© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.

Slides:



Advertisements
Similar presentations
Water Quality in the Caddo Lake Watershed Caddo Lake Water Quality Cypress Creek Clean Rivers Program.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Circle Theorems Bingo!. Use any 9 of these numbers 105 o 240 o 55 o 14 o 65 o 50 o 90 o 45 o 60 o 40 o 110 o 155 o 15 o 74 o 120 o 12 o.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
ThemeGallery PowerTemplate
Research Methods in Politics Chapter 14 1 Research Methods in Politics 14 Understanding Inferential Statistics.
14-1 Chapter 14 Risk and Managerial (Real) Options in Capital Budgeting © Pearson Education Limited 2004 Fundamentals of Financial Management, 12/e Created.
Partitioning 2-digit numbers
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Worksheets.
101²52²1003² 98²79² Calculer sans poser dopération et sans calculatrice : 997² ² - 95²52² - 48²31² - 29²
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
6-4 Percent of a Number Do Now Multiply   15
1 1  1 =.
1  1 =.
Preview Warm Up California Standards Lesson Presentation.
5 th - Number Sense. 1. Which is the same as 13? A B. 10 × 3 C D. 1 × 3.
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Tenths and Hundredths.
How fractions, decimals and percentages work together.
Decimals 10ths and 100ths.
I can interpret intervals on partially numbered scales and record readings accurately ? 15 ? 45 ? 25 ? 37 ? 53 ? 64 Each little mark.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
Break Time Remaining 10:00.
The basics for simulations
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
Price Points With Bar Charts. Investment to Value Ratio $45,000 - $65,000 $25,000 - $45,000 Under $25,000 $90,000 - $125,000 $65,000 - $90,000 Low Price.
Look at This PowerPoint for help on you times tables
Remember that of means multiply in mathematics. of = x.
Very large numbers! BOOM! How far? miles.
Created by Mr. Lafferty Maths Dept.
$ TOTAL INCOME 100 Quick Start 4 Within 30 Days of Start Date.
Figure 1. PX Prices and Total ISO Load (May 15 - August 31, 2000) MW $/MWh.
Making Landmark or Friendly Numbers (Multiplication)
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
Example of a Decision Tree Problem: The Payoff Table
Proportions and Percents Unit rates & Proportions Unit Rate Scale Drawing and Probability Fractions Percents.
Equal or Not. Equal or Not
: 3 00.
5 minutes.
Look at these sequences. What is happening? 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 10, 20, 30, 40, 50, 60, 70, 80, 90, , 200, 300, 400, 500, 600, 700, 800,
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
a form of inspection applied to lots or batches of items before or after a process to judge conformance to predetermined standards Lesson 15 Acceptance.
Select a time to count down from the clock above
Chapter 16 Homework Day 2.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
G – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Acceptance Sampling Plans G For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
OC curve for the single sampling plan N = 3000, n=89, c= 2
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10S Acceptance Sampling.
Acceptance Sampling Plans Supplement G
© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.
Acceptance Sampling Outline Sampling Some sampling plans
© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.
Acceptance Sampling Terminology
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 10S Acceptance Sampling.
Acceptance Sampling Outline Sampling Some sampling plans
Acceptance Sampling Plans
Presentation transcript:

© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I

© 2007 Pearson Education Sequential Sampling Chart 8 8 – 7 7 – 6 6 – 5 5 – 4 4 – 3 3 – 2 2 – 1 1 – 0 0 – Reject Continue sampling Accept Cumulative sample size ||||||| Number of defectives

© 2007 Pearson Education Sequential Sampling Chart 8 8 – 7 7 – 6 6 – 5 5 – 4 4 – 3 3 – 2 2 – 1 1 – 0 0 – Reject Decision to reject Continue sampling Accept Cumulative sample size ||||||| Number of defectives

© 2007 Pearson Education Operating Characteristic Curve Ideal OC curve Probability of acceptance Proportion defective

© 2007 Pearson Education Operating Characteristic Curve Ideal OC curve Typical OC curve Probability of acceptance Proportion defective

© 2007 Pearson Education Operating Characteristic Curve  1.0  Ideal OC curve Typical OC curve AQL LTPD Probability of acceptance Proportion defective

© 2007 Pearson Education Constructing an OC Curve Example I – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance

© 2007 Pearson Education Probability Proportionof c or less defectivedefects (p)np(P a )Comments n = 60 c = – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Constructing an OC Curve Example I.1

© 2007 Pearson Education Probability Proportionof c or less defectivedefects (p)np(P a )Comments n = 60 c = – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance np Constructing an OC Curve Example I.1

© 2007 Pearson Education Probability Proportionof c or less Defectivedefects (p)np(P a )Comments 0.01 (AQL)0.6 n = 60 c = – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance np Constructing an OC Curve Example I.1

© 2007 Pearson Education Probability Proportionof c or less defectivedefects (p)np(P a )Comments 0.01 (AQL) n = 60 c = – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance np Constructing an OC Curve Example I.1

© 2007 Pearson Education Probability Proportionof c or less defectivedefects (p)np(P a )Comments 0.01 (AQL) n = 60 c = – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance np Constructing an OC Curve Example I.1

© 2007 Pearson Education Probability Proportionof c or less defectivedefects (p)np(P a )Comments 0.01 (AQL) n = 60 c = – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Constructing an OC Curve Example I.1

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Probability Proportionof c or less defectivedefects (p)np(P a )Comments 0.01 (AQL)  = – = (LTPD)  = n = 60 c = 1 Constructing an OC Curve Example I.1

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Constructing an OC Curve Example I.1

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – ||||||||||  = (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance  = Constructing an OC Curve Example I.1

© 2007 Pearson Education Drawing the OC Curve Application I.1

© 2007 Pearson Education Finding  (probability of rejecting AQL quality: p =.03 np =5.79 Pa =Pa =  = 1 –.965 = Drawing the OC Curve Application I.1 Cumulative Poisson Probabilities

© 2007 Pearson Education Finding  (probability of accepting LTPD quality: p =.08 np =15.44 Pa =Pa = 0.10  = P a = 0.10 Drawing the OC Curve Application I.1 Cumulative Poisson Probabilities

© 2007 Pearson Education Drawing the OC Curve Application I.1

© 2007 Pearson Education Drawing the OC Curve Application I.1

© 2007 Pearson Education Understanding Changes in the OC Curve (with c = 1) 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk n (p = AQL)(p = LTPD)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk n (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with c = 1)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk n (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with c = 1)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk n (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with c = 1)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk n (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with c = 1)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance n = 60, c = 1 n = 80, c = 1 n = 100, c = 1 n = 120, c = 1 Operating Characteristic Curves (with c = 1)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk c (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with n = 60)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk c (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with n = 60)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk c (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with n = 60)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk c (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with n = 60)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance Producer’sConsumer’sRisk c (p = AQL)(p = LTPD) Understanding Changes in the OC Curve (with n = 60)

© 2007 Pearson Education 1.0 – 0.9 – 0.8 – 0.7 – 0.6 – 0.5 – 0.4 – 0.3 – 0.2 – 0.1 – 0.0 – |||||||||| (AQL) (LTPD) Proportion defective (hundredths) Probability of acceptance n = 60, c = 1 n = 60, c = 2 n = 60, c = 3 n = 60, c = 4 Operating Characteristic Curves (with n = 60)

© 2007 Pearson Education Acceptance Sampling Plan Data AQL BasedLTPD Based AcceptanceExpectedSampleExpectedSample NumberDefectivesSizeDefectivesSize

© 2007 Pearson Education Average Outgoing Quality Example I – 1.2 – 0.8 – 0.4 – 0 – |||||||| |||||||| Defectives in lot (percent) Average outgoing quality (percent) ProportionProbability Defectiveof Acceptance (p)np(P a ) = ( )/ = ( )/ = ( )/ For p = 0.01:0.01(0.974)(1000 – 110)/1000 = For p = 0.02:0.02(0.819)(1000 – 110)/1000 = For p = 0.03:0.03(0.581)(1000 – 110)/1000 = For p = 0.04:0.04(0.359)(1000 – 110)/1000 = For p = 0.05:0.05(0.202)(1000 – 110)/1000 = For p = 0.06:0.06(0.105)(1000 – 110)/1000 = For p = 0.07:0.07(0.052)(1000 – 110)/1000 = For p = 0.08:0.08(0.024)(1000 – 110)/1000 = Noise King uses rectified inspection for its single-sampling plan with n = 110, c = 3, N = 1000 Estimate the probabilities of acceptance for portion defective values from 0.01 to 0.08 in steps of 0.01

© 2007 Pearson Education Average Outgoing Quality Example I – 1.2 – 0.8 – 0.4 – 0 – |||||||| |||||||| Defectives in lot (percent) Average outgoing quality (percent) ProportionProbability Defectiveof Acceptance (p)np(P a ) = ( )/ = ( )/ = ( )/

© 2007 Pearson Education 1.6 – 1.2 – 0.8 – 0.4 – 0 – |||||||| |||||||| Defectives in lot (percent) Average outgoing quality (percent) Average Outgoing Quality Example I.2

© 2007 Pearson Education AOQL 1.6 – 1.2 – 0.8 – 0.4 – 0 – |||||||| |||||||| Defectives in lot (percent) Average outgoing quality (percent) Average Outgoing Quality Example I.2

© 2007 Pearson Education AOQ Calculations Application I.2 Management has selected the following parameters:  

© 2007 Pearson Education AOQ Calculations Application I.2

© 2007 Pearson Education Solved Problem 1.0 — 0.9 — 0.8 — 0.7 — 0.6 — 0.5 — 0.4 — 0.3 — 0.2 — 0.1 — 0 — |||||||||| Proportion defective (hundredths)(p) Probability of acceptance (P a ) (AQL)(LTPD)  =  = 0.049