TurnKey Project Management Services Capabilities Briefing.

Slides:



Advertisements
Similar presentations
ETHICS AS CULTURE KEY ELEMENTS Stage One (primary) – Key Elements of a Culture of Ethics Appoint an ethics program manager to oversee your ethics-related.
Advertisements

Managing the Health and Safety of Contractors
Site Safety Plans PFN ME 35B.
ABOUT US National Expedited Parcel Distribution National Expedited Parcel Distribution.
Radiopharmaceutical Production
[Organisation’s Title] Environmental Management System
A Blueprint For Clinical Research: Standard Operating Procedures
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
MODULE 1 Introduction to OSHA and DOT Training.
Contractor Safety Management
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
Contractor Management and ISO 14001:2004
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Incident Command System Basic Course
Safety and Health Programs
INTERNAL CONTROLS. Session Objectives Understand why an organization should have internal controls Understand the key components of internal controls.
Safety and Health Programs
Legal Aspects of Starting a Business Business Management.
WHS Management Plans.
5.2 Personnel Use competent staff Supervise as necessary
PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
BUILD WITH US. ™ Contractors
© 2013 BOS Solutions Ltd. Revised: Mar 15,2013 Version 2 – BOS HSE MSpg. 1 The BOS HSE Management System Brad Whitaker, MSPH, CSP BOS Solutions HSE Director.
Capability Cliff Notes Series PHEP Capability 9—Medical Materiel Management and Distribution What Is It And How Will We Measure It?
EHS Management System Elements
Host Agency Safety Consultation What the law says you must do.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Old Policy – which no one ever seem to have heard of.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Basics of OHSAS Occupational Health & Safety Management System
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
 Journeyman  Management  Specialization  Teaching  Owning a business.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
The University of North Carolina General Administration Export Control Management Plan Development and Implementation July 24, 2007.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
1 DPCP Internal Auditor Basic Training Internal Audit Procedures.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
2011 AMC INSTITUTE COMMUNITY CONFERENCE “ACCREDITATION - IT’S ALL ABOUT BEST PRACTICES” Suzanne C. Pine, CAE AMC – National Accounts, PCVB AMCI Accreditation.
AIRTANKER BASE MANAGER (ATBM).
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Project Management Process Transition & Closure Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Soil Excavation and Concrete Penetration Permitting Process at LLNL Dennis Chew Plant Engineering Department September, 2006 UCRL-PRES This work.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
MNM Fatal Powered Haulage Powered Haulage August 18, 2004 (Missouri) August 18, 2004 (Missouri) Cement Operation Cement Operation Deck Hand Helper.
Capability Cliff Notes Series PHEP Capability 9—Medical Materiel Management and Distribution What Is It And How Will We Measure It?
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Written Hazard Communication Program What are the requirements.
Lincoln Trail District Health Department Strategic Plan Our Foundation Strategic Goals & Objectives Measures of Success Mission: The Lincoln Trail District.
Project Specific Safe Work Plan Team Engagement Starts HERE!
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
SchedulingProducingControllingSchedulingProducingControlling.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
OWNER BY MFG OUTPUTS Incoming Supplier Quality Audits ( Supplier feedback System) Continuous Improvement plans Yields Cycle Time Problems solving as needed.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
Safety Accountabilities
Prevention through planning, control and monitoring Harold Chinogurei
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
EMS Development Course for Government Agencies
Radiopharmaceutical Production
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

TurnKey Project Management Services Capabilities Briefing

TurnKey’s Mission TurnKey is committed to satisfying our customers through the efficient design, delivery and support of communications networks nationwide. TurnKey is committed to providing effective program management of all aspects of outside plant design, construction, splicing and testing.

The Services We Provide Route development Site Development Detailed outside plant design Permitting and right-of-way Construction Materials management Complete program management

Route Development Provide feasibility studies and conduct route development With client concurrence, incorporate TurnKey’s established methods, procedures and documentation Route Development Checklist Route Development Procedures, Guidelines and Task Descriptions Route Development Tracking Form

Site Development Site Acquisition Site Inspections ( construct ability, grounding potential, zoning, title research ) Site Approvals Site Design Permitting ( submitting and expediting ) Structure Design Purchase structures, appliances and fixtures Site Construction As-built drawings

Detailed OSP Design Complete all outside plant design work and documentation Ensure implementation of client standards & specifications With client concurrence, incorporate TurnKey’s established methods, procedures and documentation

Permitting and Right-of-Way Provide permitting and right-of-way acquisition With client concurrence, incorporate TurnKey’s established methods, procedures and documentation Permitting Procedures & Guidelines Right-of-Way Status Report Permit Agency Contact Form Permit Tracking Form

Construction Performance of all construction, splicing and test With client concurrence, incorporate TurnKey’s established methods, procedures and documentation Change In Plan Form As-built Procedures Utility Coordination Procedures

Material Management Manage material ordering Receive materials Perform inventory control Provide real-time inventory status Stage/consolidate “just-in-time” shipping Track shipments

Project & Program Management Direct supervision of the entire project Perform project planning, tracking, coordination and reporting Project reporting Project schedule & weekly updates Jeopardy reports (as required) Key personnel contact list Manage project documentation, including original permits and right-of- way documents

Safety Policy TurnKey is dedicated to: providing our employees with safe and healthy working environments providing the equipment, materials and training required for the safe completion of assigned tasks ensuring the same commitment to safety from contractors and suppliers strict compliance with federal regulations such as OSHA (1970)