Apr 20081 UtilityAMI OpenHAN TF 2008 Work Stream Discussion Teleconference 30 April 2008.

Slides:



Advertisements
Similar presentations
Enterprise respondents in focus - Enterprise data collection and quality assurance Quality in Official Statistics Rome 8-11 July 2008 Hannele Orjala, Statistics.
Advertisements

29 May GNSO Improvements Top Level Plan 29 May 2009 Plan distributed 22 May by Avri.
COBECOS Brest of February COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION Brest of February 2008.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
Doc.: IEEE /0217r0 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
12-CRS-0106 REVISED 8 FEB 2013 Humanitarian Technology Activities 2015 IEEE Region 10 Meeting, Dhaka, 7- 8 March 2015 IEEE R10 HTA2015 Coordinator: Rajnish.
1. REGISTRATION  Student to submit the Registration Form to the office at level 7 on the 2 nd week of a semester (use form FCE.UiTM.FYP 1&2.REGISTERFORM.2010)
ENL1819T Progress Report Confidence in Our Success.
Doc.: IEEE s Submission March 2015 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
UtilityAMI HAN Task Force Erich W. Gunther – Chairman Jan 25, 2008 – Tampa, FL.
Open AMI Network 10/22/08.
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: January 28, 2010 Source: Edge Conformity Task.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1520r4 Submission January 2016 Slide 1 IEEE LRLP TIG Long Range Low Power January 2016 Date: Authors:
Doc.: IEEE /0241r0 AgendaRich Kennedy, MediaTek IEEE /15 Regulatory SC Macau DRAFT Meeting Plan and Agenda Date: Authors: March.
Doc.: 18-13/045r0 Submission April 19, 2013 John Notor, Notor Research Slide 1 Agenda for Teleconference Meeting April 19, 2013 Date: March 26,
Doc.: IEEE /1318r0 Submission December 2009 Rich Kennedy, Research In MotionSlide 1 IEEE Regulatory AHC Draft Teleconference Plan Date:
0 Evaluation of Standards Harmonization Process for HIT Chicago, IL. January 23, 2008 HITSP Project 2008 Work Plan and Schedule Contract HHSP EC.
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
TGn Chair’s Status Update
Testing Technical Committee Paris, France August 24, 2010
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
TGv Closing Report March 2008
RR-TAG (802.18) to Liaison Report
TGaf San Francisco Closing Report
ABOUT STUDENTS REGIONAL CONSORTIUM Meeting Presentation April 11, 2016
IBC Review Pathway Approximate Timeline Online status Online“Sub”State
NATA Foundation Building Blocks Process
Proposal Phase Draft & Review Phase Approval Phase
TGaf Waikoloa Closing Report
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2014]
Capital Planning Advisory Group FY 2019 March 12, 2018
Revision TG March 2018 Rosemont Meeting Agenda
Action/ Deadline/ Event
RTA TIG Agenda Date: Authors: March 2019
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2015] Date.
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
Timelines for n Final Call for Proposal
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
TGn Chair’s Status Update
TGaf San Antonio Closing Report
IEEE TGaf Singapore Closing Report
TGmd March 2019 Closing Report
TGaf Waikoloa Closing Report
IEEE TGaf DRAFT Meeting Plan and Agenda
<month year> doc.: IEEE ptc January 2014
TGMb – Report Date: Authors: March 2008 March 2008
Task Group AY April 4, 2018, Teleconference Call Agenda
IEEE TGaf Palm Springs Closing Report
Task Group AY April 4, 2018, Teleconference Call Agenda
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TGbc Closing Report Date: Authors: March 2019
TGmd July 2017 Closing Report
TGaf San Antonio Closing Report
Emerging Issues and Outreach
Revision TG March 2018 Rosemont Meeting Agenda
Fiona Campbell, ISA 315 Task Force Chair & Deputy Chair of the IAASB
IEEE TGaf Beijing Closing Report
TGbd Closing Report – Vietnam
Presentation transcript:

Apr UtilityAMI OpenHAN TF 2008 Work Stream Discussion Teleconference 30 April 2008

Apr Agenda  Review minutes  Work Stream Discussion  Document maintenance  Testing and certification – compliance board  PCT reference design  Information models  Next call

Apr Work Streams  Document Maintenance  Final, cleaned up doc expected next week  Are there any addenda to be considered yet?  UtilityAMI OpenHAN Compliance Board  Proposal:  Small board (5 members?) from OpenHAN CDT utilities  Develop process for submission for consideration, Panel review, and certification notification  PCT Reference Design  Revise CA T24 PCT Reference Design  Common Information Model  In parallel and in coordination with AMI Enterprise  Focus on HAN edge services

Apr Timeline