WCCUSD Bond Program Construction Update

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

ax2 + bx + c 2x2 + 11x + 5 ac 2(5) = b =11 ( ) 2x2 + 10x + 1x
Advanced Piloting Cruise Plot.
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Replacement of the Queens Approach Bronx-Whitestone Bridge
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Critical Approval Commissioner/ State Board of Education Commissioner/ State Board of Education Concept Conference s Concept Review Review and Approval.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
Addition using three addends. An associative property is when you group numbers in anyway and the answer stays the same.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Welcome to Who Wants to be a Millionaire
ZMQS ZMQS
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Football Stadium. I need 200,000 seats. If a seat is $10.00 a piece, how much will I spend?
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
Madrid Project Week. Unit Question: How have you used training experience to enhance your skill and practice, your reflection, and your leadership and.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
General OH&S Induction Training Course 1 WHAT’S SO IMPORTANT ABOUT OCCUPATIONAL HEALTH & SAFETY? IN THE YEAR 2003, MORE PEOPLE WERE KILLED IN WORK RELATED.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Chapter 5 Test Review Sections 5-1 through 5-4.
Construction Cost$81,145,453 Notice of Completion04/01/ /15/2014 FSC Meeting.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
What is Slope Assignment. List the four types of slope and sketch each type. 1.
Week 1.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb Friday 27 th Jan Friday 10 th Feb Thursday 14: :00 Friday 16:00 – 19:00 HS N.
We will resume in: 25 Minutes.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
X-box Factoring. X- Box 3-9 Product Sum Factor the x-box way Example: Factor 3x 2 -13x (3)(-10)= x 2x 3x 2 x-5 3x +2.
Weekly Attendance by Class w/e 6 th September 2013.
Solve an equation by multiplying by a reciprocal
Edward Downer Elementary School Playfield Renovation Status Update 10/14/14.
One step equations Add Subtract Multiply Divide Addition X + 5 = -9 X = X = X = X = X = 2.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Coronado Elementary School Project Status Update 05/13/14.
Edward Downer Elementary School Playfield Renovation Status Update 06/10/14.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
Chapter 8 Plot Plans.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
The art and act of creating indoor spaces that are FUNCTIONAL & EYE-CATCHING! FORM FOLLOWS FUNCTION.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
El Cerrito High School Stadium Project Status
Steps To Prepare Site For Site Work Construction Calhoun GA.
21st Century School Buildings Plan
Presentation transcript:

WCCUSD Bond Program Construction Update El Cerrito High School Stadium 07/15/2014

El Cerrito High School Stadium Conceptual Design

El Cerrito High School Stadium Project Team General Contractor Wright Contracting Architect of Record WLC Architects Construction Manager Hector De Leon Project Engineer Maria Zupo Inspector of Record Kris Gilbert

El Cerrito High School Stadium Site Plan

El Cerrito High School Stadium General Information Contract Amount $13,438,000 Notice of Award 11/21/13 Notice to Proceed 01/27/14 Duration 608 days Completion Date 09/27/15 Change Order $10,285.00 (0.07%)

El Cerrito High School Stadium Progress Update Site retaining walls at Ashbury and Colusa Fence piers at Colusa Building retaining walls and foundations Site grading and compaction Underground utilities

Backfilling at Ashbury

Site Walls and Foundation

Building Footings

Retaining Wall Construction at Colusa

Retaining Wall Construction at Ashbury

Retaining Wall Construction at Ashbury

Tree Planting

El Cerrito High School Stadium Ashbury Avenue Elevation