FarNorth Sports, Inc. Q4 Technology Report. New Technologies Update Ultra-lite Sports Apparel technology – Speedwear product for swimmers and cyclists.

Slides:



Advertisements
Similar presentations
Project/ Open Internet Project Collaboration Translation Agency.
Advertisements

EPCT Ann Bardini PCT Business Development Division.
Buffer stocks to stabilise incomes P QO D a P1P1.
Hubbard County, Minn. Classification and Compensation Study Update GREG MANGOLD| AUGUST 5, 2014.
BTEC Unit One Fitness Testing.
Company Confidential Board of Directors ABC Company VIEW AS NOTES PAGES IN ORDER TO UNDERSTAND FLOW AND CONTEXT Template prepared by U.S. Venture Partners.
INCREASED PRODUCTIVITY FOR ASSERTION-BASED VERIFICATION (ABV) INCREASED PRODUCTIVITY FOR ASSERTION-BASED VERIFICATION (ABV) DESIGNED FROM THE GROUND UP.
Analyzing & Reporting Data– TS & EOC SAEOPP Priority 1 Training PY 2010.
Extreme Sports, Inc. Technology Report. Ultra-lite Sports Apparel technology – Speedwear product for swimmers and cyclists – Design reduces drag Generation.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Manager Self Service Update August 1, MSS Release Status.
Project Goals Provide an Interactive Environment for the Alumni and their Family to Provide online: Information Dissemination and Service Provision.
Phase Difference = Phase Difference = 0.05.
Planning Product Build Product Launch OTT P. - Lic. M – F - E OTT P - Launch CIP Filings Testing Demo Launch G2i TV Product Timeline Summer Product.
Steps Of NSAP-CPSMS DBT 1.Registration of beneficiary by getting CPSMS beneficiary Id. 2.Update rejected cases from CPSMS response file. 3.Compute pension.
1 Project Update and Summary of Project Priority List (PPL) Activity RMS August 4, 2015.
WP 6 Dorota Pawlucka Progress Meeting Amersfoort,
Physical Fitness. Major Components Flexibility Agility Aerobic Endurance Muscular Endurance Muscular Strength Muscular Power Anaerobic Power.
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 A Discipline of Software Design.
What is a life cycle model? Framework under which a software product is going to be developed. – Defines the phases that the product under development.
Copyright © Open Applications Group, Inc. All rights reserved 1 © Copyright 2009 Open Applications Group Improving OAGIS with Ontology Technology.
Information Dissemination Strategy An Update Presenter: Bruce Locke.
CORE Executive Board March 31, 2010 Next CEB April 28, 2010.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
© 2003 Xilinx, Inc. All Rights Reserved For Academic Use Only Xilinx Design Flow FPGA Design Flow Workshop.
By The First Hotel Booking System. The Group Teodor Talov (Project Manager) Tyler Thomas Michael Evans Yolanda (Xiaofeng, Zhu)
FINANCIAL BID OPENING. Tender creator logs in 1. Dept user logs in with login id and password 2. Click Login.
ERCOT Financial Summary For the Month Ended September 30, 2005
The Impact of Variability on Process Performance.
Grant Agreement Documents (between Global Fund and Principal Recipient) Workshop for TB Experts Hosted by WHO Stop TB and the Global Fund December 2005.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
COLORS USED >> CITI CARDS IT © Citigroup, Inc. All Rights Reserved Maturing Project Delivery (MPD)
March 2008 USAS Release Highlights. March Release Highlights – Functional Enhancements Fund 588 reinstated ACCLOAD and APPROP Load Changes: ▫New accounts.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
ISA Editor and Viewer Date: Octobre Create a Visual Setup in ISA (In-Line Station Application) Visual Setups are used by the ISA to display the.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Ambient Networks Update Date Submitted: January 17 th 2007 Presented.
Information Technology Update ERCOT Board of Director’s Meeting October 18, 2005.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
September 21, Data Extract Projects Jackie Ashbaugh Commercial Operations Data Integrity & Administration September 21, 2006.
Information Technology Service Availability Metrics March 2008.
Project Plan and Schedule Goal: Agree on project plan and schedule.
Advanced Performance Sports, Inc. Technology Development Report.
Information Technology Update Aaron Smallwood Manager, IT Business & Customer Services.
Dept user Logs in from Home Page for Bid Opening Login with user name and password.
Presented by Kensaku Kawamoto, MD, PhD Assistant Professor of Clinical Informatics, Duke University Co-Chair, HL7 Clinical Decision Support Work Group.
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
Role of Account Management at ERCOT EIS Project Updates Jackie Ashbaugh Mgr., Commercial Operations Data Integrity & Administration DEWG October 19, 2006.
A First Course on Kinetics and Reaction Engineering
Slideshow B3: Protective sports equipment
Advanced Performance Sports, Inc.
Quicken Installation Problem Number More info :
طرق تدريس التربية الإسلامية 2
A) Define bradycardia. (1) b) Outline why the adaptations leading to bradycardia might be beneficial to trained athletes. (3)
Contents 1 Click to add Title 2 Click to add Title 3
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Children’s Hospital Update
PowerPoint Template.
ABB Life Cycle Definition
II //II // \ Others Q.
EDLC(Embedded system Development Life Cycle ).
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Release 3 Scope – Initial View
Changes to the 5 Month TCA File
FREEPPT
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Types of Errors And Error Analysis.
Contents Click to add Title Click to add Title Click to add Title
Alveolar and airway CO2 during the ventilatory cycle: flow (upper graph) and mean alveolar and airway CO2 pressure scalars (lower graph). Alveolar and.
Presentation transcript:

FarNorth Sports, Inc. Q4 Technology Report

New Technologies Update Ultra-lite Sports Apparel technology – Speedwear product for swimmers and cyclists – Design reduces drag Generation II Snowboard – Flexi-design snowboard – Technical composition (classified)

Ultra-lite Sports Apparel Technology progress – Chemical testing completed (P1) – Initial error summaries available for review – Endurance testing under way (F2)

Ultra-lite Status Testing Production Model Standards Verification G2 Report 6 weeks2 weeksWithin next 30 days Completed and filed

Generation II Snowboard Technology progress – Testing phase (P3) in progres Binding tests A-1 through A-4 completed Board tests A-1 and A-2 in progress Latch release redesign in progress – Product market review in progress 30 day reports due at end of month – Development review cycle in progress

Snowboard Projected Comps

Questions Development Testing Marketing