National Grid Local System Plan 2009 LSP Presentation Related Questions and Answers.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
Sierra Subregional Planning Group 10-year Transmission Plan
National Grid Local System Plan Needs Assessment/Potential Solutions PAC Meeting September 30, 2009.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Questions about AVR & PSS
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
Resources Marketing SERVICE CENTERS FACILITIES MASTER PLANNING INITIATIVE Bernie O’Donnell, Director Utility.
Regional Planning Group Project
1 ELECTRICAL EQUIPMENT AND SYSTEMS – OFFSHORE AND ONSHORE FACILITIES MAIN ELECTRICAL EQUIPMENTS AND SYSTEMS INSTALLED  GENERATORS: MAIN GENERATORS – 12.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
LAFA Food Distribution July 26, Introduction:
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
1 Impact of the 2004 Hurricanes Hurricane Charley Landfall on August 13 th Customers affected Poles replaced Transformers replaced Miles of wire replaced.
Preliminary Studies of the Electric Power Distribution for CLIC
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
© 2006 MIMOS Berhad. All rights reserved. MIMOS BERHAD TENDER BRIEFING ON THE APPOINTMENT OF CONSULTANT TO STUDY AND PROPOSE POWER QUALITY.
LAFA Food Distribution
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
National Integrated Power Project Update Presentation to the Presidential Power Sector Workshop on May Niger Delta Power Holding Company Limited.
National Grid Local System Plan Needs Assessment/Potential Solutions PAC Meeting September 21, 2010.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
COMPARISION OF PJM AND INDIAN GRID. PJMINDIAN GRID.
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
JEA’s Initiatives and Capital Improvements Program
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
35kV Assessment SWEDE 2007 May 10, 2007.
Pacific Power Seismic Preparedness Update
Yangon Region Rural electrification plan
Paris distribution system
Montecito Community Microgrid
California Solar Initiative RD&D PV Integrated Storage: Demonstrating Mutually Beneficial Utility-Customer Business Partnerships Deepak Aswani May 4, 2017.
Review of Distribution Network Protection
Key Biscayne Substation
Montpelier & Powder River 5-year Studies
Strategic Plan and Economic Upgrade Process
Presentation transcript:

National Grid Local System Plan 2009 LSP Presentation Related Questions and Answers

LSP Questions and Answers Question: Patricia Kelly from the Massachusetts Attorney General office requested that asset owner (by company) of each project be included in the LSP Project List. Answer: Attachment K requires the LSP Project List to be comparable to the RSP Project List. The RSP Project List contains a column for Primary Equipment Owner. We interpret this to be National Grid for the RSP Project List. We do not see any issue with listing the asset company owner of the facility associated with the project in the LSP Project List. A column that indicates Asset Owner by company will be added to future LSP Project Lists.

LSP Questions and Answers Continued Question: Patricia Kelly from the Massachusetts Attorney General office requested that estimated cost of each project be included in the LSP Project List similar to the RSP Project List. Answer: Attachment K requires the LSP Project List to be comparable to the RSP Project List. The RSP Project List does include cost estimates with accuracies that reflect the maturity of the project or Project Stage. A column that lists the cost estimate with accuracies and variances that reflect the Project Stage, similar to the RSP Project List, will be added to future LSP Project Lists.

LSP Questions and Answers Continued Question: Bruce McKinnon of CMEEC asked if the planned load transfer, associated with listed Union Loop study, from Chartley Pond Substation to the Proposed Patriot Place Substation, will alleviate the need to replace the Chartley Pond T1 transformer as shown in the 2009 LSP Project List.

LSP Questions and Answers Continued Answer: As part of the Foxboro area load addition, associated with Patriot Place, the proposed Patriot Place Substation 40 MVA,115 – 13 kV transformer will accommodate the new load and load transfers from South Wrentham Substation and Chartley Pond Substation. The proposed load transfer from Chartley Pond Substation to the proposed Patriot Place Substation in 2013 is approximately 1 MW. Presently, Chartley Pond Substation has two kV transformers. The T1 transformer has a summer emergency capability of 54.7 MVA and the T2 transformer has a summer emergency capability of 77 MVA. The 2009 summer peak load on both T1 and T2 was approximately 69.3 MVA. As such, in 2010 it is proposed that T1 be replaced with a larger transformer size to have similar summer emergency capability as T2. Furthermore, the planned distribution load transfer in 2013 is associated with area distribution feeder load management, and does not defer the need to replace transformer T1 with a larger sized transformer in 2010.