The following motorway sections will be in the future motorway network: 1.Banja Luka – Gradiska, 35 km 2.Banja Luka – Doboj, 71,91 km, 3.Doboj – Vukosavlje.

Slides:



Advertisements
Similar presentations
About us Motorways of Federation of B&H Ltd Mostar is 100% owned by the Government of Federation of B&H Motorways of FB&H is responsible for managing,
Advertisements

Bosnia and Herzegovina Growth-Oriented Local Development (GOLD) Project Transforming Communities Through Economic Development February 6, 2014 The GOLD.
Find the measure of each angle. Justify your answer.
F o r m u l a M a s s. F o r m u l a a n d M o l e c u l a r M a s s z E v e r y M o l e c u l a r m a s s i s a f o r m u l a m a s s. z N o t e v e.
Bulgaria’s strategic road infrastructure challenges.
MINISTRY OF INDUSTRY, ENERGY AND MINING Phone: 051/ Republic of Srpska MINISTRY OF INDUSTRY, ENERGY AND MINING Investment.
1 Infrastructure in Bosnia and Herzegovina dr. Jasmin Bučo
Company Presentation. Slide subtitle Heading Conclusion Title […] ‒ […] ― […] 2.
1. 2 From tolling to availability payments. PPP in the Hungarian motorway development Ferenc Tóth Concession director.
11th meeting of the Steering Committee for Pan-European Corridor X Belgrade, Republic of Serbia
Phase Difference = Phase Difference = 0.05.
Construction Tool Identification Contest District Level 2015.
MINISTRY OF TRANSPORT AND COMMUNICATIONS REPUBLIC OF SRPSKA GOVERNMENT.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
European Serious Crime Conference -Common Understanding- Common Threat- -Common Response-
BEI/EIBAUTOVIA LEON – BURGOS Phase III Territorial Analysis: Potential Spatial Development Impacts and Network Effects KEY INDICATORS: Spatial Impact:
High-pressure gas pipelines projects
UNECE WP on Transport Trends and Economics Geneva, 15 September 2006 Activities on Pan European Transport Corridor VI Marian HANTAK TEM Project Central.
 PPP Department within the Ministry of Economy and Transport  Government Decree in May 2003 to set up an Interdepartmental Committee – Ministry of Economy.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
PROJECT TITLE Name Date Etc. PROJECT OVERVIEW & PROGRESS: SLIDE 1 Bullet.
City of Palm Coast Northeast Corridor Projects. Northeast Corridor - Project Status Palm Coast Parkway Matanzas Woods Parkway Palm Harbor Parkway Extension.
1 Title Line on a Divider Slide Format >Level one bullet text for a divider slide.
2nd Modern Housing SWG Meeting Presentation of activities in Republic of Srpska/B&H Venice, February 16th, 2011.
RSA in Austria CEDR SG „Road Safety“ Eva M. Eichinger Copenhagen, April, 2004 Road Safety Audit in Austria Eva M. Eichinger, M.Sc., Ph.D. Federal Ministry.
PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY). CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan.
Innovative CAD–GIS–BIM Solutions
BOSNIA AND HERZEGOVINA REPUBLIC OF SRPSKA CITY OF PRIJEDOR.
PRESENTATION TITLE PRESENTER NAME Presenter title, organization © 2015 Internet2 Subtitle (if any)
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
State of play of Corridor X Technical Secretariat Pan-European Transport Corridor X REPUBLIC OF GREECE MINISTRY OF INFRASTRUCTURE, TRANSPORT AND NETWORKS.
Paddy’s Flats Construction laydown area (Total Disturbance 12.8ha)
Meeting of WG Cooperation of Business Organizations
Ms. Nerejda Hoxha, SEETO Transport Planning Manager
PARTNERSHIP V ‘Business Opportunities for FDI in Balkans in the field of renewable energies, waste management and recycling’
Ekvator Company Ltd. Banja Luka, B&H
continued on next slide
Regional cooperation and FDI inflow Docent dr. Maida Bećirović
Indiana U t Wendy Balmer
                                                                                                                                                                                                                                                
Text Here Bullet point copy here Title of Large Bullet Slide Text May be Put Here with Multiple Bullets Below Secondary Bullet Style Second Bullet.
continued on next slide
continued on next slide
Agenda item number 1 Agenda item number 2 Agenda item number 3 Agenda item number 4 Agenda item number 5.
Mr. Dejan Lasica, SEETO General Manager
Title Layout Subtitle.
SITE PICTURES AND PROGRESS
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
DBBT MASTER STUDIES University of Banja Luka progress report
Presenter’s Affiliation
Title of Pod Unit Number – Unit Name.
II //II // \ Others Q.
Велики откриватели и пътешественици
Bosnia and Herzegovina
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
PUBLIC ENTERPRISE ROADS OF SERBIA.

Railway Infrastructure Projects
TT – National Trade Corridors Fund – Airport Trail Phase 2
What is the median of this data?
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
(ii) ((QP)P)(P(PQ))
continued on next slide
EBRD and its Objectives
LOT COORDINATION CENTRE
PRESENTATION TITLE SUBTITLE Presenter Name Date.
continued on next slide
Presentation transcript:

The following motorway sections will be in the future motorway network: 1.Banja Luka – Gradiska, 35 km 2.Banja Luka – Doboj, 71,91 km, 3.Doboj – Vukosavlje (koridor Vc), 46 km, 4.Banja Luka – Kupres (Glamoc), 110 km, 5.Banja Luka – Prijedor – Novi Grad, 71 km, 6.Vukosavlje – Samac - Bijeljina, 98 km.

Example Bullet Point Slide 2

Banja Luka – Gradiska (I phase)Banja Luka – Gradiska (I phase) (completed) (completed) Mahovljani Motorway InterchangeMahovljani Motorway Interchange (completed) Banja Luka – Gradiska (II phase)Banja Luka – Gradiska (II phase) (completed) (completed) Banja Luka - DobojBanja Luka - Doboj (Construction in progress) Corridor VcCorridor Vc (ready for construction – PPP in preparation)

Example Bullet Point Slide 2

The following motorway sections will be in the future motorway network: 1.Banja Luka – Gradiska, 35 km 2.Banja Luka – Doboj, 71,91 km, 3.Doboj – Vukosavlje (koridor Vc), 46 km, 4.Banja Luka – Kupres (Glamoc), 110 km, 5.Banja Luka – Prijedor – Novi Grad, 71 km, 6.Vukosavlje – Samac - Bijeljina, 98 km.