse impacts Improving Implementation, including institutional arrangements Changes during project implementation 8

Who to consult? Who represents the stakeholders? How to select them? Directly affected people (consult all affected “groups”, not a sample), including, but not limited to, those covered by the Bank’s safeguard policies Project beneficiaries Key interest groups who are known to have views on project issues Government agencies other than the main counterparts, especially those that have a role in project implementation Local CSOs In some cases, international NGOs 9

When? As soon as the design options are known Before design is finalized As part of developing mitigation measures required by safeguard policies During implementation, if design options are not specified during preparation When changes during implementation lead to identification of new impacts For complex projects, throughout project implementation If Bank gets involved late, assess consultations carried out up to that point and assess need for additional consultations 10

Where? At a location close to those who are directly affected In projects with large footprint, at different locations so that everyone directly affected by the project has an opportunity to attend If held at a distance, may need to provide transport to and from the location Special arrangements may be required for women, the elderly, handicapped etc. Location should be perceived as safe by participants Arrangements at the location should be adequate 11

How? The form of consultations depends on the profile of stakeholders Key methods of consultations are: Public hearings Household interviews Individual questionnaires Focus groups Electronic consultations Also establish mechanisms where stakeholders can register their views / suggestions / comments on an ongoing basis Special ways of consultation may be necessary for those strongly opposed to a project 12

How to make public hearings effective Explain, up front, the objective of the consultations, rules of participation and the proposed follow up Manage expectations of participants Agree on the agenda of consultations with the participants Provide advance information to key stakeholders in appropriate format Provide sufficient time for the consultations Use appropriate moderation / facilitation skills 13

How to make public hearings effective Don't allow a few stakeholders to dominate the discussion Assess the need for translation and interpretation Ensure people feel safe participating in consultations Make special efforts to ensure vulnerable and potentially reticent groups are able to express their views Conclude the meeting by reiterating how the comments and suggestions received will be processed 14

Documenting and disseminating the results Maintain good record of consultations Use audio and video to maintain record but disclose form of recording in advance Discuss the issue of attribution of comments Inform participants how they can access the record of consultations Explain to participants the next steps after the consultations Record and address any stakeholder suggestions that cannot be accommodated Report back to participants how their suggestions were addressed, including those that could not be accepted Minutes of consultation meeting are to be attached to project EIA 15

Reflecting the results of consultations in project design and implementation Take key recommendations from consultations into account in project design – key measure of the meaningfulness of consultations Include suggestions on implementation arrangements Clearly explain why some of the comments / suggestions could not be accepted 16

How to make consultations meaningful? Provide relevant information to stakeholders in advance of the meeting, in a form and manner they can understand Document the process, and key issues that emerge, thoroughly Discuss, in project documents, how the key issues raised by stakeholders during consultations have been taken into account in project design and implementation Clearly discuss the suggestions made by stakeholders that cannot be accepted 17

How to make consultations meaningful? (Cont.) Disseminate the results of the consultations with a clear explanation of how stakeholder who disagree with how consultations have been characterized can register their objections Respond to any objections raised by stakeholders on how the results of the consultations have been addressed in project design and implementation, and described in the documentation 18

Examples from Turkey 19  BOTAŞ held consultations with the local villagers around Salt Lake while designing Gas Sector Development Project  Lack of Consultations in Ikizdere Valley Project brought reputational and financial risk as construction of 8 dams were cancelled

Key Points to keep in mind  Identify stakeholders  Ensure that project information is relevant and accessible to stakeholders  Disseminate information in a timely and appropriate manner before consultation starts  Consult early and on an on-going basis  Incorporate the results of consultation in the design of the project  Provide feedback to stakeholders  Document the consultation process 20

Key principles to keep in mind Consult project affected persons and local NGOs meaningfully about the project and take their views into account For category A, consult (i) before the ToR for the Environmental Assessment are finalized, and (ii) after the draft EA report is prepared Consult stakeholders throughout implementation as necessary to address issues that affect them Provide relevant material in a timely manner prior to consultations in a form and language that are understandable and accessible to the groups being consulted 21

Key principles to keep in mind (Cont.) For projects that affect indigenous peoples, engage them in a process of free, prior and informed consultation. This should result in broad community support to the project For projects involving involuntary resettlement, the displaced people are consulted on, offered choices among, and provided technically and economically feasible resettlement alternatives Consult host communities, local authorities and NGOs 22