1 FL EDI R3 Test Requirements Rule 69L-56.320, F.A.C.

Slides:



Advertisements
Similar presentations
Division of Workers Compensation E.D.I. Rule 69L-56 Linda Yon, EDI Coordinator Phone:
Advertisements

1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
My AmeriCorps AmeriCorps National Programs Member Recruitment Presentation developed for the Corporation for National and Community Service by the eGrants.
Slide 1 FastFacts Feature Presentation April 12, 2011 We are using audio during this session, so please dial in to our conference line… Phone number:
NANPA Oversight Working Group Status Report to the NANC November 27, 2001 Chair Pat Caldwell.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
1 Community Right to Know Electronic Reporting Bruce Boyd Tina Gutierrez & Latoshia Parker Office of Pollution Prevention and Right to Know.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Michigan Electronic Grants System Plus
1 Solicitations/Advertisements Solicitations/Advertisements
0 - 0.
1 ICOTS What weve learned since October 6, GETTING STARTED.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
Plan My Care Brokerage Training Working in partnership with Improvement and Efficiency South East.
Plan My Care Training Care Management Working in partnership with Improvement and Efficiency South East.
ZMQS ZMQS
1 SLIDE Insurance Company Regulation Division Insurance Market Regulation Division Medical Professional Liability Insurance Claim Reports Online Claim.
Payment & Remittance Processes
Report Card P Only 4 files are exported in SAMS, but there are at least 7 tables could be exported in WebSAMS. Report Card P contains 4 functions: Extract,
6/2/ Online Group Enrollment. 6/2/ Introduction Thank you for choosing Online Enrollment! This presentation will walk you through the Online.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
Text 1 July, 2010 DCMS: Training Manual Campaign Management.
Information Systems Today: Managing in the Digital World
March 27, 2014 How to get started RMA Portal MOTOROLA SOLUTIONS 1.
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
ABC Technology Project
“The Honeywell Web-based Corrective Action Solution”
“The Honeywell Web-based Corrective Action Solution”
1 1Line Training Capacity Release - Phase II Awards and Recall/Reput.
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
Slide #1 of 39 / {ESC} Return to Main Menu / F1 Help PCS - Parish Computer System The NEXT Generation of Parish Software Archdiocese of Los Angeles PCS.
VOORBLAD.
Evaluation Orientation Meeting Teacher Evaluation System
Florida Internet Claims Filing System Power Point Presentation.
Squares and Square Root WALK. Solve each problem REVIEW:
Annual Enrollment for Plan Year February APRIL 2010 Topics to Discuss What’s New for Plan Year 2011? Annual Enrollment Communications Information.
Welcome to the Virtual Historian Getting started with the VH 2.0 Go to virtualhistorian.ca Select language of usevirtualhistorian.ca 2 Note: For.
© 2012 National Heart Foundation of Australia. Slide 2.
Welcome to Instructions and tips for the online application process 1 June 2012.
Chapter 5 Test Review Sections 5-1 through 5-4.
1 POP QUIZ: What MTC is used to retract an EDI DWC-1 filed in error with DWC?
Claims EDI R3 Data Warehouse Featured Functionality
GEtServices Services Training For Suppliers Requests/Proposals.
Addition 1’s to 20.
Brief introduction to Secondary Care SOAR users Last updated: 13 th December 2012.
25 seconds left…...
GaBreeze Employer Website PSR Implementation and April Release Enhancements Flexible Benefits Training for Georgia Benefits Professionals April 2011.
 Departmental Administrative Specialist should verify that the vendor is not an existing vendor using XK03 in IRIS.  All NEW vendors must complete the.
Week 1.
Travel 1: Travel Authorization. Welcome to Training! Why PeopleSoft? – PeopleSoft will help UTEP to grow. What’s Your Part? – We need your skills and.
Useful Tips  How to quickly verify if you are logged on or not  Get the full navigation menu window for e- application  What is a time-out and how to.
To the Assignments – Work in Progress Online Training Course
We will resume in: 25 Minutes.
PSSA Preparation.
How Cells Obtain Energy from Food
Page 1 of 30 This process involves authorizing a company to act on behalf of the designated representative for a Crown petroleum and natural gas licence.
Using the Import Accounting Line Feature You may enter accounting lines one by one in KFS or may enter multiple accounts at once using the Import Accounting.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
12-CRS-0106 REVISED 8 FEB 2013 PRESENTS Payment Functionality.
NYS Workers’ Compensation System Compliance Outreach: Measuring and Monitoring Payor Performance Questions /14/2015 & 7/16/2015.
1 Claims EDI R3 Data Warehouse Featured Functionality.
Presentation transcript:

1 FL EDI R3 Test Requirements Rule 69L , F.A.C.

2 FL R3 Test Requirements  Rule 69L , F.A.C., addresses the requirements the Claim Administrator must meet to move from Test to Production status.

3  However, the Primary and Secondary Implementation Schedules addressed in the current rule are no longer applicable; Therefore, new Trading partners must test all MTC’s. Therefore, new Trading partners must test all MTC’s. FL R3 Test Requirements

4  During the testing period, all DWC Forms required by Rule 69L-3, F.A.C. must continue to be mailed to the Division. FL R3 Test Requirements

5  Claim Admin. must achieve acceptance (TA) for the minimum number of filings for each category of EDI filings specified in the FL Claims EDI R3 ‘Test Process’ document (on website) prior to being considered for production status. FL R3 Test Requirements

6  Claim Admin. will not be authorized to move to production status at different times for separate categories of required test EDI filings (e.g., EDI DWC-1’s, EDI DWC-13’s, etc.). All specified MTC’s/Filing Types must be approved before Claim Admin can ‘go live’ with R3. All specified MTC’s/Filing Types must be approved before Claim Admin can ‘go live’ with R3. FL R3 Test Requirements

7  In addition to testing the specified MTC’s/Filing Types, the Trading Partner must also respond to and resolve several different types of TA-FL Reconciliation Errors in the Data Warehouse before requesting authorization for production status. FL R3 Test Requirements

8  R3 test files should report the electronic equivalent of the DWC-1 (paper or R1), DWC-12, DWC-13 and DWC-4 being sent to the Division for actual claims. FL R3 Test Requirements

9 Note: When testing R3 filings for the Electronic First Report of Injury or Illness using actual claims, the trading partner should use cases that were received and processed by DWC after 3/31/2010. All claims/DWC-1’s (paper or R1) entered prior to 3/31/10 have been copied to our test database. FL R3 Test Requirements

10  Use real JCN’s from JCN list when sending standalone test SROI filings for actual claims where the DWC-1 (paper or R1) was established in DWC claims system on or before 3/31/10. Do not use Production JCN’s if the claim was established AFTER 3/31/10. FL R3 Test Requirements

11  Use the test JCN returned for the test 00/IP (or other EDI DWC-1 equivalent) when sending “standalone” test SROI filings (e.g., SA) See test filing categories c – f in Test Process document on web). See test filing categories c – f in Test Process document on web). FL R3 Test Requirements

12  If you are a new Claim Admin. and are unable to test with actual claims, “mock” electronic filings may instead be created and sent for testing purposes. FL R3 Test Requirements

13  Mock filings must still contain valid data and must not be identical to IAIABC or Florida Business Scenarios. FL R3 Test Requirements

14  If you send mock test data, you need to be confident of the quality of your live production data. There is only a 30 day grace period for FROI late filing penalties after going ‘live’, and There is only a 30 day grace period for FROI late filing penalties after going ‘live’, and Going back to “testing” status is not an option. Going back to “testing” status is not an option.

15  If you change Match Data (e.g., SSN, DOI) for an actual claim, you must not send the JCN provided for that claim on your JCN Listing. New FROI’s (e.g., 00/IP) will not have a JCN. New FROI’s (e.g., 00/IP) will not have a JCN.

16  Note: Only one JCN Listing will be produced after you file your Trading Partner paperwork. JCN Lists can be generated upon request. JCN Lists can be generated upon request. Send to for revised JCN List.Send to for revised JCN List.

17 Seeking Production Approval  When you think you have satisfied all testing requirements, send an to and request ‘production approval’. Production approval process is described in the ‘Test Process’ document on the Claims EDI Webpage (and following slides.) Production approval process is described in the ‘Test Process’ document on the Claims EDI Webpage (and following slides.)

18 Seeking Production Approval  To determine the status of your testing, from the Test Warehouse Main Menu, click on ‘Report Cards & Statistical Reports’; then select ‘Generate Claims EDI Report Card’ to yield counts and %’s for each category of EDI filings.

19 Seeking Production Approval  If it appears testing requirements for all categories have been met, to request production approval.

20 Seeking Production Approval  Note: Filings that are assigned ‘TA-FL’ will count as accepted transactions, but will appear in a separate column in the Report Card. They should be added to the ‘TA’ counts when determining if testing requirements have been achieved. They should be added to the ‘TA’ counts when determining if testing requirements have been achieved.

21 Seeking Production Approval  Although the “FL Claims EDI R3 Test Process” document indicates each category must be evaluated on the basis of one transmission / Division Rec’d Date, you may also request credit for filings submitted over time via multiple transmissions/ Div Received Dates. …

22 Questions?

23 After you get back to the office, ALL Questions, either Business or Technical, should be sent via to This address is copied to all members of the EDI team. It is the quickest and most efficient way for us to respond to your concerns.

24 Please complete your Training Feedback forms.