Coastal Restoration Team Mississippi River Reintroduction into Bayou Lafourche Special Joint Legislative Committee Meeting August 16, 2006 Special Joint.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

(your state) Master Farmer Program
Westland-Ramos Fish Passage and Habitat Restoration Project BPA Project No September 23, 2004 Westland Irrigation District.
1 Environmental Assessment of Trade Negotiations Government of Canada Approach WTO Public Forum September 25, 2006.
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
State Bridge Program STIP Development Process Oregon Department of Transportation October 3, 2007.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
NPDES Phase II in Wake County: Forging A Collaborative Approach to Stormwater Management APWA Conference September 19, 2005.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
1 Supporting the cooperation and coordination of research activities carried out at national or regional level The “ERA-NET” Scheme
FDR1 - 1 Flood Risk management History/Mission/Policies.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
BoRit Superfund Site Timeline
General Permits Schedule Update Water Quality Partnership Meeting May 19, 2005 Dewey Weaver.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Update Bren Haase Louisiana Office of Coastal Protection and Restoration Presentation.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
“Closing” the Mississippi River Gulf Outlet (MRGO): Environmental and Economic Implications Coastal Wetland Planning, Preservation, and Restoration Act.
Coastal Protection and Restoration Authority Presentation to Coastal Financing Authority July 30, 2008.
EEP Watershed Planning Overview August 12, Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Update to Loxahatchee River Coordinating Council L-8 Reservoir Water Quality Flow-way 1 Water Delivery Test G-92 Structure Replacement September 29, 2008.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
Developing Final Phase II WIPs and Milestones Jim Edward EPA Deputy Director Chesapeake Bay Program Office DDOE Meeting with Federal Partners February.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Recreational Impacts of Coastal Restoration Projects CNREP Presentation Joseph Berlin May 28, 2010.
One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers 1 Coastal Protection and Restoration Advisory Committee 3 April 2006 D
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Consistency with the 2012 Coastal Master Plan: Guidelines for Restoration Projects Receiving State Funding Bren Haase CPRA Board Meeting September 18,
Bayou Lafourche Summit Wrap-up Meeting October 17, 2011 Bayou Lafourche Summit.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
St. Johns County Water Quality Program Update March 15,
Coastal Zone Resiliency Finance (CZRF) Project Update for Louisiana Water Synergy Project May 18, 2016.
CCMP UPDATE and DRAFT of ACTION PLANS
Update for the Citizens Advisory Committee February 22, 2017
Proposed Bay TMDL Schedule
Expert Panel on Diversion Planning and Implementation: Meeting #3
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Louisiana Coastal Area
Water Reclamation Plant Feasibility Study Update
Water Quality Trading Advisory Committee MDA Headquarters
Water Quality Trading Advisory Committee MDA Headquarters
Update to Loxahatchee River Coordinating Council
Presentation transcript:

Coastal Restoration Team Mississippi River Reintroduction into Bayou Lafourche Special Joint Legislative Committee Meeting August 16, 2006 Special Joint Legislative Committee Meeting August 16, 2006 W GNV

Coastal Restoration Team 102 Years on the Bayou Potable Water Dilemma in Thibodaux Late 30’s/Early 40’s Walter Lemann Pump Station Built 1955 Bayou Lafourche Dammed st Report of Salt Water Intrusion 1906 EPA Proposed 2,000 cfs Siphon Project 1995 MRRBL Sponsored by EPA Funded by CWPPRA October 2001

Coastal Restoration Team Project Purpose To nourish and protect the marshes of the Barataria and Terrebonne Basins through the reintroduction of freshwater, sediments, and nutrients from the Mississippi River. The proposed project has the added benefits of ensuring long-term freshwater supply to the communities and industries served by the Bayou Lafourche Freshwater District, by limiting saltwater intrusion and enhancing water supply.

Coastal Restoration Team Task Force Stipulations LA Pays 50% of E&D The allocation of Phase 1 E&D funds does not Commit the Task Force to a Specific Level of Construction Funding Approved thru 30% design 30% Design Review Decision will be based on: –Updated Costs and Benefits of the project alternatives –An Assessment of existing and planned projects in the area on the benefits of the Bayou Lafourche project. –Preliminary cost and benefit allocations –A list of Preliminary Cost Sharing Sources Cost Sharing will be proportionally based on benefits received

Coastal Restoration Team Unique Achievements Outreach – focused on public concerns Special Joint Legislative Committee established Basin Wide Modeling –RMA Model – 2400 square miles –HEC RAS – Water Level Impacts Detailed Benefits Assessment –Salinity reduction/sediment-nutrient loading

Coastal Restoration Team RMA Model

Coastal Restoration Team Continuity Lines

Coastal Restoration Team Model Area by Basin

Coastal Restoration Team Run 05

Coastal Restoration Team Run 10

Coastal Restoration Team Run 10-5 Benefit Area

Coastal Restoration Team Screening of Alternatives 144 alternatives initially developed Alternatives screened on quantitative and qualitative criteria

Coastal Restoration Team Summary of Qualitative Rankings TABLE 4-9 SUMMARY OF QUALITATIVE SCORING Criteria Alternative Least Rise Maintenance Construction Impacts Dredge Volume Expandability Stormwater ControlFlood Control Diversion Flow PermittingROWEnviron mental Impacts Total ScoreN/A N/A

Coastal Restoration Team Summary of Quantitative Values TABLE 4-7 SUMMARY OF QUANTITATIVE VALUES Alternative Flow (cfs)Cost($)AAHUs Cost/cfs ($)Cost/AAHUAAHUs/cfs Water Level Impacts ($) 151,000170,000,000NA166,000NA 4,687, ,000261,000,0001,819256,000143, ,674, ,500331,000,0002,266216,000146, ,674, ,000184,000,0002,031190,00090, ,674, ,400251,000,0002,164179,000116, ,086, ,000379,000,0002,203190,000172, ,086,000 Least Rise1,000379,000,000NA379,000NA 1,164,000

Coastal Restoration Team Preferred Alternative Selection 38 selected: –Most cost efficient –Most AAHU’s per cfs (121,025 Acres) –Moderate water level impacts –Moderate construction/dredging impacts

Coastal Restoration Team Where are we now? Ph 1 Model Report And Water Level Analysis June/July 2005 Final Phase 1 Report November 2005 Review of Existing Data June 2003 Historical Water Level Analysis May 2004 Draft Ph 1 Report August 2004 Final Phase 2 Report March % Design Meeting May 9, 2006

Coastal Restoration Team Where are we going? Final Design? 30% Design Meeting May 9, 2006 CWPPRA Technical Committee Meeting June 14, 2006 CWPPRA Task Force Meeting July 12, 2006

Coastal Restoration Team July 12 th CWPPRA Task Force Stipulations 1.Identify a potential funding source for $2.5 M in Federal funds 2.Determine the impact of conducting an ITR on the work done to date 3.Investigate the legality of spending Federal monies without a determination of feasibility WRDA Bill passage? Funding Options?

Coastal Restoration Team

Coastal Restoration Team Calculated Acres Benefited

Coastal Restoration Team Next Steps: Drainage Analysis Operation/Maintenance Plan Marsh Creation Cost Estimate Updates Benefits Analysis (WVA) 95% Pump station design 95% Control structures design 95% Channel design Final Plans and Specification Completed Final EIS Identification of Construction Funding

Coastal Restoration Team ALT #38: BL, 2’-0’ RM29, 1000 cfs, $183 M Thibodaux Lockport Donaldsonville Existing Alt #38