All content in this presentation is protected – © 2012 Pelco Digital Sentry - Updated.

Slides:



Advertisements
Similar presentations
EdCube Connect: Collaborative e-Portfolios Discovery-based Software Publisher
Advertisements

Collaborative e-Portfolios
Yokogawa Network Solutions Presents:
Sales Collaboration Platform
Welcome to WebCRD.
ISIS Upgrade Project ISIS Faculty Self Service Your Sneak Peek Faculty Senate, November 2, 2009.
Technical Support Update & OpenEdge Roadmap
Update on PBS October 24, 2005 V3. 2 Expansion of Participant Browser Services (PBS) Background on PBS Rollout Status Customer feedback DTCC listened.
ECATS RCCA CAMP PROCESS ENHANCEMENTS
May 2009 D2L Upgrade to Version 8.4 Desire2Learn Changes in Version 8.4.
Timetracker Midterm Update Senior Project II Sarah Mercier.
WHAT IS ANDROID? A Software platform and operating system for mobile. Based on the Linux kernel. Android was found way back in It was developed.
Zinio Library Patron Setup Step-By-Step September 2012.
What’s New in Fireware XTM v11.9.1
Student Getting Started Guide *Updated December 2011 to include information on Integrated Digital Book/MindTap Reader.
Products being integrated to create Home Base OpenClass Collaboration Schoolnet Instructional Tools and Assessment PowerSchool Student Information Core.
What’s New in WatchGuard Dimension v1.2
XProtect ® Express Integration made easy. With support for up to 48 cameras, XProtect Express is easy and affordable IP video surveillance software with.
What’s new in WebSpace Changes and improvements with Xythos 7.2 Effective June 24,
GEN2 Touch: Version GEN3: Version
Looking Ahead Archive-It Partner Meeting November 18, 2014.
DNR-322L & DNR-326.
Looking Ahead Archive-It Partner Meeting November 12, 2013.
Use the Right arrow on your keyboard to advance to the next slide. Use the Left arrow to move to the previous slide. Press the “ ” in the upper right corner.
WIN-202 System QCEW Technical Conference Philadelphia, PA June 16, 2005.
Bullseye Bullseye was rolled out to our user base on Friday, January 30. I wanted to take this opportunity to give everyone an update on a.
PC Application
1 of 6 Parts of Your Notebook Below is a graphic overview of the different parts of a OneNote 2007 notebook. Microsoft ® OneNote ® 2007 notebooks are digital.
EDMS User Group Meeting 1/15/2015 Room 425 ITD Building.
Tech Data’s 2010 Physical Security Playbook Enablement for Networking Resellers.
All content in this presentation is protected – © 2010 Pelco Pelco Video Management Solutions Experience the Power of Choice.
© 2007 ReadyTalk www.readytalk.com1598 Wynkoop, Denver, CO 80202www.readytalk.com Welcome to ReadyTalk Training.
Danielle Baldwin, ITS Web Services CMS Administrator Application Overview and Joomla 1.5 RC 1 Highlights.
New Features Update for 2008 Sep. Release Synology2008/07/21.
Classroom User Training June 29, 2005 Presented by:
June 18, Agenda Welcome Updates and Reminders New CT.gov Site eGovernment Applications Questions & Comments.
OCLC Online Computer Library Center CONTENTdm ® Digital Collection Management Software Ron Gardner, OCLC Digital Services Consultant ICOLC Meeting April.
Your personal Display Section Presence notes Display Picture & ‘Indicator’ Contacts Activity Feeds Conversations Phone Options Your Location Your Presence.
Home Media Network Hard Drive Training for Update to 2.0 By Erik Collett Revised for Firmware Update.
MainConsole V3.4.0 New Feature. What is New on V3.4 New Windows OS support New Windows OS support Window 7 32bit/64bit Window 7 32bit/64bit Server 2008.
Goals for Shared ILS Development √ 4.10 upgrade (2/7/12) √ (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late.
© 2012 MindTree Limited CONFIDENTIAL: For limited circulation only Slide 1 © 2012 MindTree Limited CONFIDENTIAL: For limited circulation only SecureMind.
BOLD 2.0 Navigation Help Guide Note: BOLD will be inaccessible from 9:00 pm ET on Friday, June 1, to 7:00 am ET on Monday, June 4, so that the upgrade.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
New Features v1.4. CPO New Features  Send File Link Improvements  Send File Link via mobile phone  “All Plus Share” permission  Desktop Sync (DS)
StorCenter ix4-200d Training By Erik Collett August 2009.
Obtaining MISR Data and Information Nancy Ritchey Atmospheric Science Data Center March 20, 2006.
Design Web Update Learning Services. © 2001 Synopsys, Inc. (2) CONFIDENTIAL Action Items for client Engagement & Development to be removed/retained Top.
Panopto UMKC’s New Lecture Capture Solution. A Quick Rundown…  What is lecture capture?  The state of lecture capture at UMKC  Why did UMKC choose.
ALA Annual Meeting Claire Cocco Global Product Manager CONTENTdm Users Group June 30th, 2008.
August Video Management Software ViconNet Enterprise Video Management Software Hybrid DVR Kollector Strike Kollector Force Plug & Play NVR HDExpress.
iVMS-5200 Pro V3.3.0 Introduction
What Is Firefox? __________ is a Web ___________ that you use to search for and view Web pages, save pages for use in the future, and maintain a list.
Copyright © 2012 Pearson Education, Inc. or its affiliate(s). All rights reserved
GRADS Advisory Committee Meeting 4 May 9, 2016 Lori Cottrill.
VICONNET 8.0 RELEASE Scheduled for release in June 2015 – Integration with Vicon Express NVRs and DVRs – Support Vicon Access control system – Updated.
MAXPROTM VMS Overview.
Proctor Caching and System Check September 4, 2014 Becky Hoeft Conference Number: (877) Conference Pin:
Technology Coordinator Training. Agenda Getting Started Using SystemCheck Technology Configurations Infrastructure Trial Proctor Caching Overview Managing.
Proctor Caching Overview. 2 Proctor Caching Diagram.
IP camera SD card storage LOG INTO THE CAMERA Not all cameras have SD recording capabilities. A quick way to tell is to log into the camera. If.
Patrick Desbrow, CIO & VP of Engineering October 29, 2014
Chapter 10: Web Basics.
What’s new and What’s coming Guy Arazi: Director of Products
WEBINAR Introduction to ViconNet 3.0 October 26, 2005
Data-Basics Training & Support
New Canvas Gradebook Demo
Lippincott’s Nursing Procedures and Skills
XProtect® progression over time
STAR 360 Testing Plan.
Presentation transcript:

All content in this presentation is protected – © 2012 Pelco Digital Sentry - Updated

Pelco by Schneider Electric– Name – Date Agenda: ●What’s New DS NVs 7.4 ●Update on Pelco Mobile ●Tools Updates ●2012 for DS

Pelco by Schneider Electric– Name – Date DS NVs 7.4.xx ●Second of 3 planned builds for 2012 ● January ●7.4.xxx - Late June/early July ●Fall release - TBD ●Expected availability 7.4 = Late June/early July ●Will be available first from Pelco FTP site ● ●Available early August from Pelco.com, DS NVs page ●

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – DX Interoperability ●Connectivity ●CP allows fifth person to log into a DX8100 ●Imported CP cache file now includes DX systems ●Camera Control ●Camera PTZ from DX45/46/47/48 no longer stops after 2-3 seconds ●Playback ●Resolved one second delay on playback with DX8100 ●Quick Review now shows all cameras in playback ●CP can playback recorded video from DX4800 v2. ●UI ●Dragging a DX45/46 system in CP now populates all layouts ●Live video time stamps are now synched when connecting to DX45/46

Pelco by Schneider Electric– Name – Date

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – Settings Improvements Control Point Settings

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – Settings Improvements

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – Settings Improvements

Pelco by Schneider Electric– Name – Date DS NVs Thumbnail

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – Enhanced Thumbnail

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – Enhanced Thumbnail

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – PTZ/Preset Improvements

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – PTZ/Preset Improvements

Pelco by Schneider Electric– Name – Date DS NVs 7.4 – Additional Features ●Ability to see fast forward/rewind speed on playback in ControlPoint ●Ability to sort ONVIF cameras in Quick Setup Wizard ●ControlPoint version shows on the banner ●Added support for Arktan Panoramic camera

Pelco by Schneider Electric– Name – Date Pelco Mobile – How are we doing? ●Over 1,334 downloads since May 18 th release ●Still hold 5.0 rating – add your comments! ●Top 10 countries ●US ●Mexico ●UK ●Turkey ●Canada ●Brazil ●Italy ●France ●Sweden ●China

Pelco by Schneider Electric– Name – Date Pelco Mobile – How to access

Pelco by Schneider Electric– Name – Date Pelco Mobile – How to access

Pelco by Schneider Electric– Name – Date Pelco Mobile – How to access

Pelco by Schneider Electric– Name – Date Pelco Mobile – v1.1 Enhancements ●Tablet optimization ●UI objects take advantage of tablet real estate ●Multi-camera view added to tablets ●1x1, 2x2, 3 x 3 ●My Camera List ●direct Sarix connection is limited to 9 cameras ●Direct camera PTZ removed ●Android back button implemented

Pelco by Schneider Electric– Name – Date Pelco Mobile – v1.1 Enhancements ●SM5200 ●iOS is firm for this release; Android support not yet confirmed for 1.1 ●“Aggregation” available from My Systems List ●Limited to 5 systems (any combo of DS and Endura) ●Each system limited to first 500 cameras each, total of 2,500 max ●Camera Groups/Locations ●Groups – DS & Endura. System-wide groups must be set up in DS Admin ●Locations – Endura only ●Expected release – end July/early August

Pelco by Schneider Electric– Name – Date

Pelco by Schneider Electric– Name – Date

Pelco by Schneider Electric– Name – Date Tools Updates ●Web Site Changes ●New navigationwww.pelco.com Mega menus Video tabs

Pelco by Schneider Electric– Name – Date Tools Updates ●Collateral ●VMS Brochure – Lit # _US ●DS Brochure – Lit # _US ●Spec sheet revisions in progress ●Updated Digital Sentry PPT – Sales Extranet ●Training ●Updated DS online class June 20th new Jun-Oct schedule available Friday 6/15 ●Virtual class being piloted tested this month, expected availability August Four ½ day sessions

Pelco by Schneider Electric– Name – Date Tools Updates ●Calculator ●All Pelco Sarix models added to the drop down for correct display of IPS and resolution selections ●Corrected IPS and resolution options for ENC5416 (NTSC and PAL) ●Added bit rate calculation when choosing camera quantity ●Unified calculator – project to be launched mid-summer 2012

Pelco by Schneider Electric– Name – Date

Pelco by Schneider Electric– Name – Date 2012 Plan for DS ●Mapping Status ●Hardware ●Integrated RAID/ENC Host cards ●Software ●Pelco API – July ●Licensing, Late Q4/early Q ●Pelco Mobile ●Late July/early August release ●September – Version 1.2 Search/playback

Pelco by Schneider Electric– Name – Date ?s