Introduction and Welcome

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Variations of the Turing Machine
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Myra Shields Training Manager Introduction to OvidSP.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
1 Hyades Command Routing Message flow and data translation.
David Burdett May 11, 2004 Package Binding for WS CDL.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
PUBLIC KEY CRYPTOSYSTEMS Symmetric Cryptosystems 6/05/2014 | pag. 2.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
© Telcordia Technologies 2004 – All Rights Reserved AETG Web Service Advanced Features AETG is a service mark of Telcordia Technologies. Telcordia Technologies.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
TESOL International Convention Presentation- ESL Instruction: Developing Your Skills to Become a Master Conductor by Beth Clifton Crumpler by.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
 Copyright I/O International, 2013 Visit us at: A Feature Within from Item Class User Friendly Maintenance  Copyright.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 10 Routing Fundamentals and Subnets.
Adding Up In Chunks.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 2 Networking Fundamentals.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
1 EBC Evolution Refresher 27 th May 2005 BT Wholesale 1, City Place, Gatwick.
Syndicate A - Issues Geographic nos: –DLERange changes re:parenting & DLE closures DTS, some DTM Solution: correct grid reference and Audit overrides Invoice.
: 3 00.
5 minutes.
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 12 View Design and Integration.
Essential Cell Biology
Clock will move after 1 minute
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 9 TCP/IP Protocol Suite and IP Addressing.
PSSA Preparation.
Essential Cell Biology
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
RefWorks: The Basics October 12, What is RefWorks? A personal bibliographic software manager –Manages citations –Creates bibliogaphies Accessible.
1 EBC Workshop Introduction and Welcome.
1 EBC Conference Introduction and Welcome.
Presentation transcript:

Introduction and Welcome EBC Workshop Introduction and Welcome

Objectives of the day Report progress since the November workshop Understand the EBC Solution Understand progress on other issues raised Outline BT’s plans Next steps

Agenda 10.00 Arrive & Coffee 10.30 Welcome 10.35 EBC Solution - Routing Plan Database 11.20 EBC Solution - New Files 12.05 Break 12.20 EBC Solution & NTS 12.50 EBC related activities 13.30 Summary & Close 13.45 Lunch

EBC Solution – Routing Plan Database EBC Workshop EBC Solution – Routing Plan Database

EBC Solution – Changes to Routing Plans The Contract Prov Manual “Forms” required for the exchange of information Appendix 24 shows the Routing Plans

EBC Solution – What we do now with Routing Plans Routing of traffic to the POC Agreed with the TAM Data Management Amendment

EBC Solution – Routing Plan manual activities Not everyone is skilled in using spreadsheets A consistent format is not always used Human errors Incorrect information Ambiguous Dates are not shown

EBC Solution – What do we need ? We need a system with…… A uniform presentation and feel Ease of use Accessibility Validation of information DMA dates

EBC Solution – Routing Plan Database (RPD) System

EBC Solution – Routing Plan Database (RPD) System Benefits Improved production and change control Storage on a centralised date-stamped database Replace spreadsheets for Ingress Routing Plans Web-based interface Opportunity to track changes Provide agreed Exit POC information to the EBC system

EBC Solution - Routing Plan Database (RPD) System - Interfaces Intranet Operator TAM Fault Reception Read-Only Routing Plans DMA Reception BT Wholesale Portal Network Implementation Data Validation

EBC Solution - Routing Plan Database (RPD) System – Stages Initiated Rework Submitted Data Validation Agreed Raised Implemented

EBC Solution - Routing Plan Database (RPD) System – Data entry Look & Feel of the data entry will be similar to that of the existing spread sheets Drop down lists will be provided to simplify choices Validation will be provided where appropriate On-line help will be provided

EBC Solution - Routing Plan Database (RPD) System – Features Routing Plan changes will be tracked Routing Plan information will be provided to BT Fault Reception to aid network problem investigation Automatic notification will be provided to the Operator and the TAM at key stage

EBC Solution - Routing Plan Database (RPD) System – Change Change in the current Routing Plan process You will have to change how you submit Routing Plans BT will have to change how we process the Routing Plans Getting your Routing Plan requirements implemented on the BT network will be much improved Using the DMA date stamps will improve the alignment of charging dates for EBC

EBC Solution – New Files EBC Workshop EBC Solution – New Files

EBC Solution – Routing Plans Routing Plans and EBC Operator issues from previous workshops Ingress Points of Connection Direct Feed from Routing Plans Database System Relationship with BT PSTN Design Visibility for Operators Dates

EBC Solution – Operators’ Perspective Alignment of agreed Routing Plans and EBC charges Charges that are more predictable Closer alignment of EBC and NIPP Clarity of how Number Ranges and Switches map to charges Operators optimise routing with BT based on EBC

EBC Solution – System Relationships

EBC Solution – System Relationships Routing Plans (Agreed with Operator)

EBC Solution – System Relationships Network Design (Policy) EBC Routing Plans (Agreed with Operator)

EBC Solution – System Relationships NIPP (Current) EBC Network Design (Policy) Routing Plans (Agreed with Operator)

EBC Solution - BT PSTN Structure Main Tandem Switch Types Other Services & Platforms Main Tandem Connectivity DSSC DMSU Stand alone 999 DMSU IN DISCs 192 ASU NGS Retained DMSU NGS (Hybrid or Big Bang Narrowband) Phased Unit NGS DMSU NGS (Hybrid or Full Connectivity Narrowband) Main Tandem DMSU DMSU DMSU Not all connections or services are shown in this diagram. Switching Layer Local Switching Layer inc Local Tandem Switches DLTE DLE Conc UXD5 WAT or DJSU DLE DLE Conc Conc

EBC Solution - Network Description & NIPP BT’s Network Description provides: High Level description, including outline planned changes Operators access and download BT’s network description from: http://www.btwholesale.com/interconnect2bt/network_information/network_description NIPP provides Greater detail of planned changes including detailed data files Details of traffic types that can be exchanged at different types of POI Registered users can access NIPP at http://www.btwholesale.com/index.jsp

EBC Solution– Two New Files Existing files will continue BT Wholesale will publish two additional files: A file showing switch to switch to EBC charge bands Used for planning where to connect Little variation between matrix builds A file showing EBC Charge Bands against valid number blocks Used for planning where to pass traffic Non-Retarded Number Ranges

File 1 – Planning Where to Connect to BT From switch NNI, to switch NNI, EBC Charge Band Only valid combinations shown Contractually valid call routing Transit or Non-Transit

File 1 – Planning Connect to BT – Trunk Ipswich Morganite (NGS) 4073327,0973102,521 4073327,0974001,523 4073327,0974016,523 4073327,0984001,524 … 4073327,1311001,529 4073327,1311618,529 4073327,1712241,525 4073327,1715359,525 4073327,1772355,521 4073327,4012629,529 4073327,4014559,529 4073327,4015916,529 4073327,5710060,525 4073327,5973090,521 4073327,5975073,523 4073327,5982049,524 All SYSX DLEs and DLTEs All (non-paired) DMSUs All ASUs All NGSs All AXE10 DLEs and DLTEs

File 1 – Planning Connect to BT – DLE Ipswich Unit B (DLE) Itself … 0973004,0973004,520 0973004,1311001,525 0973004,1311618,524 0973004,1374017,521 0973004,1472250,521 0973004,4012629,525 0973004,4014559,525 0973004,4015916,525 0973004,4073327,521 0973004,4075179,521 All (unpaired) DMSUs Directly connected WATs All NGSs

File 2 – Optimising Traffic Delivery to BT NNI, number block, EBC Charge Band Valid combinations only How do you use this file? Match number block Find CB and NNI combination appropriate Valid for the existing EBC matrix

File 2 – Planning Traffic Delivery – DLE 0973004,0120671,520 0973004,01206760,520 0973004,01206761,520 … 0973004,01394380,520 0973004,01394385,520 0973004,01394389,520 0973004,01394600,520 0973004,01473106,520 0973004,0147321,520 0973004,0147322,520 0973004,01473230,520 0973004,01473231,520 0973004,01473232,520 0973004,0172845,520 0973004,0172860,520 0973004,01728633,520 0973004,01787220,520 0973004,01787221,520 0973004,01787222,520 Ipswich Unit B (DLE) Unretarded BT number ranges hosted on DLE

File 2 – Planning Delivery – Trunk Ipswich Morganite (NGS) Numbers on DLE 0973102 4073327,014732830,521 4073327,014736162,521 … 4073327,01603212,523 4073327,01603213,523 4073327,016032140,523 4073327,016032141,523 4073327,016032142,523 4073327,0195345,523 4073327,0195342,523 4073327,0164223,524 4073327,0164224,524 4073327,01642256,524 4073327,0164226,524 4073327,01642621,524 4073327,0113212,529 4073327,0149166,528 Numbers on DLE 0974001 Numbers on DLE 0974016 Numbers on DLE 0984001 Numbers on Other Networks

EBC Solution – EBC Modifications Summary Routing Plans These show agreed routing arrangements DMAs These effectively tell BT to put Routing Plans into effect Dates These are needed for any system that is going to feed into billing EBC will be modified to use the dates built into Routing Plans and DMAs from Summer 2004

EBC Workshop EBC Solution & NTS

EBC Evolution and NTS: INCA/CLI proposal BT’s proposal (included in the response to the Oftel NTS con doc) for per- call EBC charging of NTS traffic is based on EBC evolution principles: exit POCs used for charging will be identified from the routing plans.

NTS: using EBC Evolution Two new “planning” files   RPD to identify exit POCs Planning files used to determine where to collect NTS traffic at least cost, update routing plans Two new NTS charging files  

INCA/CLI NTS and EBC Evolution, detail This presentation deals solely with identification of EBC charge bands OLO-BT-OLO Transit, representation as currently, change to method of identifying exit POC. EBC charge band is cheapest connectivity path from entry POC to the agreed exit POC identified in the routing plans for that entry POC and the destination number range

INCA/CLI NTS: BT-OLO traffic Two new EBC Files: Destination number, linking key Origin number, linking key, charge band The charge band represents the retention to be used when calculating the BT outpayment. If CLI in BT range, a BT-originated charge band will identified; exit POC used from routing plans If CLI is in a non-BT range a single “transit” charge band will be identified, corresponding to ONO retention.

BT-OLO NTS: TWIX verification GenIUS will provide TNOs with data showing for incoming-to-BT NTS transit traffic, amongst other things: TNO NTS range Entry POC Time period Number of calls starting in this time period Number of minutes in this time period TNOs may use the entry POC and NTS range with the “normal” EBC matrix to verify the TWIX charged by BT.

NTS and timeliness of POC inclusion in EBC The use of the Routing Plan System reduces EBC build time. Two new EBC files should reduce OLO EBC timescales. In order to reduce time lag for POC changes to be reflected in charging data BT proposes a monthly EBC as this is now practical.

EBC related activities - CPL EBC Workshop EBC related activities - CPL

Key CPL Points from the EBC workshop Duplicate numbers EBC/CPL – different Operators Oftel and BT number range data synchronisation Historical CPL data on web site CPL Guidance Process for mid-period rate changes Browsable / Downloadable CPL Synchronization Process document for the CPL Relationship between bill references and BT products

Completed and Planned Activities Audit of number ranges Timeliness of updates Notification of price changes Standardising formats in CPL entries Extra guidance and written process Price change registration Web site development

EBC Related Activities -Update EBC Workshop EBC Related Activities -Update

EBC Workshop Summary & Close

EBC Solution - Summary Routing Plan Database New Output Files NTS alignment with the EBC Solution Other Activities CPL NIPP Communicate progress on delivery Extend the principle to other developments