FP420 Low and high voltage supply Henning E. Larsen, INFN Dec. 2006. rev.2.

Slides:



Advertisements
Similar presentations
X-rays and image production
Advertisements

Artrelle Fragher & Robert walker. 1 you look for the median 1 you look for the median 2 then you look for the min and max 2 then you look for the min.
第十一章 心 悸 《急诊医学》.
Partitioning 2-digit numbers
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
IV Jornadas Futuros Aceleradores Lineales Madrid 2-3 Diciembre09.
Ozone Level ppb (parts per billion)
Principles & Applications Small-Signal Amplifiers
Partial Products for Multiplication
Semiconductor detectors
Answer these on your whiteboards:
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
1 Liverpool Production Status Week of 9 February 2007.
Independent consultant Available for consulting In-house workshops Cost-Based Optimizer Performance By Design Performance Troubleshooting Oracle ACE Director.
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
Alice LV PS Workshop June 26, 2001 Salvatore De Pasquale INFN Bologna 1 Status of the TOF Low Voltage System Salvatore de Pasquale INFN Bologna.
IMP CALCULATION Here is how the IMP board score is calculated In the BridgeHit system we use the averaged cross-imp scoring technique. Steps of using this.
10-Nov-2005US ATLAS Tracking Upgrade Santa Cruz 1.
CT Scanning: Dosimetry and Artefacts
High Voltage Supply. High voltage Supplies Generators should provide a smooth constant high voltage to the X-ray tube.
Electrical and thermal testing at Glasgow and Liverpool.
We can multiply bigger numbers using an algorithm!
Proportions and Percents Unit rates & Proportions Unit Rate Scale Drawing and Probability Fractions Percents.
Making Numbers Two-digit numbers Three-digit numbers Click on the HOME button to return to this page at any time.
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Doubling and Halving. CATEGORY 1 Doubling and Halving with basic facts.
Report on INFN activities CHIPIX65 - project
Multiplying By Multiples of 10 © 2012 Elizabeth Hill.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
The ATLAS Pixel Detector
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 Proposal on Monitoring depletion voltage (V dep ) of the SCT sensors T. Kondo (KEK) R. Tanaka (Okayama) K. Hanagaki (Osaka) D R A F T.
Vertex 2002, Kailua-Kona Tobias Stockmanns, Universität Bonn1 Serial Powering of Pixel Modules T. Stockmanns, P. Fischer, O. Runolfsson and N.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
1 Module and stave interconnect Rev. sept. 29/08.
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
FP420 Tracker and Timing detector Low and high voltage supply INFN/Univ. of Torino Cern meeting, Jan
FP420 Low and high voltage supply INFN/Univ. of Torino Sep
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.
Sensor Choice The story here is surely damage – See that silicon worked well in the PLT test until we shifted the timing to optimize diamond Reducing BX.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
FP420 Low and high voltage supply Henning E. Larsen, INFN Feb
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Low Voltage Power Supplies: towards design specifications Henryk Palka, IFJ PAN Krakow (for WP team: Krakow, Prague, KEK) DEPFET-Belle Meeting Karlsruhe,
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
FP420 Low and High voltage supply
TT Upgrade Power Review
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
Development electronics SIPM-MU2e
Henning E. Larsen, INFN 12 July 2006
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
EVLA MONITOR & CONTROL CDR
Sensor probing (Summary)
Operational Experience with the ATLAS Pixel Detector at the LHC
Production Status 39 modules produced
SVT detector electronics
Presentation transcript:

FP420 Low and high voltage supply Henning E. Larsen, INFN Dec rev.2

Revision information Since I made the slides, the frontend has gone from 6 to 4 detectors/superlayer. I have as far as possible tried to take this fact into account in this revised version.

HV-LV supply segmentation Damage depends on distance from the beam. Required bias voltage and current increase with radiation dose. Drawing: From Ray Thompson PT1000 Temperature sensor? Pixels:50x400um and 400x50um MCC: Module Controller Chip 1 Superlayer = 2 Hybrids/Blades 4 2D detectors 1 MCC 1 Read-out interface Now only 2 det.

Specification for LV for 1 superlayer PixChips/4VoltageCurrentCurrent limit Analog V Nom 2V 5-70mA100mA Digital V Nom 2V 1% occupancy: 40-50mA 10% occupancy: 60-70mA 100mA MCC/1VoltageCurrentCurrent limit Digital V120mA-150mA170mA Ripple at 1MHz is critical. Remote on/off. Monitor current. Digital supply for Pixelchip and MCC is common as seen from supply. 4 PixChips + 1 MCC + Read-out? VoltageCurrentCurrent limit Analog V20-280mA310mA Digital V1% occ 280mA-350mA 10% occ 360mA-430mA 480mA Monitor resolution<20mV<10mA DEC 2006:Notice change from 6 to 4 detectors per superlayer

Specification for HV supply 4 detectors 2 voltages VoltageCurrentCurrent limit V 0-120V(*) <1mA1mA Monitor Resolution <1V1μA Voltage is negative, but floating. Referenced to AVDD on PIXELCHIP, not GND HV connection diagram used in Atlas Source: Maurice Garcia-Sciveres DEC 2006: Notice change from 6 to 4 detectors per superlayer (*) -120V is also sufficient.

One of 4 stations Counting inventory: Super layers: 2 experiments * 2 zones * 5 pockets * 5 superlayers=100 super layers LV supplies: 100 super layers * 2 voltages = 200 channels HV supplies: 100 super layers *2 voltages = 200 channels Crate count is preliminary

Overall system geography

Commercial: Wiener solution A 2x4 Mpod-like systems (8U,19” each) will be arranged to provide the requested voltages over 500 m distance, Located in the counting rooms and will host both HV and LV modules. 2 cable pipes with 10 cm section (or probably less) are needed. The Mpod will require custom -150V modules.. 4*2 Mpods with 80ch each. Location: Counting room Mpod x 8 150k€ for Mpod’s 100k€ for cables Now only 2 HV

Commercial: Wiener solution B 2x10 Maraton-like radiation tolerant systems (3U) will provide LV and operate close to the detectors. 2x2 Mpod-like devices will supply HV from the counting rooms. This solution requires a customization of Maraton in order to optimize it for low currents. The Mpod will require custom -150V modules. Cost not yet discussed. One per pocket Mpod x 2 x 5 One per pocket One per crystat 1 Maraton Now only 2 HV

Commercial: Wiener solution C 2x22 Maraton-like system will provide HV and LV and operate close to the detectors. Simple cable These systems will be optimized for the given current range. Need customization for -150V modules Proven radition tolerance: 722Gy, n/cm 2 Cost not yet discussed 1 Maraton 2.2 crates per pocket H=3U=131mm 1 Maraton 2.2 crates per pocket x 11 Now only 2 HV

CMS/Atlas counting room Commercial: Caen SY1527 A1676A Crate Ctl A1676A Crate Ctl A3486 2x48V Power A3486 2x48V Power Atlas or CMS Slow control EASY 3000 A ch LV A ch LV A ch LV A ch LV A ch LV EASY 3000 A ch HV A ch HV A ch HV A ch HV A ch HV A ch HV A ch HV FP420 pocket FP420 pocket FP420 pocket FP420 pocket FP420 pocket LHC Tunnel EASY 3000 A ch LV A ch LV A ch LV A ch LV A ch LV EASY 3000 A ch HV A ch HV A ch HV A ch HV A ch HV A ch HV A ch HV FP420 pocket FP420 pocket FP420 pocket FP420 pocket FP420 pocket Cryostat 1Cryostat 2

Commercial: Caen, pictures SY1527 EASY 3000 Not to scale A3009 A3501

Commercial: Caen A3009 LV A3501 HV A3009 LV A3501 HV A V Power Modules 220k€ Cable ~20k€ Delivery not possible before summer 2008 due to LHC production bottle neck. Only few samples by mid CAN bus link has to be extended to 500m. This is not yet tested High voltage only up to 120V Cable: 500m

Commercial: Eplax GmbH Entirely custom design based on their >20year experience with standard power supplies and our specification No experience with radiation tolerant supplies. Non recurring engineering cost: 25k€ Supply for 1 superlayer: 900€ Total cost: 115k€ (excl cables)

LV supply: simulation model with long lines Current transients are mainly limited by capacity at the load. Simulation shows a 500m+500m cable with 20% current change for C=1µ, 5µ, 50µF Conclusion: 500m++ of LV cables is not feasible

Simulation, Low voltage, 500m cable

LV supply using LHC4913 If we make our own custom solution a regulator like LHC4913 is very convenient and unique. It is now being ported to a military/space qualification => higher cost, but presumably available. 1.Rad hard. 2.Extensively used at LHC detectors. 3.Remote sense on the positive and negative supply. This means it can compensate for resistive cable voltage drop. This means that with LHC4913, a thinner cable can be used. 4.Adjustable current limit. 5.ON/off switch input.

ADC’s: DCUF Detector Control Unit (CMS) CMS central tracker for the monitoring of some embedded parameters like supply voltage and currents on the front-end read-out modules Is available in the quantity we need

HV principle diagram + V bias - Cable V in αI bias αV bias I bias Transformer +rectifier R3R3 R2R2 R1R1 R1R1 R2R2 Pass transistor DAC Simple linear regulator to make radiation tolerance easier to implement with COTS Monitor, remote control, galvanic isaolated Galvanic isolation ADC’s

“Home made” in-tunnel-solution cost estimate Modules 120k€ Cable 20k€

Location for service electronics Until today we thought: If the LV electronics should stay within some 20m from the detectors, there are only two possible locations (ref Daniela Macina): –Below the new cryostat, where the radiation level is estimated at about 700 Gy per year of running at full luminosity; –Below or near the adjacent magnets, where the radiation is much lower and estimated at about 15 Gy per year, but where there are already other things. Space for service electronics. Few meters of cable Radiation level? Shielding possibility? Space for electronics needing close proximity to detectors At mechanics meeting 29/9/06 we saw: FP420 detectors

Issues to finalize Location of support electronics in tunnel. Favour of putting it under the adjacent magnets. Cable length about 10m. Radiation level to expect. There ought to be simulations done with shielded cryostat at fp420 to evaluate the dose. Current assumption is 15GY/y Home made or commercial solution? Cable distances from fp420 to the counting room for all 4 stations have to be estimated more precisely than the current 500m Specification of number of channels Specification of LV supply for superlayer readout part (Opto board). Need for temperature monitor of FE for the cooling system. Where should it be serviced? If in the HV-LV unit, we need define a local interface with cooling as this cant go through slow control. Are there any requirement for: –Hardware interlocks related to temperature? –Graceful power down =UPS backup?

Conclusions Some interesting solutions from industry. Some almost off the shelf. We have an outline of how to build the LV-HV our selves but chip supply is critical. We need to make up our minds if we buy or build ourselves. We are opting for putting the LV/HV crates under the adjacent magnets