Florida Inland Navigation District: Permitting and Construction of the M-5 Island Offloading & Crossroads Maintenance Dredging and the NA-1 Upland DMMA.

Slides:



Advertisements
Similar presentations
Navigation – Recreation – Wildlife Mitigation Management of Sediment Post-Hurricane – Beneficial Uses of Dredged Material.
Advertisements

Minnesota MPO Summer Workshop August 11, 2008 MIC Harbor Planning.
National Park Service Mission To preserve unimpaired the natural and cultural resources and values of the National Park System for the enjoyment, education,
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District SARASOTA COUNTY – LIDO KEY HURRICANE & STORM DAMAGE REDUCTION PROJECT City of Sarasota.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Community College Workforce Development Center Melfa, Virginia August 16, 2013 “ A Unified Voice.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management Wolf Lake Aquatic Restoration Project.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
Wetlands Important and often unappreciated lands..
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
Environmental Benchmarks Briefing Nancy Gassman Environmental Protection And Growth Management Department Coordinating Council of Broward, Quality of Life.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
Design Phase Coordination and the Regional Environmental Coordinator’s Role.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
Savannah Harbor Expansion Project
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Salton Sea Species Conservation Habitat Workshop June 10, 2010.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Definition of Hydrography
Dredging Engineering: Building & Maintaining Underwater Highways
MUNISPORT LANDFILL Vijay Kumar Rayabharapu. Munisport Landfill (Biscayne Landings) Landfill N N.E. 151st St., Biscayne Blvd ) Florida International University.
Loxahatchee River Watershed Overview 1 st river in Florida designated as a National Wild & Scenic River 1 st river in Florida designated as a National.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Coastal Management Issues and Strategies: State and Municipal
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
JACKSONVILLE ODMDS DESIGNATION M. Rau, J. Seitz, C. Smith, N. Lombardero – ANAMAR Environmental Consulting, Inc. Chris McArthur – USEPA Region 4 P. Griffin,
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
BARRIER ISLANDS TEXAS GULF COAST.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
Julio A. Zyserman, DHI, Solana Beach, California
C HARLOTTE C OUNTY B EACHES & S HORES A DVISORY C OMMITTEE J ANUARY 7, 2016 C HARLOTTE C OUNTY E ROSION C ONTROL P ROJECT U PDATE.
Florida Inland Navigation District: Broward County Deepening Project Dredging Challenges – Permitting the Dredging of the Intracoastal Waterway, Dania.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Sand Dollars Federal Shore Protection Appropriations
Quick Facts about the FL Intracoastal Waterway Florida ICW (Three federal authorizations AIWW, IWW & OWW) Florida ICW (Three federal authorizations AIWW,
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Florida Inland Navigation District (FIND) Capabilities and Potential Assistance for Muck Removal in the Indian River Lagoon (IRL) System.
At approximately four (4) square miles in size, Lake Hopatcong is the largest freshwater body in New Jersey.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
VP1 W Largest vernal pools are visible from this historic 1938 aerial (pre-oil operation)
Strategic shoreline placement from coast to coast
The Florida Inland Navigation District:
Beneficial Use of Dredged Material
Monitoring, evaluation, adaptive management
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Florida Inland Navigation District: Permitting and Construction of the M-5 Island Offloading & Crossroads Maintenance Dredging and the NA-1 Upland DMMA Facility Authored by Lori Brownell, P.E. and John Adams, P.E. Presented by Jim Marino, P.E., D.CE October 2012

Presentation Overview Long-Range Planning Efforts for Florida  General Dredged Material Management Plan  Florida’s Intracoastal Waterway  Florida’s Okeechobee Waterway Permitting Challenges in Florida  M-5 Island Offloading and Crossroads Maintenance Dredging  NA-1 Dredged Material Management Area Construction

Long-Range Planning Efforts for Florida Florida Inland Navigation District (FIND) established in 1927 Shifts in perception occurred in mid-1980s regarding dredging/dredged material management Taylor Engineering became the District Engineer in 1986 Dredged Material Management Plan development guided by  Technical advisory committee  Citizens’ advisory committee 12 county-specific plans Two-phased approach

Florida’s Intracoastal Waterway 404 channel miles within two federally-authorized navigation projects Constructed to present depths 1941 – 1961 Environmentally diverse Multibillion-dollar economic impact  16 tidal entrances  5 deep-water ports 60 placement sites  8 beach  52 confined upland placement sites 31 properties acquired 18 operational 1 final design/permitting 2 under construction

Florida’s Okeechobee Waterway Expanding FIND’s DMMP  1996 and 2005 legislation added 98 channel miles (4 segments)  FIND total – 502 channel miles Fundamental differences between ICWW and OWW  Initially authorized and constructed for flood control/water distribution  No history of channel maintenance  Variation in lake levels  Active phosphorus load reduction effort

DMMP Permitting Challenges in Florida DMMP Purpose: Assist the USACE with dredging operations in a manner dictated by economic and engineering considerations, and environmental and socioeconomic constraints Economic and engineering considerations  Dredged Material Placement Areas (DMMAs)  Material locations (shoals)  Material volumes (cubic yards [cy])  Material types (sand, clay, silt) Environmental and socioeconomic constraints  Natural resources  Threatened and endangered species  Cultural resources  Adjacent land use and zoning restrictions

M-5 Island Offloading & Crossroads Maintenance Dredging Economic and engineering considerations  Island dredge material management area  Diverse and challenging wind and wave conditions  Tight beach compliance criteria Environmental and socioeconomic constraints  Adjacent aquatic water preserve  Active least tern and sea turtle nesting areas  Offshore hardbottom  Multiagency coordination – County, FDEP, USACE, NMFS, National Wildlife Refuge  Adjacent land use and zoning restrictions

Repeat Taylor Engineering project  1997 = 625,000 cy at M-SLI A and M-SLI B  ICWW pipeline corridor Fundamental differences  1997 = DMMA construction  2012 = 350,000 cy between R59 and R80  Increased environmental scrutiny  Beach pipeline corridor Crossroads Maintenance Dredging  ICWW and OWW intersection  2 – 3 year dredging cycle  50,000 – 60,000 CY/dredging cycle  M-5 DMMA Placement Project Overview

M-5 capacity: 290,000 cy (4 – 6-yr dredging cycles) Intermodal area challenges  Federal channel  Wind and wave forces  Gabions  Adequate navigation depth  Seagrass  Mangroves M-5 DMMA

Pipeline route  Martin County easement Beach design challenges  St. Lucie Inlet State Park  Hobe Sound National Wildlife Refuge  St. Lucie Aquatic Preserve OFW  Vicinity of hardbottom  Sea turtles Pipeline Corridor

NA-1 Dredged Material Management Area Economic and engineering considerations  Variable subsurface soil conditions  Installation of wick drains  Rigorous seepage and slope stability analyses  Off-site material required for construction Environmental and socioeconomic constraints  Dense natural maritime hammock community  Healthy saltmarsh and freshwater wetland communities  Active planning coordination with FFWC, FWW, adjacent neighbors (Amelia Island Plantation and Fernandina Beach Municipal Airport)

Project Overview

NA-1 Unique Site Challenges Geotechnical conditions  ICWW dredge material placed on the eastern side of the island between 1943 and 1960  Western soils comprise medium to dense clean silty sand (3 – 9 feet below ground surface) underlain by 5 – 10 feet of very soft clayey sand 1960 Aerial Photograph 1943 Aerial Photograph Environmental site conditions  Narrow band of freshwater wetlands located between the eastern and western portion of the island lobes  Centrally located eagle’s nest

Summary of Settlement Analysis Results

DMMA Cross Sections Western DMMA Cross Section Eastern DMMA Cross Section

Summary Long-Range Planning Efforts for Florida  DMMP for ICWW and OWW ongoing since 1986 and 1996  Permitting and construction phases remaining Florida Permitting Improvements  Advance coordination  Active communication  Government-driven streamlined process Contact Information  Jim Marino  Lori Brownell  John Adams