Salah Jebara Al Bu Falah Abu Dhabi June 2010 Oil and Gas Forum Debate Presenter: Salah J. Al Bufalah 1.

Slides:



Advertisements
Similar presentations
Raising Entrepreneurial Capital
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
1st PMI AGC Energy Forum: DMS Debates :
Construction Project Coordination Presented by: Philip H
OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
FINANCIAL MANAGEMENT I AND II
1 Appendix 4: Financial Risk Management: (Inflation) Overview: To develop an understanding of the ways in which financial risk from inflation can be minimized.
NEC - Engineering and Construction Contract (ECC)
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
P ROJECT O WNERS SHOULD INCREASINGLY ADOPT THE C OST P LUS MODEL OVER LSTK P OSITION : A GAINST THE M OTION Kuwait City, Kuwait - 12 th June 2011 PMI AGC.
Make your contracts work for you The efficiency of properly managing contracts with purchasers and suppliers Negota 10 June 2014ADVOKATFIRMAET NEGOTA AS.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
VII-Financing of Constructed Facilities The Financing Problem Institutional Arrangement for Facility Financing Avaluation of Alternative Financing Plans.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
Contractors & contracts
0 Equipment Leasing. 1 Options to Acquire Equipment Cash LoanLease Client owns equipment Appeals to cash-rich firms Not viable for small, new entities.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
Construction Work Packaging
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
WARRANTED HOT MIX ASPHALT PAVEMENTS: Development, Benefits and Risks.
Technical Manager; Bechtel Oil, Gas & Chemicals.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Chapter 21 – Lease Analysis -- Terms u Lessee u The person using the asset u Lessor. u The person who owns the asset.
Dr. James Kallman, ARM 5-1 Advanced PowerPoint Presentation ©2009 The National Underwriter Company.
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
1st PMI AGC Energy Forum: DMS & PMI Debates Abu Dhabi, UAE 2nd June Wael H. Al-Jasem (MBA, PMP, MSP Register Practitioner) EPCs on Bonus Incentive.
How To Structure a P3.
TYPES OF CONTRACTS.
Advise | Design | Integrate | Deliver Subcontractor fee structure – FND Phase 1 Manchester 8 th June 2009.
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
Group Quiz: Rules: 1: Raise hand to answer question (I will select fastest team). 1: 1 mark for a correct answer. 2: -1 mark for an incorrect answer. 3:
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Final Jeopardy Government And the Economy Good Investing $ and Employment Trade Economics Around the World Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q.
Managing Your Energy Portfolio In A Greener World January 18 &19, 2007.
Contractor Alternate Design Serving the Public’s Best Interest.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
© Shepherd and Wedderburn LLP Oil & Gas v Offshore Renewables: Regulatory Framework & Contractual Landscape Lynne Scott 26 January 2015.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Alternative Risk Financing Vehicles. Began development in 2010 Launched first captive in 2011 Current Active Captive Portfolio ‒ Legacy health – Heterogeneous.
Chapter 2 Preparing for Management. I. Owner Benefits INCOME CASH FLOW is the cash left over after cash expenses. It is money that any owner can spend.
Managing Technical & Project Risks on Small Renewable Energy Projects (>$20 million) Uwe Roeper, M.Sc. P.Eng. President, ORTECH Consulting Green Energy.
Construction Work Packaging
Project Execution in Process Industry
SPECIALTIES OF LEGAL AND CONTRACT WORK IN EPC/EPC(m)-PROJECTS
2017 Education Series – NCHCA/CEO/City of Ottawa February 24, 2017
NHCA Education Series Contractor Pre-Qualification CSST
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
PROJECT MANAGEMENT 2 Chu Eu Ho
PRE-PROPOSAL MEETING, January 16, 2018 Contract No.:
CHANGING PROJECT DELIVERY SYSTEMS
Knowledge Organiser Effective Financial Management
Dennis Li - HKCIC Lecturer
Definitions EPC EPCM Design/Build Contract Lump Sum
Value Engineering In Design
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Chapter 2 – Review ‘construction management’
Delivering Successful Outcomes
Honoraria for Design Build Projects Methodology Assessment Matrix
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Salah Jebara Al Bu Falah Abu Dhabi June 2010 Oil and Gas Forum Debate Presenter: Salah J. Al Bufalah 1

 EPC and EPCM contracting are both very prevalent types of contracts within the construction industry. Dependent on the level of risk the Owner of a project is willing to accept, budget constraints, and the Owner’s organization core competencies, will determine which method is best for their project.  EPC contracting tends to be slightly more expensive, to the Owner, due to the shift of project risk away from the Owner and to the EPC Contractor. This however was not evident in the latest EPC tenders we have seen. Presenter: Salah J. Al Bufalah 2

 EPCM Advantages:  Lower Overall Cost  Staff’s Sense of Ownership  More Control over Process  Better for less defined projects with anticipated changes to scope of supply  Less Legal Litigation (Identify issues early and remedy situation before larger problems arise)  Owner’s Financing Flexibility Presenter: Salah J. Al Bufalah 3

 EPC Advantages:  One Stop Shopping “One point of Contact”  “Hands off” approach to project  Minimal Staffing Requirements  Minimal Legal Risk  Best for Well defined projects with Engineering Complete before EPC Contractor selected (Minimal Unknowns). Presenter: Salah J. Al Bufalah 4

 EPC has a lot more predictability of outcome  Owner is more disciplined with changes (Changes require Higher level approval and therefore needs to be really justified)  Owner maintain small organization that can be retained after project completion without major changes to the organization.  Warranties has one focal point with the EPC contractor. Presenter: Salah J. Al Bufalah 5

What do we do to make EPC more attractive; Presenter: Salah J. Al Bufalah 6

 Well defined FEED, Unrushed Reimbursable FEED to insure completion.  Balanced Terms and Conditions. Liabilities, LD’s, Bonds, etc…  Compensation for FEED Verification Report  Realistic Schedule, with reasonable period for Bid preparation.  Comprehensive Vendor List. Presenter: Salah J. Al Bufalah 7

 Sharing some of the risks and rewards, Multi- Currency Bid, Commodities Indexing, Exchange Rates fluctuation, etc..  Cost and Schedule improvement incentives.  More balanced and neutral payment terms.  Detailed Change Management Mechanism.  And the list goes on, However we are not debating how to improve EPC T&Cs but this can be a topic for next year’s Debate. Presenter: Salah J. Al Bufalah 8