2013-10-17 RIPE67 Athens Wolfgang Tremmel DE-CIX Apollon Migration Update.

Slides:



Advertisements
Similar presentations
Cutting Edge Interconnection for DE-CIX members
Advertisements

All rights reserved © 2000, Alcatel 1 CPE-based VPNs Hans De Neve Alcatel Network Strategy Group.
IP Router Architectures. Outline Basic IP Router Functionalities IP Router Architectures.
Service Providers Last Update Copyright Kenneth M. Chipps Ph.D. 1.
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
Common NOC Practices 4/05/2007 The Quilt NOC Common Practice Panel April 4, 2007.
powerful network monitoring & management solution
Being a QA Engineer at Telerik Snejina Lazarova Dimo Mitev Telerik Corporation
RIPE63 – EIX Working Group Wolfgang Tremmel Director Support Proxy-Arp considered harmful.
High Availability Options for JD Edwards EnterpriseOne Shawn Scanlon, GSI.
<<replace with Customer Logo>>
QoS Solutions Confidential 2010 NetQuality Analyzer and QPerf.
Copyright © Siemens Enterprise Communications GmbH & Co. KG All rights reserved. Siemens Enterprise Communications GmbH & Co. KG is a Trademark Licensee.
Hardware & Software Needed For LAN and WAN
Troubleshooting Software Tools vs. Professional Test Equipment.
ABC Co. Network Implementation High reliability is primary concern – near 100% uptime required –Customer SLA has stiff penalty clauses –Everything is designed.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for LAN Issues.
> Blueprint Kickoff >. Introductions Customer Vision & Success Criteria Apigee Accelerator Overview Blueprint Schedule Roles & Responsibilities Communications.
Storage Refresh Project Migration of Enterprise Leased Shares Websites Home Directory Service.
November 2009 Network Disaster Recovery October 2014.
RIPE64 Enum Working Group DE-CIX NGN Services.
Sales Education and Performance Consulting Presents Private Network Transport (PNT) and Class of Service (CoS)
Philip Young One Hosting Capita One Software Update Seminars 2014.
Career Opportunities in Information Technology There are four main categories of IT jobs, grouped by the main focus of the job: Sales and support Software.
Existing Solution 1 Proactive – SLR 6 hour schedule activities for managed services Stop light report is posted and reviews any open tickets for.
Slide 1 Filename_Vx.ppt SWIFTNet Migration DE/AT DIDUG, May 2003 Claudia König Regional Account Manager.
GrangeNet Dr. Greg Wickham APAN NOC 25 August 2005.
Continous Integration & Continous Deployment - For the new nameserver infrastructures of DENIC eG 15/10/03 – Christian Petrasch
LINX update to EIX John Souter, Agenda 1.New staff 2.Improvements to monitoring & set-up 3.Move to new optical platform 4.Move to VPLS architecture.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
Lucent Technologies – Chris Miller
November 1999 London Internet Exchange Keith Mitchell, Executive Chairman JPIX Meeting, July 2000.
NETWORKING COMPONENTS BY: TRAVIS MARSHALL. HUBS A hub is a device within a network that has multiple Ethernet ports that devices can plug into. The hub.
An Application of VoIP and MPLS Advisor: Dr. Kevin Ryan
DIT Campus Network Final Presentation Team Members Honoratha Shayo Vincent Jacob Ivan Masue Fredrik Andersson Ombeni Mnzava Sylvester Kimbi.
How to Build a NOC. Identify Customers –Who are your customers? Understand Customer Expectations –What are your user expectations? –SLA’s? Support Service.
T Iteration Demo Team DTT Project planning (PP) Iteration
INNOVATE THROUGH MOTIVATION MSP Services Overview KEVIN KIRKPATRICK – OWNER, MSP INC LOGO.
Information Systems in Organizations 2.2 Systems Architecture: Devices, Network, Data and Apps.
John Samuels October, Why Now?  Vista Problems  New Features  >4GB Memory Support  Experience.
A SEMINAR ON “ Mobile Number Portability” Submitted To: Presented By: Mr. Surendra Kumar Yadav Prabin Kumar Biswas HOD (CSE/IT) B.Tech. IV yr.
Automated provisioning of Ethernet OAM in CarrierEthernet networks: the case of GRNET Leonidas Poulopoulos Michalis Mamalis Stauros.
T Project Review Sotanorsu I2 Iteration
BSA 385 Week 3 Individual Assignment Frequent Shopper Program Part 2 Check this A+ tutorial guideline at
UC Pro Troubleshooting Guide
AARNet Network Update IPv6 Workshop APAN 23, Manilla 2007 AARNet.
Telebell Implementation and maintenance of telecommunications networks
Welcome! Thank you for joining us. We’ll get started in a few minutes.
Working of Script integrated with SiteScope
technical-service/ technical-service/
Interconnecting IXPs: pros and cons
CORPORATE PROFILE JUNE 2016
2018 New Microsoft Exam Dumps Killtest
Stratus Innovations Group Virtual Datacenter Offering
Decomposition.
Interconnecting IXPs: pros and cons
AARNet Network Update IPv6 Workshop APAN 23, Manilla 2007 AARNet.
Porting Process : Portugal
Porting Process : Austria
Porting Process : Portugal
Non-Geographic Porting Process : SPAIN
Orange ASP Training Module
Customer Overview Pack – July 2018
Customer Overview Pack – July 2018
Redefinition of Business Continuity Strategies using Cloud Native Enterprise Architectures Frank Stienhans, CTO August 2016.
Internet Exchange.
In-network computation
SBS 2008 – One year on David Overton
Presentation transcript:

RIPE67 Athens Wolfgang Tremmel DE-CIX Apollon Migration Update

The story so far…. DE-CIX about to replace its production infrastructure –From Force10 switches to Alcatel-Lucent routers –From pure layer 2 switching to MPLS/VPLS routing –From passive to active optical network layer Details of the new architecture were presented at RIPE66 Dublin This is an update about the current state of the migration

Artemis New DE-CIX internal tool –Technical customer database –provisioning –configuration Completely written from scratch –19203 lines of code so far –200 man days development time Replaces a lot of over-the-years-grown scripts

DE-CIX Apollon – Migration Preparation Database cleanup – comparing reality with database Kickoff meeting with datacenter operators Working closely with the datacenter operators to find the best strategy for each DE-CIX site –Precabling new hardware –On some sites we needed to replace lots of connections to customer –Big “Thank You” to Interxion, Telecity and Level3 for their effort and professionality to help us make these migrations happen

DE-CIX Apollon – Migration Preparation - Customers Customers are individually notified at least two weeks in advance And again on the day before the migration Technical list is of course also notified For one site we needed a LOA from each customer, as all fibres had to be replaced. Directly after each individual move the migrated customer is again notified

DE-CIX Apollon – State of the migration Three migration windows done 94 customers with 237 ports are already migrated Migrations happen on Wednesdays, starting at midnight Last migration will be on 4th of December

Migration – how does it work? Team of four Datacenter engineer on site moving fibres DE-CIX engineer in office doing configuration DE-CIX customer supporter in office updating customers Standby DE-CIX engineer on site for special situations All connected via a phone bridge All having a view on the router logfile to monitor status

Migration – how do we do it? Onsite meeting in the week before the migration On the day of the migration: Be at the office at 23:30 Start the phone bridge Start migrating customers at midnight Until finished – with a 10 minute break every hour Write a report and do a handover to the day team

Migrating customers Pull out fibre on the old platform Plug fibre into new DE-CIX Apollon platform Check light level – clean if necessary Check ping / packet loss Activate port Notify customer Takes about 3 minutes EtherChannels: Move half of ports, then test and activate

Thank you! Join DE-CIX now! DE-CIX Competence Center Lindleystrasse Frankfurt/Germany Phone DE-CIX Competence Kontorhaus Building Frankfurt Osthafen (Docklands)