Tara Plastics Business Process Planning Workshop Tara Plastics Business Process Planning Workshop Presented by: The Georgia Tech Center for Manufacturing.

Slides:



Advertisements
Similar presentations
Topic: Sales Tax and 1099 Reporting
Advertisements

EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
19-20 November, 2008 | Copenhagen. Christian Rytt & Thomas Jensen Program Managers Microsoft Corporation NAV08.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Improving Your Business Processes Process Improvement = Profit and Growth Management Software Solutions We help businesses manage for success Cleveland.
ECOMMERCE TECHNOLOGY SUMMER 2003 COPYRIGHT © 2003 MICHAEL I. SHAMOS eCommerce Technology ERP Systems.
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
Introduction SAP Material Planning Dr. Djamal Ziani King Saud University.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 6 Production and Operation Information System Ir. Ekananta.
High Lights of SAP Business One for Manufacturing.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
Production Logistics and ERP
David Warne Independent Manufacturing Consultant.
Material Requirement Planning (MRP)
Production Concepts. Let’s assume we are a manufacturer of bicycles What do we need to make a bicycle?
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Business Process Overview IE 450 Enterprise Perspective of Manufacturing System.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Introduction to Materials Management
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 12a Resource Requirements Planning: MRP and CRP.
Lecture Outline 5 Manufacturing Systems (Production and Operations Management) p. 304+
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Materials Requirements Planning Chapter 16.
The sales order and purchasing processes MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Presented by D’Sunte Wilson Microsoft Dynamics Nav (Navision) Training – Day 2.
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk E2-201 Information Systems.
Aggregate Planning and Resource Planning Chapters 13 and 14.
ERP per definition Enterprise Resource Planning From Wikipedia, the free encyclopedia Enterprise Resource Planning systems (ERPs) integrate (or attempt.
Production Planning and Control
1 Slides used in class may be different from slides in student pack Managerial Briefing 13 Enterprise Resource Planning Systems  Enterprise Resource Planning.
Checking Inventory. Fax IBM PC Mac II PC & Mac Mainframe (UVX 2000) Manual labor Mainframe, Pencil.
Enterprise Resource planning. Example Imagine that you organize a party by next month to celebrate your birthday, and analyze the things you do for that.
BUAD306 MRP.
Material Requirements Planning Chapter 2. MRP in MPC.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Production Planning Master Data EGN 5620 Enterprise Systems Configuration Fall, 2015.
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
TYPES OF DATA IN SAP There are 3 main types of data in SAP arranged in evolutionary aspects Configuration data( Client,Plant etc) Master data (Material,
Accounting Guru Cloud ERP (Enterprise Resource Planning) ERP Software https:
SAP SCM: ERP Procurement certification course in online training Online | classroom| Corporate Training | certifications | placements| support CONTACT.
An Integrated Planning System in Excel A webinar by Production-Scheduling.com.
PP/MM Module User Training SAP 教材. Overview Organization and Business Process.
DEVRY BSOP 330 W EEK 5 Q UIZ Check this A+ tutorial guideline at 1.Question :(TCO 9,
Master Production Scheduling (MPS)
Wholesale Distributors Campaign Briefing
FDFPLSCP4A Manage and schedule production
Facility Inventory Old Facilities Modern Facilities Classroom Size
SAP SCM ONLINE TRAINING
Dynamics GP Manufacturing
BUAD306 MRP/ERP.
Common Learning Blocks
Andrew Good, Liberty Grove Software
The Production Process
Material Requirement Planning (MRP)
Tour - session 2 Bills of materials
Material Requirement Planning (MRP)
Distribution System.
SAP Fulfillment EIN 5346, Logistics Engineering Spring 2010
SAP Master Data & Routing EIN 5346, Logistics Engineering Spring 2010
Tour - session 3 Calendars, Work Centers and Routings
Chapter 14 Dependent Demand
Set Up For Success : Reviewing Manufacturing Best Practices
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Tara Plastics Business Process Planning Workshop Tara Plastics Business Process Planning Workshop Presented by: The Georgia Tech Center for Manufacturing Information Technology Course Instructors: Greg Holland Tarun Kataria Mackenzie Stevenson

Workshop Objectives Identify issues, tasks, and business and software requirements for future system implementation Review best practices and begin business and system process definition Define how you want to run your company and what tools you’ll need to do it

TEAM Process Chart Shipping / Receiving Master Scheduling Capacity Planning Shop Orders Shop Floor & Inventory Control Customer Master Vendor Master Company Master Warehouse Master Location Master Item Master Operation Master Product Config. Master Work Center Master Shop Calendar Customer Order Entry Peachtree ® Accountin g Finite Schedule MRP Sales Tax Codes Chart of Accounts A/R A/P Material Planning Purchasing TEAM Database

Bill / Route Structure

MAKE TO STOCK Ô Stock end items & fill orders from stock Ô Limited number of end items Ô Forecast MAKE TO ORDER Ô Produce subs, components, & end items on receipt of order Ô Combination of standard and custom subs/components Ô Customer orders ASSEMBLE TO ORDER Ô Stock subs/components; assemble end items per order Ô Large number of end items Ô Forecast subs/components Ô Customer orders for end items ENGINEER TO ORDER Ô Unique parts/subs/components per order Ô Unlimited number of end items Ô Customer orders Manufacturing Environments

Supermarket Locations Supply Chain Lead Times (Weeks) Customer Lead Times (Weeks) BagExtrudeTreat Blend Purchase Raw Material <1 <4 <7 <9 <17

Routing Describes how an item is manufactured 3 Operations 3 Sequence of operations 3 Work center data (available capacity) 3 Standards (run time, set-up time, move time, queue time) 3 Testing might also be included

Bill of Material End Item A Purchased Part E Subassembly B Purchased Part F Component C Raw Material D Level 0 Level 1 Level 3 Level 2

Bill of Material Raw Materials Purchased components Shipping materials Instructions Manufacturing Subassemblies Semi-finished Items

Sheeting Route BlendTreatPack Roll

Sheeting BOM Extruded Film ResinsAdditivesColors

Wicketed Bag Route BlendTreatPack RollWicket

Wicketed Bag BOM Extruded Film ResinsAdditivesColors Wicketed Bag

Bag - Rolls Route BlendTreatPack RollConvert

Bag – Rolls BOM Extruded Film ResinsAdditivesColors Bags on Roll

Low volume, high variety Functional layout Spaghetti flow Multi-level BOM High WIP High setup / large batches Long lead times MRP Job Shop vs. Flow Job Shop Flow High volume, low variety Cellular layout Continuous flow Flat BOM Low WIP Low setup / small lots Short lead times Kanban

BOM Accuracy For each BOM item verify: 3 Item number 3 Unit of measure 3 Parent quantity 3 Quantity per parent item Audit methods 3 Floor audit 3 Office/factory review 3 Product teardown 3 Variance analysis of issue vs. receipt variance 3 Product cost rollup

Route Accuracy For each route verify: 3 Operations 3 Sequence numbers 3 Work centers 3 Run rate Audit methods 3 Floor audit 3 Office/factory review 3 Variance analysis of actual labor vs. standard 3 Product cost rollup

BOM / Route Accuracy Bill of Material  Audit BOMs (# parent items correct / total # of parent items audited) Route  Audit routings (# correct routings / total # of routings checked)

Master Scheduling

MRP without MPS Extruded Film ResinsAdditivesColors Wicketed Bag

MRP with MPS Extruded Film ResinsAdditivesColors Wicketed Bag

Master Schedule Level End Items Raw Materials Subs/Components Goal: Master schedule at narrowest sensible point

System Planning Horizon System Planning Horizon The greater of… 3 Maximum cumulative lead time from bill of material, or 3 Time needed to make capacity changes for work centers or suppliers

Time Fences Points in time in the planning horizon used to: 3 Define and restrict the degree of allowable changes within the planning horizon 3 Regulate changes to the schedule that may adversely affect:  component lead times  capacity plans  customer deliveries  cost

MPS Change Policy MPS Change Policy Zone A Emergency Changes Zone B Trades Material & Capacity Committed Material & Capacity Planned Today Zone C Adds & Changes Material & Capacity Scheduled Cum. LT Demand Fence 1 Demand Fence 2 Item LT System Planning Horizon Releasable Period

Analyzing Change Requests Has demand really changed? What is the impact on the production plan? Is capacity available? Is material available? What are the costs and risks associated with making the change? What are the costs and risks associated with not making the change?

Material Planning

How To Do It What We Have Done Plan To Do Calculate Material Requirements What We Need To Do & When Materials Required On-Hand Inventory & Open Orders Bill of Material Demand Material Requirements Planning (MRP)

MRP Frequency Advantages: 3 Updates requirements based on most recent demand information 3 Ensures material and capacity are used to meet actual demand Disadvantages: 3 MRP regeneration time 3 Could cause nervousness in the schedule if schedule change policies lax

MRP Dates Due Date 3 Expected receipt date for a shop order or purchase order indicating when it’s available to use. Release Date 3 Planned or scheduled releases determined by subtracting the lead time from the planned or scheduled receipt date Need Date 3 Required date for intended use; in MRP the release date for a parent item determines the need date for the component child item Receipt Date 3 When an order is planned or scheduled to be received usually as a result of a planned or scheduled release

Buffer Types Safety Stock 3 Material buffer exceeding that which is needed to satisfy gross requirements  Used when there is uncertainty about quantity Safety Lead Time 3 Time buffer which requires early release and receipt dates for shop orders and purchase orders  Used when there is uncertainty about timing

Buffer Comparison Safety Stock = 20 units Lead Time = 2 periods Order quantity = 50 units

Buffer Comparison Safety Lead Time = 1 period Lead Time = 2 periods Order quantity = 50 units

Buffer Issues Buffer Size 3 How should I determine the right amount of safety stock and safety lead time? Buffer Location 3 Where do I place buffers to offer the highest protection at the lowest cost? Buffer Conflicts 3 How do I avoid the problem of working on orders to satisfy safety stock or safety lead time requirements instead of actual orders?

Buffer Size Safety Stock Calculation 3 Uncertainty in supply and demand quantity  SS = Zs Z = Value from normal table to match desired service level s = Standard deviation of supply or demand per period  s can be approximated by 1.25 MAD (mean absolute deviation)

Safety Factors

Safety Stock Calculation

Capacity Planning

Capacity Types Demonstrated Capacity 3 Capacity available in the past and expected in the future; based on actual output (standard hours) per week Available Capacity 3 Based on shop calendar and work center setup. Syn. Planned capacity Required Capacity 3 The expected hours from the item routing to process all planned and scheduled requirements in a work center Objective: Balance available capacity with required capacity

Available Capacity Available Capacity = (Loading Time) x (Utilization) x (Efficiency) Loading Time = (available hours) - (scheduled downtime) Utilization = (actual hours run)/(loading time) Efficiency = (standard hours produced)/(actual hours charged)

Infinite vs. Finite Capacity Infinite 3 Resource is loaded without regard to capacity available to perform the work in a given time period Finite 3 Resource is loaded with no more work than it can be expected to complete in a given time period

Infinite Capacity Planning Capacity Planned Capacity open orders planned orders 1357 open orders planned orders Required Capacity 246 Resource Capacity Profile Time Period

Finite Capacity Scheduling (FCS) Creates a realistic production schedule that recognizes and respects resource limits

Capacity Planning Decisions Infinite Capacity 3 Tool: Resource Capacity Profile Finite Capacity 3 Tool: Late Orders Report Adjust schedule and / or capacity to ensure supply meets demand and schedule is realistic

Production Planning

Production Planning Production Planning Process DemandSupply Master Production Schedule What are we going to make? MRP & CRP What do we need to make it? When do we have to have it? Plant Schedule When and where are we going to make it?

Releasable Orders Releasable Orders Shop Orders Lead Time Due Date Demand Fence 1 Today = Release Date Firm Planned Orders Release

Releasable Orders Caveat 1: Don’t release an order before it’s time 3 Orders released before they’re needed…  Use capacity and materials planned for other orders  Cause confusion on the shop floor regarding order priorities  Increase the number of shop orders that need to be rescheduled if the MPS is changed  Increase WIP and FG inventory

Identifying Shortages Caveat 2: Make sure you’re not counting inventory twice in the release process 3 Multiple orders may use the same component  Software summarizes total demand requirements for all releasable orders and compares to on-hand inventory  Demand pegging report identifying the demand from all shop orders for an item  Shortage report identifying allocations greater than on-hand inventory Manual Automatic

Production Control

Production Control Process 1. Shop order release 2. Material issue Removes inventory from issue location and places into WIP 3. Labor entry Hours and quantity posted against shop order route to update hours completed 4. Shop order receipt Receives shop order item into inventory at work center location Material issue occurs for backflush items 5. Inventory transfer

Transaction Reporting Metrics Quantity received vs. quantity ordered Quantity issued vs. quantity required Actual vs. standard operation quantity or hours Purchase order receipts vs. quantity ordered QOH vs. cycle count % of negative location balances Requires feedback and control mechanisms to not only correct the errors, but also prevent them from reoccurring.

Event Monitoring Monitor Exceptions Past due shop orders Past due purchase orders Downtime Material shortages Production delays Buffers Exceeded? No Analyze Adjust Notify Yes

Schedule Performance Metrics 3 % shop orders completed by due date / total shop orders 3 # schedule changes during releasable period 3 Setup costs 3 WIP value

Inventory Control

Controlling Inventory Accuracy For each inventory location area, determine: 3 What transactions need to be reported (issues, receipts, adjustments, transfers) 3 How transactions should be reported (mode) 3 When the transaction should be reported (timing) 3 Who should have authority to move inventory 3 Who should have responsibility for accuracy 3 Who should enter inventory transaction 3 What are the hardware, software, and procedural requirements to support inventory activities

Multi-location Storage Item count by multiple locations is a necessary software tool 3 Random location can provide 40% greater space utilization 3 Supports the need to quickly locate material 3 Set-up a location for any space that material can placed 3 Avoid assigned locations by item

Cycle Counting The systematic counting of parts to: 3 Correct errors 3 Eliminate root causes 3 Maintain inventory accuracy

Cycle Counting Methods 3 Control Group 3 Random Sample 3 ABC Method 3 Process Control The difference in these methods is how the sample is chosen

Measuring Accuracy

Setting Tolerances Tolerances are a function of: 3 Dollar Value 3 Usage 3 Lead Time 3 Handling 3 Criticality 3 Bill of Material Level 3 Combination of the above

Record Accuracy X 100% Total # of Accurate Records Total # of Records Counted Inventory Record Accuracy

Inventory Control Best Practices Capture transactions as soon after the activity is performed as possible Restrict authority for conducting activities and reporting transactions to those with a stake in the accuracy of the data Understand and address the impact of backflush transactions on inventory accuracy Assign locations and enter transactions only to the level of detail required to support business decisions Implement cycle-counting and investigate root causes of inaccuracy