Winter Performance of SafeLane Overlays Wilfrid A. Nixon, Ph.D., P.E. University of Iowa Iowa City, IA 52242.

Slides:



Advertisements
Similar presentations
Time Sheet Training Press the F5 Key to view the Presentation. It may be helpful to have a printed copy of this slide presentation for the practice sessions.
Advertisements

1.Why is the moist adiabatic lapse rate lower than the dry- adiabatic lapse rate? Heat is released during condensation. 2.When temperatures are below freezing,
Test Info: 35 questions 20 multiple choice 5 matching 10 short answer
Which table represents a function?
Set Up Instructions Place a question in each spot indicated Place an answer in each spot indicated Remove this slide Save as a powerpoint slide show.
Advanced Piloting Cruise Plot.
Chapter 2 Matter and Change.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Human Performance Improvement Process
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
What gas makes up 78% of our atmosphere?
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Vocabulary Unit A Earth Science Howard Middle School.
1 Learning Touchmath *Graphics taken from
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Negative Numbers What do you understand by this?.
Writing times in digital
Chapter 2 Matter and Change
ACC 3200 Chapter 3: Process Costing Process Costing.
Loading and Unloading Students
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
Break Time Remaining 10:00.
This module: Telling the time
Helping to Save Lives and Protect Infrastructure.
THE WATER CYCLE By OWH.
Thermal Mapping for MDSS Leon Shneider and Andy McDonald Vaisala Road Weather Systems.
ABC Technology Project
Data Distributions Warm Up Lesson Presentation Lesson Quiz
VOORBLAD.
Snow, Sleet, Freezing Rain.  To make snow, the temperature must be below freezing the entire path until at the surface.  Once snow melts as it is falling,
Chapter 2 Energy and Matter
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Winter Storm Scenario Tabletop Exercise (TTX) January 10th, 2013
Chapter Six Study Guide.
Chapter 5 Test Review Sections 5-1 through 5-4.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Automotive Technology
Types of clocks. Types of clocks Sand clock or Hourglass clock.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
PSSA Preparation.
Click the red dot …..to begin.. If this is your first time, click..the red dot. If this is not..your first time, click the blue dot.
1 DIGITAL INTERACTIVE MEDIA Wednesday, October 28, 2009.
Unit 5D: Changing State. Changing State Unit 5D: Changing State: Vocabulary Unit 5D: Changing State Some useful words Evaporation Condensation Boiling.
1 Chapter 2Energy and Matter 2.6 Changes of State Copyright © 2005 by Pearson Education, Inc. Publishing as Benjamin Cummings.
Snowstorms of the Pacific Northwest Lowlands Cliff Mass University of Washington January 21, 2009.
Rain Sleet Snow Hail Types of Precipitation. Precipitation Starts With Different Air Masses Being Pushed Around by Global Winds High pressured air mass.
Roadtech 10/23/2013 Snow and Ice Operations 2013 Focus on Efficiency !
Public Works Overview of Winter Salt Usage. Our Equipment The City of Mankato's Public Works Department plows 432 lane miles and uses an average of 2,400.
Presentation transcript:

Winter Performance of SafeLane Overlays Wilfrid A. Nixon, Ph.D., P.E. University of Iowa Iowa City, IA 52242

Overview Introduction Where was the overlay tested? What did the tests involve? What were the results? What do they say about how the overlay performs in winter conditions? What questions do you have?

What is the SafeLane Overlay It uses a special aggregate system This allows it to soak up anti-icing chemicals This keeps the chemicals around longer

Where was the Overlay Tested? Original test began in 2003 Wolf River Bridge, Crandon, Wisconsin Showed good results Extended tests to eight other sites for the winter

Site Locations Texas, Ohio, Virginia (2 sites), Indiana, New York (2 sites), and Wisconsin (2 sites) Included seven bridges, one exit ramp (Ohio), and one on-ramp (Blatnick Bridge Wisconsin) Of the six bridges treated in , five had only one side treated, for comparison

What was involved in the Tests? First, do no harm Collect data about any issues arising with application of chemicals to the overlays –In particular, was any slickness seen? Also gather data about treatments, and any observations on performance of the overlays Where available, compare accident data

What were the results? Different amounts of data at each site In some cases, primarily anecdotal In other cases, significant data available The two New York structures are being separately evaluated by New York DOT For the sake of timeliness, only some of the results are reviewed here

Ironwood Bridge, South Bend, IN Extensive data available for this site –Data sheets –Anecdotal reports In general, information about pavement temperature, weather conditions, and treatments were supplied Both control and test section were treated with salt brine (for anti-icing) or solid salt as needed

Ironwood Anecdotal Information Storm December 1: The bridge westbound (the control section) was slushy and a little slippery. The new bridge eastbound (test section) was just wet. Nothing stuck. We anti-iced Tuesday (two days prior to event). The bridge worked this time. Comments in parentheses have been added to clarify

More Ironwood Anecdotes Storm December 14 A little bit of snow just fell and started to turn things a little snotty. We shot the westbound side (control section) and by the time we were going to shoot the eastbound side (test section) it was already melting off. An additional note indicates a few minutes elapsed between the two treatments

Tabulated Data for Ironwood Data available for four different storms –December 14 –January 23 –February 12 –February 17 In each case info on road and weather conditions, applications of chemicals and test and control surface conditions

December 14 Storm 12 p.m.No snow and Pavement Temperature (PT) = 32º 35 gallons a lane mile of salt brine applied in anti-icing mode Pre-treatment, so no precipitation at this point a.m.Light snow, PT = 26º200 lbs per lane mile of salt Test section clear, control section slushy 12:40 p.m.Freezing rain, PT = 29º 200 lbs per lane mile on control section only Control section had ice, test section was wet 1:40 p.m.Freezing rain and snow, PT = 30º 250 lbs per lane mile on control, 230 on test No report 3:15 p.m.Freezing rain, PT = 31º 200 lbs per lane mile on both Control section had ice, test section was wet 4:05 p.m.Freezing rain, PT = 29º 200 lbs on control section only No report on control section, test section still wet 5:25 p.m.Freezing rain, PT = 29º 250 lbs per lane mile on control section, 230 on test Control section had only wheeltracks bare, test section still wet. 250 lbs per lane mile on control section, 230 on test Control section had only wheeltracks bare, test section still wet.

January 24 Storm 9:00 a.m. No snow, PT = 30º Anti-icing at 40 gallons per lane mile Snow and frost were in the forecast 9:00 a.m. Light snow, PT = 30º 200 lbs per lane mile of salt on control section Control section was snow covered prior to treatment, test section did not need treatment

February 12 Storm 9:00 a.m.No snow, PT = 21ºAnti-icing at 40 gallons per lane mile No report 9:20 a.m.Light snow, PT = 28º200 lbs per lane mile to control section Control section was snow covered prior to treatment, test section did not need treatment 10:30 a.m.Light snow, PT not recorded 200 lbs per lane mile to control section, 100 lbs to test section Control section had snow present prior to spreading, test section was still wet 12:00 p.m.Light snow, PT = 32º200 lbs per lane mile to control section, 100 lbs to test section Control section had snow present prior to spreading, test section was still wet

February 17 Storm 2:00 a.m. Light snow, PT not recorded 220 lbs per lane mile to both sections Both sections had snow prior to treatment – rain in previous days may have removed chemical residual 4:00 a.m. Light snow, PT = 27º 200 lbs per lane mile to control section, none to test section Test section was still clear from prior treatment, control section had icy film prior to this application

Blatnick Bridge, Wisconsin Extensive data also available for this on-ramp Both comments and storm reports from January and February Typical chemical applications in this area are lbs per lane mile of granular salt and 20 gallons per lane mile of Magnesium chloride (anti-icing) Test section charged about every two weeks with 15 gallons per lane mile of mag. chloride

Blatnick Summary Comment The area where the SafeLane was applied holds the chemical longer and when it does become snow covered it seems to still have more traction than the surrounding area. Jeffrey Hall, Minnesota DOT

Blatnick Data January 4:00 a.m.No precipitation, pavement temperature (PT) = 31º 21 gallons per lane mile, liquid, anti-icing Both were clear and dry 4:00 a.m.No precipitation, PT = 27º 18 gallons per lane mile, liquid, anti-icing Clear and dry 4:00 a.m.No precipitation, PT = 24º 25 gallons per lane mile, liquid, anti-icing No report 11:00 a.m.Freezing rain and sleet, PT = 29º Solid chemicals applied twice, at 200 lbs per lane mile each time Test site was clear and wet, and was not slippery 4:00 a.m.No precipitation, PT = 17º 27 gallons per lane mile, liquid, anti-icing Clear and dry 4:00 a.m.No precipitation, PT = 21º 23 gallons per lane mile, liquid, anti-icing Clear and dry Solid chemicals applied twice, at 200 lbs per lane mile each time Test site was clear and wet, and was not slippery

Blatnick Data February 8:00 a.m.Wet, heavy snow, about 2-4 inches, PT =18º 3 applications of solid chemicals at 200 lbs per lane mile each time Slush present on test site, but it remained clear longer than control site. 7:30 a.m.Snow, air temperature = 22º 2 applications of solid chemicals at 400 lbs per lane mile each time Slush present on both test and control site. No differences between the two were noted 7:00 p.m.Normal snow, PT = 17º1 application of solid chemicals at 200 lbs per lane mile Test site was clear and wet. Accumulation of snow on test site was delayed in comparison to control 6:00 p.m.Wet snow, 1-3 inches, PT =20º 1 application of solid chemicals at 200 lbs per lane mile (pre-wet) Test site was clear and wet. Able to be kept that way with less chemical than control sections. 5:45 p.m.Snow, 1-2 inches, PT= 27º 1 application of solid chemicals at 200 lbs per lane mile (pre-wet) Test site clear and wet, and holding longer than control sections.

Crandon, Wisconsin Information SafeLane overlay in place for three winters now (installed in Summer 2003) Data primarily anecdotal Also some safety data

Crandon General Comments Since SafeLane installed, a single application of 8-10 gallons of liquid has been effective for up to two to three weeks (depending on intervening weather) in contrast to prior to installation, where frost was a constant problem

Crandon Safety Prior to installation, 3 to 4 winter related accidents on the bridge each year Since SafeLane installed, no winter related accidents have occurred Also no early morning phone calls from local law enforcement saying the bridge is icy and requiring overtime to fix

Crandon Quote When the sun went down in the winter, the bridge used to freeze up – it just doesnt do that anymore. It just does its job real well. Ron Cole, Forest County Highway Department

Implications of These Results Lots of data, what do they all mean? Look at each of the implications, and talk about their impact

First Implication No problems with application of liquids to SafeLane Some concern that chemical slickness might occur, especially if liquids applied at warmer temperatures For liquids applied in (salt brine and magnesium chloride brine) no problems of that nature

Second Implication Number of instances where the SafeLane section had no snow and/or ice, while the control section did have snow or ice Documented not only for snowfall, but also for ice (Texas) and freezing rain (Indiana)

Third Implication Sometimes, snow or ice will accumulate no matter what When that happened, the SafeLane sections could be kept clear with reduced chemical applications (compared to control) Reduced applications often worked better on SafeLane sections than full applications on control sections

A Closer Look at the Last Two! Clear that the SafeLane treated sections maintained mobility better than control sections (mobility is a primary goal) Example: 11 in-storm treatments at Ironwood, SafeLane section was clear for 10 of the 11 treatments. Control section had snow, slush or ice present 10 of 11 times

More on Ironwood Not only was the SafeLane treated section clear most of the time, it was clear with a reduced level of chemical application SafeLane section had total applications at a rate of 1,260 lbs/LM compared with 2,520 lbs/LM on the control section Significant reduction in chemical needs

Fourth Implication Apart from Crandon, only one years testing, but… Improved performance of the SafeLane treated sections appears to translate into a safety benefit Obviously a full blown safety study would need many years of data

Safety Summary Texas: - no accidents on SafeLane section during an ice storm, when rest of highway had many accidents (including control section) Blatnick: - no accidents this winter, compared with about 20 over previous 4 years

More Safety Ohio Interstate exit: - fewer slide off accidents than in previous years (49 over the past two years) Crandon, Wisconsin: - reduced from 3 or 4 accidents a year prior to treatment with SafeLane to no winter accidents since SafeLane installed

Summary On the basis of the results from the winter, the SafeLane overlay provides benefits in both safety and mobility under winter storm conditions, and those benefits may be attained with less chemical than without the overlay.

Questions? Report is available at: