Pollutant Valuation Cost Containment Calculation of Damaged Assets Eddie Leung Secured Environment.

Slides:



Advertisements
Similar presentations
Lesson 4 Minimizing Health Implications. For additional information or questions please contact Toledo-Lucas County Health Department APC:
Advertisements

Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings.
Federal Energy and Environmental Regulation Agencies and Laws
Environmental Impairment (Pollution) Insurance
Constellation Energy “The Way Energy Works” PWR Tritium Issues G. C. Jones.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
1 RADIOACTIVE WASTE MANAGEMENT (PART 1) A RAHMAN RWE NUKEM Ltd (UK)
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
SS6G9 The student will discuss environmental issues in Europe
SS6G9 The student will discuss environmental issues in Europe
Environmental Engineering
Nuclear Energy Targets: Explain how the nuclear fuel cycle relates to the true cost of nuclear energy and the disposal of nuclear waste. Describe the issues.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
Nuclear energy at a crossroads. Benefits Reactors generate electricity without adding to global warming/air pollution. Small amt. of U gives off large.
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
Federal Energy and Environmental Regulation Agencies and Laws
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Nuclear Fact Sheet Matthew Pigott EGRS 352 Professor Nicodemus Process: Nuclear energy results from the splitting of uranium atoms in a process called.
Shore Reception Facilities
Solid Waste Laws. Federal Legislation RCRA (1976)- The Resource Conservation and Recovery Act) CERCLA (1980) –The Comprehensive Environmental Response,
Nuclear Energy Chapter 12. Nuclear Fuel Cycle Uranium mines and mills U-235 enrichment Fabrication of fuel assemblies Nuclear power plant Uranium tailings.
Nuclear Energy. The Nearest Nuclear Power Plant DTE Fermi II is just about 40 miles from us.
Jeopardy $100 Land + SeaTrash/MinesPollutionWater Miscellaneous $200 $300 $400 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100.
Bioremediation By: Austin Anderson Materials Science 3344 Fall 2006.
Economic Instruments Session Objectives: Identify economic instruments for specific environmental issues Identify constraints on application of economic.
V ERMONT Y ANKEE E MERGENCY R ESPONSE D URING SAFSTOR AND DECON P RESENTATION TO THE N UCLEAR D ECOMMISSIONING C ITIZENS A DVISORY P ANEL Bill Irwin, Sc.D.,
Air Resources Board Research Division Economic Valuation of Air Quality Benefits Bart Croes, Chief Research Division.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 18 Environmental Law.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
CBRN Terrorism Mitigation: One Science for Global Cooperation Scenario CBRN Post-Attack 100 Days: Recovery, Risk and Communication Prof. F. STEINHÄUSLER,
Fukushima Power Plant – Japan Post March 11, 2011
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
K. Margrethe K. Tingstad, President WILPF Norway Vice president WILPF International CLIMATE CHANGE, ENVIRONMENT & MILITARISM November «Introduction.
Air Pollution. Types of Air Pollution Primary Primary air pollution is released directly into the atmosphere Secondary Secondary air pollution is not.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Nuclear Power Plant How A Nuclear Reactor Works.
ECLAC HANDBOOK FOR ESTIMATING THE IMPACT OF DISASTERS1 Estimating damage to soil.. When damages are associated to pollution, inundation or drought.
Crisis ◦ Situation with potential to generate disaster or catastrophe, endangering the survival of the system.
SS6G9 The student will discuss environmental issues in Europe a. Explain the major concerns of Europeans regarding the issues such as acid rain in Germany,
Environmental Justice The “Not In My Backyard” problem and how to solve it.
South Framingham Initiative MassDEP’s Project to Improve Environmental Quality in an Environmental Justice Neighborhood 2015.
ENVIRONMENTAL CHEMISTRY DEPARTMENT OF CHEMISTRY OPEN COURSE DEPARTMENT OF CHEMISTRY OPEN COURSE ENVIRONMENTAL CHEMISTRY.
EM530 – Unit 3 February 19, 2012 Welcome!!. Administrative Issues? Do you have any items that need to be clarified/explained?
OPRC Level 3 Spill Response Strategies Limitations and Issues.
Coal-Fired Plant Coal is conveyed to boiler In primary water loop, water is boiled into steam Steam is sent through turbine Turbine spins the generator,
Global Warming – The Broad Legal Reach of Initiatives to Reduce Carbon Emissions Worldwide Legal Issues Associated with Carbon Capture and Geologic Storage.
FIN 47 and Environmental Remediation Liabilities C. Gregory Rogers, J.D., CPA Advanced Environmental Dimensions Brownfields 2006 – Boston – November 14,
HAZWOPER stands for Hazardous Waste Operations and Emergency Response. It’s a set of standards developed by OSHA that provides guidelines to protect workers.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
© Cengage Learning 2015 LIVING IN THE ENVIRONMENT, 18e G. TYLER MILLER SCOTT E. SPOOLMAN © Cengage Learning 2015 Nonrenewable Energy-Nuclear Energy.
1.5 Nature of pollution. Pollution is The addition to an environment of a substance or an agent (such as heat) by human activity faster than it can be.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
SS6G9 I can discuss environmental issues in Europe
SS6G9 The student will discuss environmental issues in Europe
NAME__________________________________DATE_________________________________HR_____________ A nuclear disaster is ________________________________________________________.
Chapter 17 Environmental Laws and Pollution Control.
European Environmental Issues
Goods and services account
Environmental Awareness
What about NUCLEAR ENERGY?
Noteworthy points of environmental remediation work in Fukushima
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
SS6G9 The student will discuss environmental issues in Europe
Japanese Nuclear Accident And U.S. Response
SS6G9 The student will discuss environmental issues in Europe
Presentation transcript:

Pollutant Valuation Cost Containment Calculation of Damaged Assets Eddie Leung Secured Environment

Successful & Sustainable Adoption of New Technology Law/Government Must Have Enforcement of IP Rights Must Have Social Support Science/ Technology Must Be Viable Business/ Financial Must Be Cost-Effective

Why Is It … That so many disasters end up costing so much more than initially anticipated?? That salvage values end up being so much less than initially anticipated??

Answer Most disasters end up being significantly more costly than initially anticipated, in part, because ex ante (before the fact) analyses fail to include all costs that end up being counted ex post (after the fact). That is, most analyses fail to include all short term AND long term, private AND social costs.

Every Action Involving Pollutants Entails Trade-Offs

Private vs. Social Costs of Responding to Pollutant

Value of Damaged Inventory Salvage Value (e.g., after earthquake damage) = V(Recovered Goods) – C(Recovery) Where C(Recovery) include all (i) short-term and long-term, (ii) private and social costs associated with recovery

Value of Polluted Inventory Value of Damaged or Polluted Goods = V(Recovered Goods) – C(Recovery) – C(Decontamination) Where C(*) include all (i) short-term and long-term, (ii) private and social costs associated with, respectively, recovery and decontamination (e.g., cleanup, process, disposal, liability, compliance, compensation, etc.)

Specific Example: Total Costs of Emergency Coolant Private and Social Short-Term and Long-Term Total Costs associated with Coolant = Cost of Coolant + Cost of Delivery + Cost of Fire Fighting Operation + Cost of Radioactive Air Emission Abatement + Cost of Radioactive Soil Pollutant Decontamination + Cost of Radioactive Water Effluent Processing + Cost of Facility Clean Up + Cost of Facility Decommissioning + Cost of Long Term Monitoring + Cost of Compensation + Cost of Business Interruption + …

ExplosionFire Loss of Control Loss of Coolant Replace Coolant Loss of Power Back up Power Recovery Remediation Evacuation Compensatio n Relocation Temporary Storage Logistics Processing Release Temporary Storage Logistics Processing Disposal Water Soil $/TBq Atmosphere Air $/km² Contaminated $/km³ Contaminated $/m³ coolant

Pathway Spent Fuel Coolant 1.Primary pollutant (radioactivity) contained inside spent fuel pool, no release 2. A loss circulation or coolant will lead to release of radioactivity 3. Added make-up coolant (cost of coolant) will become contaminated with primary pollutant 4. All coolant outside of containment is a release and will required treatment

Total Costs of Nuclear Power Generation: Planned vs. Un-Planned Emergencies