Web Trnsport Agency Feedback. Agencies Visited: Florida DOT Indiana DOT North Carolina DOT Ohio DOT Oklahoma DOT Vermont DOT.

Slides:



Advertisements
Similar presentations
Introduction to Web Bill of Lading Q Proprietary and Confidential Copyright © 2005 INTTRA Inc. 2 Agenda Industry Challenges INTTRA Solution Value.
Advertisements

1. XP 2 * The Web is a collection of files that reside on computers, called Web servers. * Web servers are connected to each other through the Internet.
North American Numbering Council Billing & Collection Working Group Wednesday, November 30, 2005 Co-Chairs: Rosemary Emmer, Sprint Jim Castagna, Verizon.
Michigan Electronic Grants System Plus
Michigan Electronic Grants System Plus
©2011 Quest Software, Inc. All rights reserved.. Andrei Polevoi, Tatiana Golubovich Program Management Group ActiveRoles Add-on Manager Overview.
©2010 AECsoft USA Confidential External User Guide AECsoft USA, Inc Yorktown, Suite 435 Houston TX ©2010 AECsoft USA Confidential.
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Presentation Prepared For:. Secure user Login provides access to specific ship-to addresses, customer catalog, order processing rules, and other account-based.
Web Trnsport Implementation TEA/TUG October 1-9, 2008 Saratoga Springs, NY.
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
“The Honeywell Web-based Corrective Action Solution”
Request Tracker IT Partners Conference Oliver Thomas 19 April 2005.
Online, Web-Based Data Collection System February, 2011.
July 31, Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
Getting Started with D2A
1 BRState Software Demonstration. 2 After you click on the LDEQ link to download the BRState Software you will get this message.
® Microsoft Office 2010 Browser and Basics.
E-Performance Review Career Service Authority. Overview Creating Documents Creating Documents through Cloning Editing Documents Completing PEP/Starting.
RefWorks: The Basics October 12, What is RefWorks? A personal bibliographic software manager –Manages citations –Creates bibliogaphies Accessible.
Practice Insight Instructional Webinar Series Eligibility Manager
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
ECATS “The Honeywell Web-based Corrective Action Solution” CAR Process Last Revised: August 19 th 2008 Honeywell Confidential & Proprietary.
Welcome to Florida International University Online J.O.B.S. Link Applicant Tutorial.
How to get started RMA Portal ZEBRA TECHNOLOGIES March 19, 2015.
Systematic Review Data Repository (SRDR™) The Systematic Review Data Repository (SRDR™) was developed by the Tufts Evidence-based Practice Center (EPC),
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
Agenda 22 7.SharePoint Changes 8.Items & Lists 9.Files & Libraries 10.SharePoint & Office 11.Help 12.Wrap Up.
Next Generation Trnsport Presented by Paul Neumann, TTF Chair, Colorado DOT Ian Baldwin, Info Tech, Inc. November 2005.
1 Agenda Views Pages Web Parts Navigation Office Wrap-Up.
What is so good about Archie and RevMan 5
© 2013 Ticor Title | tt_cwp_122013_v1_3 Customer Web Portal Overview Simply, Connected to your order.
©2011 Quest Software, Inc. All rights reserved. Steve Walch, Senior Product Manager Blog: November, 2011 Partner Training Webcast.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager November 6, 2005 A Primer for Trnsport Users.
Microsoft SharePoint 2010 Upgrade Preview FSU SharePoint Users Group Presents: Thursday, December 1 st, 2011.
Web Trnsport Development Update Presented by Monelle McKay, Info Tech, Inc. October 2008.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
June 18, Agenda Welcome Updates and Reminders New CT.gov Site eGovernment Applications Questions & Comments.
September 10, Agenda Welcome Updates Reminders New CT.gov Site Questions & Comments.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
Web Based Inventory Site Building Room Asset Number Category Type Description Serial Number Manufacturer Model Vendor Name Acquired Date P O Number Budget.
XP New Perspectives on Browser and Basics Tutorial 1 1 Browser and Basics Tutorial 1.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 26, 2006.
Creating a Web Site to Gather Data and Conduct Research.
Courier Tracking System. Small Courier Operations Small courier services collect Letters and parcels from customers and issues its own POD number Then.
ClientPoint ™ Data Entry Workflow. ClientPoint “The filing cabinet!” Search for existing clients, or add clients.
Facility Reporting v. 1.0 Managing Clinical Staffing Reports on the Illinois Outcomes Website May 20, 2009.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
Warehouse Report. Log into EDS using your Address/User Id and Password. If you have forgotten your password, click on the Forgot Password? link.
Roles 1. Your Role: End User End Users use Inside NCDOT and Connect NCDOT for basic browsing and reading Typical tasks can include: Open or download files.
Exercise Your your Library ® RefWorks: The Basics October 10, 2006.
LINCPlus Overview Complete binding preparation module includes features such as security, titles database, reports and job costing options. Integrated.
XP Browser and Basics COM111 Introduction to Computer Applications.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 9, 2007.
Next Generation Trnsport Current Development Update Presented by Ian Baldwin, Info Tech, Inc. October 2006.
SME - Amsterdam Aad van der Velden, September 2015 CRM 2015 – Training Release 1.
Annual Performance Report ( APR ) Data Entry Workflow.
Next Generation Trnsport Impact Assessment Sub-project Jim Johnson, Florida DOT and Pamela Barry, Info Tech, Inc.
Waste Management Inspection Tracking System (WMITS)
GMAP Grant Management, Application, and Planning Consolidate Application Training.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Dept user Logs in from Home Page for tender creation Login with user name and password.
1. Begin Quick Start 2. Administration 3. Good to Know 4. Slightly Technical 5. User Experience 6. You are ready to go !
Transportation Agenda 19. Transportation Your Role: Designer Designers organize SharePoint content and determine how to display that content Typical tasks.
USOAP Continuous Monitoring Approach (CMA) Workshop
OneSupport Help Center (OSHC) Training
Patents e-Commerce Update: Public and Private PAIR
Patents e-Commerce Update: Public and Private PAIR
Presentation transcript:

Web Trnsport Agency Feedback

Agencies Visited: Florida DOT Indiana DOT North Carolina DOT Ohio DOT Oklahoma DOT Vermont DOT

The agencies were asked to perform the following tasks: Project and related data: –Create Project, Categories, Project Item, Funding, Location data, and Generate Detailed Cost Estimate Reports Proposal and related data: –Create Proposal, Associate Projects to Proposal, Price Proposal Items, Proposal Times, and Generate Proposal Level Reports Letting and bid data: –Create Bid Letting Record, Associate Proposal to Bid Letting, Create Electronic Expedite File, Enter Proposal Vendor Data, and Manual Entry of Bids

The Information feedback collected covered: Content Navigation Screen layouts Workflow Error messaging Report generation and layout On-line help

Comments were separated into: Errors = Call ticket Existing backlog items New functionality, improvements or nice to have’s = call ticket General statements

Call tickets generated: FLDOT: 38 call tickets INDOT: 18 call tickets NCDOT: 22 call tickets OHDOT: 22 call tickets OKDOT: 10 call tickets VTDOT: 23 call tickets All entered in Team track for public view

Top items from multiple states: Yes/No/Cancel Back button to work Add direct links between proposal vendors, bids, and lettings Add a close button to the initial report page Create a 1 page first-time-user tips Reword & Reformat quick search on home page Associate categories to items and alternates to items easily Make Help button bigger Add HOME to home icon or replace with wording

Questions?

web Trnsport – Release 1 Status and Beta Testing Status

Preliminary Release (Pre-Production) Evaluation license available to all agencies –No evaluation fee for Release 1 –Provide standard level of evaluation licensee support Early feedback prior to Beta and Production release is important Agencies should contact a TTF member

Agencies Requesting Release 1: The TTF will be sending out a letter to End User Designees (EUD) notifying agencies of Release 1

Beta Testing 3 month beta period (March through May 2008) Beta site mobilization complete at least one sprint in advance Beta begins with February 2008 sprint results –At least 85% of planned business functionality complete March and April sprint results provided to sites –100% planned business functionality in April results –Will also include beta issue resolutions

Beta Testing – Pre-install Checklist Agency has the latest client/server Trnsport releases installed for interface testing Agency Cloverleaf access to download software. Agency Team Track access for beta issue reporting. ITI has access to test and development database and web servers.  Validate required client/server interface environment.  Have agency review instructions for the prior sprint in order to identify possible issues with the release sprint

Beta Testing Time Frame Phase 1 – Agency acquire and install hardware and software required for beta testing –February 2008 timeframe Phase 2 – receive sprint –March 2008 timeframe – beta testing begin Web Install Database install Migration testing Application testing TTF requests beta site volunteers by November 16, 2007

Questions?