1 Stratus Technologies Andy Bailey Underlying technologies and reducing the risk Stratus Technologies Andy Bailey.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Repaso: Unidad 1 Lección 2
Symantec 2010 Windows 7 Migration Global Results.
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
Automation and Motion IEC Control Marketing, , 1 Safety Integrated® Topics for today.
AP STUDY SESSION 2.
1
Distributed Systems Architectures
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt RhymesMapsMathInsects.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
1. PHOTO INDEX Bayside: Page 5-7 Other Colour Leon: Page 8-10 Cabrera Page Canaria Page Driftwood Page 16 Florence Florence and Corfu Page.
© Tally Solutions Pvt. Ltd. All Rights Reserved Shoper 9 License Management December 09.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
Operating Systems Operating Systems - Winter 2010 Chapter 3 – Input/Output Vrije Universiteit Amsterdam.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1 Section 5.5 Dividing Polynomials Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

1 Stratus Technologies Andy Bailey Underlying technologies and reducing the risk Stratus Technologies Andy Bailey

2 The Smarter Approach to Uptime Andy Bailey Stratus The Smarter Approach to Uptime Andy Bailey In todays world, there is an expectation that systems are always available. Every application is mission essential.

3 The Smarter Approach to Uptime Andy Bailey Stratus The Smarter Approach to Uptime Andy Bailey Putting a perspective on the cost of downtime….. Industry SegmentNormal Cost of DowntimePeak Cost of Downtime Discrete Manufacturing49,000247,000 Process Manufacturing19,800762,000 Banking828,0002,698,000 Telco192,000499,000 Average Per Hour272,2001,051,500 Source: HP analysis of 158 companies across EMEA, Summer 2005

4 Risk Factors associated with Virtualisation

5 Underlying technologies and reducing the risk

6 The host becomes a single point of failure. Virtual servers

7 Stratus approach is to prevent any failure conditions…….. Primary environment

8 …..rather than recovering from failures DR environment

9 The Smarter Approach to Uptime Andy Bailey Stratus The Smarter Approach to Uptime Andy Bailey Technology to de- risk aggressive virtualization deployments Always or Continuously available Simple to operate and maintain uses commercially available operating systems everything is hotplug Uncompromising TCO Acquisition Management Downtime

10 The Smarter Approach to Uptime Andy Bailey Stratus The Smarter Approach to Uptime Andy Bailey At Stratus, Availability is the primary focus of everything we do!

11 The Company

12 HQ – Boston, MA

13 Stratus Customers

14 Constantly changing data is needed in real-time to make decisions

15 The server is a direct interface between a business and its customers

16 Availability of the application is a direct contributor to revenue

17 Single transaction is of enormous value or critical importance

18 Technology

19 FULL REDUNDANCY - All components are duplicated

20 Processors run in Lockstep Fault Detection & Isolation Embedded I/O PCIDisksCPUChipset Memory Fault Detection & Isolation Fault Detection & Isolation Embedded I/O PCIDisksCPUChipset Memory Fault Detection & Isolation Lockstepped CPUs

21 Multi-path I/O capability Fault Detection & Isolation Embedded I/O PCIDisksCPUChipset Memory Fault Detection & Isolation Fault Detection & Isolation Embedded I/O PCIDisksCPUChipset Memory Fault Detection & Isolation Multi-path I/O

22 Self-checking logic detects and isolates errors to the component level and notifies Stratus of problems If hard error occurs, faulty component is taken out of service; duplicate component continues normal processing – ZERO LATENCY

23 What happens to the data?

24 Disks run in Full Duplex mode

25 Memory is mirrored and synchronised

26 Network ports are duplicated and teamed

27 OS and S/W reliability

28 OS Support & Failsafe software Red Hat® Linux® OS

29 S/W versions W2003 Enterprise Edition W2003 Standard on entry-level

30 OS Support & Failsafe software Red Hat® Linux® OS

31 S/W versions Red Hat® Enterprise Linux® AS kernel W2003 Standard Edition W2003 Enterprise Edition W2003 Enterprise Edition R2

32 Stratus Failsafe software

33 Reliably distinguishes software issues from hardware issues to speed problem resolution – TRANSIENT ERROR PROTECTION

34 Driver hardening ensures uninterrupted processing if an I/O interface fails

35 Rapid disk resynchronization transparently mirrors disks and protects data integrity

36 Active Upgrade Technology Addresses major causes of planned downtime

37 What is Active Upgrade? S SD D 1. Duplex 2. Split 3. Merge & Commit S SD D S SD D RDR-Mirrored System Disks & Data disks Application Keeps Running Patch/Hot-fix Gets Applied Re-mirror from Latest System & Latest Data Disks Outside World Outside World Outside World Outside World Outside World Outside World Enet, EMC, etc System Disks Data Disks

38 ROOT-CAUSE ANALYSIS Accurate error data capture to prevent problem recurrence

39 Service Methodology

40 24hr Customer Assistance Centre

41 Component fails. System ISOLATES fault and notifies Stratus that a CPU has failed

42 System automatically orders CORRECT replacement part Next Day Delivery Service

43 Hot-pluggable components are EASY to replace Next Day Delivery Service

44 System synchronizes with replacement component Next Day Delivery Service

45 Worldwide Services

46 Stratus is the first and only vendor to report daily the reliability of its installed base of systems worldwide.

47 Unmatched Operational Simplicity Compelling Financial Advantage Continuously Available Solutions Stratus, in conjunction with offer a unique virtualisation proposition…