. BOLT SEQUENCE Loosening – start with #25 Tightening – start with #1 Numbered bolts are 8mm, others are 10mm Guide Pin Bolt 10mm All bolts torqued 90-

Slides:



Advertisements
Similar presentations
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
Advertisements

RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
Steering Systems Chapter 44.
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
GEAR TRAIN, SHAFT, BEARING SERVICE l CHAPTER 4 l LAB MANUAL l PAGE 61.
Manual Flo-tap Installation Instructions
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
Clutch Fundamentals Chapter 69.
Engine Removal and Disassembly
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
Model 12 Intek Horizontal OHV
Step 12 Here is the issue…..the mount for the throttle arm is pushed up against the side of the housing. The problem with this is it allows (due to alignment)
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Small Engine Reassembly Briggs & Stratton OHV
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
HYDRAULIC COMPONENTS AND CONTROL SYSTEMS
Equipment and Tool Institute June 18, Challenger Body Structure Diane Coopmans, Body Structures Engineering.
2013 NATEF Task Area A-2 Automatic Transmission A. General Transmission & Transaxle Diagnosis B. Transmission & Transaxle Maintenance & Adjustment.
Chapter60 Parking Brakes.
PARKING BRAKE OPERATION, DIAGNOSIS, AND SERVICE
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Automotive Brake Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
Sockets, Ratchets, and Impacts Speed Wrench - Available in 1/4”, 3/8”, 1/2” Drives.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
Model 12 Intek Horizontal OHV
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
Automatic Transmission Components and Operation
OBJECTIVES Discuss parking brake pedals and automatic parking brake release. Explain parking brake linkages. Describe drum parking brakes. Describe caliper-actuated.
Automatic Transmissions and Transaxles
”-10”.
ENGINE MODE CODES.
½”-10”.
Automatic Transmissions and Transaxles
Clutch Fundamentals.
475, 475V, 475XL 4”-10”.
826YD 21/2”-10”.
Automatic Transmissions and Transaxles
009 2½”-3”.
RPDA 4AN 21/2” – 6”.
2000SS 2½”-12”.
DCDA4A 21/2” – 6”.
DCDA4AN 2½” – 6”.
¾”-2”.
OBJECTIVES After studying Chapter 14, the reader should be able to: Describe the repair operations that are performed with the transmission in the vehicle.
½”-10”.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
774 DCDA 21/2”-12”.
5000SS 21/2”- 6”.
909 21/2”-10”.
2000SS 2½”-12”.
DC4A 21/2” – 6”.
880V 21/2”-10”.
975 2½”-10”.
774 2½”-12”.
C400, C400N, C400Z 21/2”-10”.
4000CIV 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
DC4AN 2½” – 6”.
450DA 4”-10”.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
Chapter 7: Classroom and shop manuals
Presentation transcript:

. BOLT SEQUENCE Loosening – start with #25 Tightening – start with #1 Numbered bolts are 8mm, others are 10mm Guide Pin Bolt 10mm All bolts torqued in/lbs

Rooster Comb Spring Shift linkage shaft Manual Valve Shaft tab fits into manual valve groove Picture is 95 model Parking Pawl MLPS Shift linkage shaft Shift linkage arm Outer line on MLPS must line up with inner line with shifter in Neutral Picture is 95 model MLPS attachment bolts (2)

Manual Valve Shaft tab fits into manual valve groove EPC Solenoid Picture is 95 model Shift Tab EPC Solenoid Shift Solenoid Pack TCC Solenoid Linkage PinRound Screen

1-2 Piston Reverse Servo 2-3 Piston OD Servo Reverse Servo 1-2 Piston Picture is 95 model Round Screen (earlier models) Linkage Pin Larger screen here on later models Access OD Band here

Debris can get trapped inside valve body Square Screen Manual Valve Check Balls (8) Round check valve

End plug with threaded hole Picture is 95 model Reinforcement Plates – note orientation Earlier models only Extra bolt Separator Plate Manual Valve

Note sequence of parts for each valve This one has 2 valves and 2 clips

Must be spotless!Note sequence of parts for each valve

EPC Solenoid Picture is 95 model Shift linkage Shift linkage retaining nut is partially visible here Picture is 95 model Parking pawl “Rooster comb” Linkage shaft

OD band 2.7” OD servo Stock OD servo return spring Anchor bracket (ea end) Center bolt with nut tack- welded to other side of bracket Valve Body Bolts OD Servo OD servo removal bracket

Drum OD Band Fixed Anchor OD servo tighten loosen Band out of Position No contact Drum OD Band Fixed Anchor OD servo tighten loosen Correct Band Position Contact

Drum OD Band Fixed Anchor Maintaining Band Position Use screwdriver or similar to push/keep band into proper position while servo is removed push Separator plate top gasket Picture is 95 model

Filter Wire Harness TCC Solenoid Shift Solenoids EPC Solenoid Temp Sensor Picture is 95 model Valve Body Filter (note extension for later model deeper pan) TCC Solenoid Shift Solenoids Plastic Harness Picture is 02 model Manual Valve

Transmission filer o-ring needs to be removed TCC Solenoid Shift Solenoids Shift linkage fits into manual valve Picture is 02 model Plastic harness

Valve body bolt retains shift solenoid bracket Shift Solenoids Picture is 02 model Use small screwdriver to gently pry out retaining tabs on harness Picture is 02 model Plastic harness

Sonnax upgrade parts Picture is 02 model Sonnax upgrade Pressure regulator valve

Picture is 02 model Sonnax K upgrade OD servo regulator valve & sleeve Picture is 02 model TCC Solenoid Shift Solenoids 8mm valve body bolt retains shift solenoid bracket Valve body cover plate 10mm bolt retains both brackets Manual valve

Picture is 02 model OD Servo OD band can be seen here – this is where flat blade object can be used to push against band to retain it when OD servo is removed Picture is 02 model Flat blade bar pushed against OD band to retain it while OD servo is removed OD servo removal bracket OD servo

OD Servo Stock (stiffer) OD return spring Hi-perf (softer) OD return spring Picture is 02 model Screen fits up into case here before valve body is installed 1-2 piston/accumulator cover

Molded Rubber OEM gasket Deeper (later model) pan Magnet