CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL1 Insulation Status for QXF Cables D.R. Dietderich, LBNL LARP-CERN Collaboration meeting April 9, 2013.

Slides:



Advertisements
Similar presentations
Magnesium Diboride Program Hyper Tech Research Inc. Mike Tomsic Magnesium Diboride Workshop April 2003 Research Partners: Ohio State University-LASM National.
Advertisements

0 - 0.
Welcome to Who Wants to be a Millionaire
M3309-F10Week 11.2 FG x + F(x)F(x) G(x)G(x) F(x) + G(x)
First pass study 3 scenarios of possible locations of PSA storage cabinets in the CUORE hut Prepared for
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Conducted and Wireless Media (Part I) School of Business Eastern Illinois University © Abdou Illia, Spring 2014 (February 26, 2014)
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
QXF Quench Protection: issues and plans Giorgio Ambrosio Fermilab QXF Video-meeting August 1, 2013 The HiLumi LHC Design Study is included in the High.
QXF Magnetization VERY preliminary analysis Susana Izquierdo Bermudez 07/05/2013.
QXF Cable, 1 st generation Giorgio Ambrosio, Paolo Ferracin Fermilab CERN QXF Video-meeting June 18, 2013 The HiLumi LHC Design Study is included in the.
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Test B, 100 Subtraction Facts
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Design optimization of the protection heaters for the LARP high-field Nb 3 Sn quadrupoles M. Marchevsky, D. W. Cheng, H. Felice, G. Sabbi, Lawrence Berkeley.
RRP & PIT Deformation & RRR Comparison: M. Brown, C. Tarantini, W. Starch, W. Oates, P.J. Lee, D.C. Larbalestier ASC – NHMFL – FSU M2OrA – 05 06/30/15.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
F. Borgnolutti January 17 th 2013 Proposal for a winding test procedure for qualifying the QXF cable.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
Qualification Plans for new Insulation Sources Daniel Dietderich.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
Bi-2212 cable transverse pressure tests in Twente A. Godeke, J. Jiang, E.E. Hellstrom, D.C. Larbalestier – MS&T & ASC – NHMFL - FSU L.D. Cooley, T. Shen.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
QXF cable insulation at CERN Paolo Ferracin, Jorge Munoz Garcia, Laura Garcia Fajardo, Jacky Mazet Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Cable with Annealed Wire D.R. Dietderich QXF Working Group Video Meeting, Feb. 12, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXF Design and Conductor Requirements
HQ Coil 19 Test Impregnation
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Mechanical stability and QXF coil winding
How to Identify a Bolt.
Presentation transcript:

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL1 Insulation Status for QXF Cables D.R. Dietderich, LBNL LARP-CERN Collaboration meeting April 9, 2013 bnl – fnal – lbnl – slac US LHC Accelerator Research Program

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL2 Outline Status of QXF R&D –Target Thicknesses mm or mm per side HQ/LHQ insulation R&D experience –HQ/LHQ Target thickness mm per side

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL3 NEW QXF Insulation R&D New England Wire (NEW) Target thickness mm per side AGY S2-glass fibers (66 tex) with 933 silane sizing 2 ply fibers twisted with a pitch length of 3”. 48 carriers Braided has 15.4 P/I

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL4 Braid Thickness Reference pressure is 1,000 ksi ~18.2 P/I to obtain mm ~12.4 P/I to obtain mm R&D Results

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL5 New England Wire Braid on QXF Cable Flat-bed scanner image of three cables

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL6 Insulation 14.1 P/I Grey-scale image of the selected area

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL7 Number of pixel: Number of white pixel (threshold 170): (94.67%) Number of black pixel: (5.33%)

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL8

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL9 Summary and Plans Have mm thickness 2 ply braid may produce insulation with target thickness of mm and mm with either 12.4 P/I (picks per inch) or 18.3 P/I, respectively Do not plan to make any new R&D runs for 2 to 3 months Going to focus on QXF cable R&D