FIG_18.jpg.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
AP STUDY SESSION 2.
1
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Sequential Logic Design
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
Addition and Subtraction Equations
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
Regression with Panel Data
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Artificial Intelligence
When you see… Find the zeros You think….
Midterm Review Part II Midterm Review Part II 40.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
12 October, 2014 St Joseph's College ADVANCED HIGHER REVISION 1 ADVANCED HIGHER MATHS REVISION AND FORMULAE UNIT 2.
Subtraction: Adding UP
: 3 00.
5 minutes.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Meat Identification Quiz
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
FIG_14.jpg.
Presentation transcript:

FIG_18.jpg

Atterberg Limits of Bay Mud FIG_18A.jpg

Variation of Index Properties with Depth Muni Metro Turnback Site (Embarcadero Waterfront) FIG_19.jpg

Index Properties of Bay Mud Islais Creek Area Marshlands (Contract C Alignment) FIG_20.jpg

Index Properties of Bay Mud Islais Creek Channel Area (Digesters Project) FIG_21.jpg

Index Properties of Bay Mud DTX Segment Along Townsend Street (Mission Bay Area) FIG_22.jpg

Normalized Undrained Strength Behavior of Bay Mud DSS Tests FIG_23.jpg

Variation of Normalized Strength Ratios with Overconsolidation Ratio FIG_24.jpg

SHANSEP Principles of Normalized Undrained Strength Behavior FIG_25.jpg

Anisotropic Behavior of Soft Clays FIG_26.jpg

Normalized Strength-Strain Behavior from Undrained Ko-Triaxial Compression Tests FIG_27.jpg

Pore Pressure Behavior from Ko-Triaxial Compression Tests: NC Soil FIG_28.jpg

Excess Pore Pressures from Ko-Triaxial Compression Tests: OC Soil FIG_28A.jpg

Effective Stress Paths from Ko-Triaxial Compression Tests FIG_29.jpg

Anisotropy and Strain Compatibility Considerations FIG_30.jpg

Correlation of Normalized Strength Ratios from DSS and Vane Shear Tests FIG_31.jpg

SHANSEP Principles of Normalized Undrained Strength Behavior FIG_32.jpg

Undrained Shear Strengths from Vane Shear Tests Islais Creek T/S Project (Contract D) FIG_33.jpg

Stress History and Vane Shear Strengths Muni Metro Turnback Site FIG_34.jpg

Undrained Shear Strengths from Vane Shear Tests DTX Alignment Along Townsend Street FIG_35.jpg

Undrained Shear Strengths from Vane Shear Tests Islais Creek Area Along Davidson Street FIG_36.jpg

Stress History and Undrained Strengths from Vane Shear Islais Creek (Contract C) FIG_37.jpg

Vane Shear Strengths and Excavation Deformations Rankin Pump Station Site: Islais Creek Estuary FIG_37A.jpg

Undrained Shear Strengths from Vane Shear and Torvane Tests Hamilton Field, Deep Mud Area FIG_38.jpg

Undrained Shear Strength of a Site Undergoing Consolidation Under “Recent” Reclamation Fill FIG_39.jpg

Stress History and Undrained Vane Shear Strengths of Organic Bay Mud at a Recently Reclaimed Site FIG_40.jpg

Variations in Undrained Shear Strengths Between Offshore and Onshore Sites FIG_41.jpg

Field Vane Tests Inner Marshlands of Islais Creek Shallow Mud (Contract C Site) FIG_42.jpg

Comparison of Field Vane Shear Strength with Geotechnical Report Recommendations FIG_43.jpg

Vane Shear Strength Inner Marshlands at Islais Creek – Contract C Near McKinnon Street (Deeper Mud) FIG_44.jpg

Typical Results of CPT Tests in Bay Mud FIG_45.jpg

Correlation of Undrained Strengths from CPT and Vane Shear Tests Hamilton Field Site FIG_46.jpg

Correlation of Undrained Strengths from CPT and Vane Shear Tests Mission Bay Site Along Townsend Street FIG_47.jpg

Estimation of Maximum Past Pressures from Vane Shear Tests Hamilton Field Site FIG_48.jpg

Maximum Past Pressures Estimated from Vane Shear Tests Mission Bay Along Townsend Street FIG_49.jpg

Estimation of Maximum Past Pressures from Vane Shear Tests Hamilton Field Site: Shallow Mud Area Under Existing Levees FIG_50.jpg

Estimation of Maximum Past Pressures from Vane Shear Tests Shallow Mud – Free Field Area (HW) FIG_51.jpg

Estimation of Maximum Past Pressures from Vane Shear Tests Muni Metro East Site FIG_52.jpg

Undrained Shear Strenghts from Vane Shear Tests Muni Metro East Side FIG_52A.jpg

Estimation of Maximum Past Pressures from Vane Shear Tests Transbay Terminal Site FIG_53.jpg

Comparison of Undrained Shear Strengths from Vane Shear and UU Tests Muni Metro Turnback Site FIG_54.jpg

Title FIG_54A.jpg

Undrained Strengths from Vane Shear, UU, and Torvane Tests Digesters Site – Islais Creek Estuary FIG_55.jpg

Normalized Undrained Modulus from DSS Tests Normally Consolidated Bay Mud FIG_56.jpg

Normalized Undrained Modulus from DSS Tests Normally and Overconsolidated Bay Mud FIG_57.jpg

Variation of Normalized Modulus with Strain Level Ko-Triaxial Compression Tests FIG_58.jpg

Variation of Compression Ratio with Moisture Content: Bay Mud and Stiff Clays at Hamilton Field Site FIG_59.jpg

Variation of Compression Ratio with Moisture Content North Bay Site FIG_60.jpg

Variation of Recompression Ratio with Moisture Content FIG_61.jpg

Variation of Coefficients of Vertical Consolidation with Liquid Limit FIG_62.jpg

Variation of Hydraulic Conductivity with Void Ratio FIG_62A.jpg

Coefficient of Vertical Consolidation of Organic Bay Mud FIG_63.jpg

Post-Construction Settlements at a Preloaded Site North Bay Site FIG_64.jpg

Asaoka Method for Estimation of Coefficients of Consolidation and End of Primary Consolidation FIG_65.jpg

Estimates of Coefficients of Horizontal Consolidation Using the Asaoka Method (Jamialkowski, et al., 1995) FIG_66.jpg

Variation of Ch with Drain Spacing FIG_67.jpg

Variation of Coefficients of Secondary Consolidation with Consolidation Stress FIG_68.jpg

Variation of Coefficient of Secondary Consolidation with Moisture Content FIG_69.jpg

Variation of Ca with Moisture Content FIG_70.jpg

Long-Term Settlements at Mission and Howard Streets FIG_71.jpg

Extrapolation of Settlement Data at Mission Street Secondary Compression FIG_72.jpg

Estimation of Coefficients of Secondary Consolidation from Long-Term Settlement Data FIG_73.jpg

Estimation of Coefficients of Secondary Consolidation from Settlement Data FIG_74.jpg

Effects of Surcharge on Secondary Compression (Ladd, 1989) FIG_75.jpg

Reduction of Coefficient of Secondary Consolidation Due to Surcharge (Ladd, 1989) FIG_76.jpg

Shear Wave Velocities of Bay Mud FIG_77.jpg

Tentative Correlation of Shear Wave Velocity with Undrained Shear Strength of Bay Mud FIG_78.jpg