McDonald’s Vertical Toaster. View inside cabinet Relays Drive Train Motor with fan in place. Plate heater.

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

BMW 1985 – 325e Timing Belt and Water Pump Replacement
Modern Automotive Technology PowerPoint for by Russell Krick
Suspension Systems - 1 Topics covered in this presentation:
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Rework Procedure for Wash Motor Pulley Change Model : Rosa & Rosa Plus Part Details & Tools required Sr NoPart DescriptionQtyTool used to replace old artworks.
1640 Pivot Drive Value Engineering 22 November, 2010.
Important aspects to improve conveyor performance
MyLock 644D Service Seminar.
Leg Assembly A step-by step guide to the disassembly and service of a HUBO leg.
Engine Removal and Disassembly
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Kit includes: New Sprocket New Upper Bracket New Stickers New Ground Wires Toaster Speed Conversion Kit.
Retrofitting Vertical Toasters Six kits are available for retrofitting the Vertical Toaster. A properly serviced toaster should have installed:
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
Chains And Sprockets. Sprockets The sprocket looks like a gear but differs in four important ways: l Sprockets have many engaging teeth; gears usually.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
V-belt drive V-belt is mostly used in factories and workshops where a great amount of power is to be transmitted from one pulley to another when the two.
L2000 Technical Training 6. Assemble/Disassemble.
Choose Your Motor Type (Click The Appropriate Picture) S-CanSlimline- FF050 Topic Jump.
0 Beach Cities Robotics FRC Team 294 Summer Academy Motors and Gears July 20, 2008 Rick Wagner, Mentor, Beach Cities Robotics FIRST Team 294.
How to Disassemble and M16 By: Anthony Johnson. Parts List Left and right hand guards Upper and Lower Receiver Charging Handle Bolt Carrier Retaining.
POWER TRANSMISSION SYSTEMS.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
DOUBLE V-GUIDED BELT CONVEYORS. CENTER DRIVE CONFIGURATIONS ALLOW FOR SMALL DIAMETER END PULLEYS FOR TIGHT TRANSITIONS WHILE STILL ACCOMMODATING LONGER.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
RO400FC Forced convection hot air reflow oven. In a flexible production, what do you need for soldering of  Complex PCB’s  Soldering of fine pitch on.
Unit 4: Mechanical Systems. Topic 2: The Wheel and Axle, Gears, and Pulleys.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
Perry Lapper Progress. Frame With Actuators Outside Frame.
Remove the seats from the car, there is no easy way to do this. Flip it up side down so it looks like [1] Both sides are done exactly the same, so.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Power Transmission Devices
Designing Robots How to make a stable robot! Much of the information in this power point is from Winning Design! By James J. Trobaugh.
Building LEGO Robots For FIRST LEGO League By Dean Hystad
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
Beginning Chassis Build Season. Parts List Structure 2x20 Beam (2) 2x16 Beam (4) 2x10 Beam (2) Large Chassis Connector (20) 1x1 Connector Pin.
RoverBot Assembly The following pages show assembly plans for the RoverBot using the Consumer MindStorms or School Team Challenge Lego kit. Assemble the.
Power transmission.
INTRODUCTION About 13 people die every hour due to automobile accidents in India. About 36% of these accidents are due to negligence in lifting the side.
Concept Review - P08001 Balance Training Bicycle Team Members Jennifer Zelasko - IE Carl Mangelsdorf - ME Jeff Tempest - ME James Nardo - ME Jon Bawas.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
PostBase Automatic Feeder Component Removal Service Training
Important aspects to improve conveyor performance
SuperQuest Salem Arms – Best Practices.
8/30/2004 RoverBot Assembly The following pages show assembly plans for the RoverBot using the Consumer MindStorms or School Team Challenge Lego kit. Assemble.
Care and Maintenance of Super Clamps
Unit 4 Mechanical Systems
This is a front view of the impeller inlet
T400 Motor Replacement.
6. Disassembly & Reassembly
Camshafts, Lifters, Timing Belts, and Chains
Replace fan motor MullToa 45 and 60
Pre – Trip Inspection Training
850 2½”-10”.
LF856 2½”-10”.
880V 21/2”-10”.
Step 1:Disassemble battery case
856 2½”-10”.
Robotics Belts, Chains, Sprockets and Gears
New Pullet Cage System Confinement System for Laying Pullet
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Suspension Systems - 1 Topics covered in this presentation:
Automotive Engines Theory and Servicing
Presentation transcript:

McDonald’s Vertical Toaster

View inside cabinet Relays Drive Train Motor with fan in place. Plate heater

Here’s a look at the cabinetry of the toaster. The running gear is accessible from the controller side. The motor is accessed by removing the bottom of the unit.

The motor is its cavity under the heater plate.

The motor is properly positioned when its mounting bolts are pushed to the right.

The first step in disassembling the conveyor assembly is removal of the cover. Belts are next.

The platen back can then be removed.

Gain access to the platen by removing this plate.

The upper rollers, which rest on spring loaded plungers, are easily removed.

Springs in place for a short upper folder.

The axle for the rear roller must be removed from the controller side of the toaster.

With the axle removed, the rear roller lifts out.

The lower rollers drive the conveyor belts, pulling buns through the toaster.

The platen can be displaced enough to all new springs to be put in place.

Here’s a look at the drive train with the vertical support in the cabinet removed.

Chain alignment is critical in the toaster.

Chain tension is also very important. The chain shouldn’t be too tight.

Improper chain tension can lead to odd wear patterns on sprockets. The sprocket at right shows deep valleys between teeth and a sawtooth-like curvature. The sprocket on left is new.

Later toasters have a bushing brace to prevent bushings from being cut.

The latest toasters also have a crumb barrier at the top of the cabinet.

Vertical Toaster Wiring Schematic