RH Requirement for BART  §308 (e) contains BART requirements for regional haze visibility impairment…. The State must submit an implementation plan containing.

Slides:



Advertisements
Similar presentations
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
Advertisements

New Source Review NSR Reforms Oklahoma Department of Environmental Quality Air Quality Council Presented by Matt Paque, Attorney, ODEQ - AQD April 20,
NETTING Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013 NETTING.
New Source Review (NSR) Program Basics
Clean Air Interstate Rule (CAIR) CAIR Requirements for SIPs Office of Air and Radiation March 2005.
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Richard (Rick) Goertz, P. E
KEEA Conference October 2013 Carbon Pollution Standards for Power Plants under Section 111 of the CAA: How Energy Efficiency Can Help States Comply 1 Jackson.
Regional Haze Update & Current Results Michele Notarianni Brenda Johnson EPA Region 4.
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
1 Year in Review: Clean Air Act Presented by: Tom Wood Stoel Rives LLP October 8, 2010 Things Are Getting Really Complicated.
December 4, Utility MACT Air & Waste Management Association/EPA Information Exchange December 4, 2002 William H. Maxwell Combustion Group/ESD.
ACC Open Meeting – November 18, 2010 Four Corners Power Plant 1.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
The Impact of Greenhouse Gas Regulation on Energy Production: Legal Framework for Greenhouse Gases Standards for Fossil-Fuel Fired Electric Generating.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
UTILITY NSR REFORM TIMEFRAMES EARLY 90’SBEGIN CAAA IMPLEMENTATION MID 90’SNSR REFORM DEVELOPMENT - S/A Principles - EPA Proposals.
The Western Regional Air Partnership (WRAP) WRAP formed in 1997 as the successor organization to Grand Canyon Visibility Transport Commission (GCVTC) –
Final Amendments to the Regional Haze Rule: BART Rule Making June 16, 2005.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2010.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Regional Haze Rule Best Available Retrofit Technology Government to Government Consultation Navajo Nation Environmental Protection Agency.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
BART Guideline Overview WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
REGIONAL HAZE BART – Key Issues For Consideration Eric Massey, Arizona DEQ Lee Alter, WGA SSJF Meeting June 3, 2004 Denver, Colorado.
1 Colorado BART APCD. 2 Class 1 Areas National Parks and Wilderness Areas 12 in Colorado 4 National Parks 8 Wilderness Areas.
Regional Haze SIP Development Overview AQCC Presentation July 2005.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Proposed Reasonable Progress Rule Workshop Brief Background and Procedure Public Workshop June 14, 2007.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
WESTAR 2003 Fall Technical Conference on PSD Increment Tracking & Cumulative Effects Modeling Seattle, Washington Conducting Class I Area Increment Analyses.
Regional Modeling for Stationary Source Control Strategy Evaluation WESTAR Conference on BART Guidelines and Trading September 1, 2005 Tom Moore -
Status of BART Analyses Implementation Workgroup Meeting April 17, 2007.
1 Conducting Reasonable Progress Determinations under the Regional Haze Rule Kathy Kaufman EPA Office of Air Quality Planning and Standards January 11,
Navajo Nation Interest’s In EPA Rulemakings Affecting EGU’s National Tribal Forum May 22-24, 2012 Tulsa, Oklahoma Anoop Sukumaran, Navajo Nation Environmental.
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005.
Best Available Retrofit Technology (BART) Process November 15, 2006 Eric C. Massey, Manager Air Quality Compliance Section.
BART SIP Development: Example from Colorado Rocky Mountain National Park WRAP IWG Meeting, Denver, CO August 29, 2007 Presented by: Ray Mohr and Curt Taipale.
Air Quality Policy Division D P A Q 1 Regional Haze Update WESTAR September 17-19, 2007 EPA Office of Air Quality Planning & Standards.
EPA – Regional Haze Issues IWG Meeting April 17 th Keith Rose and Laurel Dygowski.
Best Available Control Technology/Lowest Achievable Emission Rate Evaluation Sarah Fuchs Air Permits Division Texas Commission on Environmental Quality.
Reproposal of the Regional Haze Rule and BART Guidelines.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
Summary of June 15, 2005 Revisions to RH BART and BART Guidelines.
Emission Trends and SIP Scenarios for SO2 and NOx Patrick Cummins WRAP Meeting December 14, 2005.
BART Status of Other States AK, Bernalillo County, HI ND, SD, OR, WA.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
How Tribes Use Models Part 1 Navajo Nation Environmental Protection Agency.
WESTAR 2003 Fall Technical Conference Introduction to Class I Area Impact Analyses September 16, 2003 John Bunyak National Park Service.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
Overview of WRAP Emissions Projections
A Basis for Control of BART Eligible Sources
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005
BART Overview Lee Alter Western Governors’ Association
Major New Source Review (NSR) Part 2
Status of Regional Haze Rule
Western Regional Haze Planning and
Best Available Control Technology for Greenhouse Gas Emissions Sources
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
WRAP Stationary Sources Forum Meeting November 14-15, 2006
RA BART Overview Deb Wolfe 8/9/2019.
Regional Modeling for Stationary Source Control Strategy Evaluation
Presentation transcript:

RH Requirement for BART  §308 (e) contains BART requirements for regional haze visibility impairment…. The State must submit an implementation plan containing emission limitations representing BART and schedules for compliance with BART for each BART-eligible source that may reasonably be anticipated to cause or contribute to any impairment of visibility in any mandatory Class I Federal area

BART Definition  BART is an emission limitation  §308 (e)(1)(ii)(A) requires that this limitation incorporate: the best system of continuous emission control technology available …… taking into consideration

BART Factors  the control technology available  the costs of compliance  the energy & non-air quality environmental impacts  any pollution control equipment in use at the source  the remaining useful life of the source ….. AND

BART Factors  Under §308 (e)(1)(ii)(B) also requires BART to consider …… the degree of visibility improvement that would be achieved in each mandatory Class I Federal area as a result of the emission reductions achievable from all sources subject to BART located within the region that contribute to visibility impairment in the Class I area

BART Factors  The “degree of visibility improvement” factor is addressed by July 6, 2006 EPA BART “Guidelines” Sources “Subject to BART” are required to determine visibility improvement resulting from their proposed BART implementation plan, through visibility modeling

“Subject to BART”  Late 2005,WY District Engineers identified BART Eligible Sources using the July 6 th Guidelines (250 TPY, constructed in the ’63-’77 window & one of the 26 listed source categories)  WY conducted CALPUFF modeling to determine whether sources “contribute” 0.5 dV of visibility impairment to the nearest Class I area 24 hr average actual emission rate/highest emitting day  Sources that “contribute” are “Subject to BART

Wyoming Companies “Subject to BART”  Coal Power Plants Pacificorp Dave Johnston Plant: U3(230) & U4(360MW) Pacificorp Jim Bridger Plant: Units 1, 2, 3 & 4 (578 MW) Pacificorp Naughton Plant: U1(110), U2(220) U3(360MW) Pacificorp Wyodak Plant: one 360 MW unit Basin Laramie River Plant: Units 1, 2 & 3 (570 MW)  Coal Fired Industrial Boilers FMC GR Trona Plant: 887MM; 334MM Btu/Hr FMC Granger Trona Plant: 358 MM Btu/Hr General Chemical GR Trona Plant: 534 & 880 MM Btu/Hr

Wyoming BART Rule  Emission limits require the Administrator’s authority  To assure this authority is available WY EQC passed a “BART Rule” October 10, 2006  Signed for Agency Adoption October 12 th  Under SOS Review; Expected Final 12/26/06

Wyoming BART Rule  Applicability  Definitions  BART Guidelines  Subject to BART Source Identification  BART Requirements (permit appl & review)  BART Alternatives (Trading)  Monitoring, Recordkeeping & Reporting Requirements

BART Control Analyses  “Subject to BART” letters to the 8 Companies; June 14, 2005 “Not Subject to BART” letters to the other 6 Companies that were BART Eligible, but did not “contribute” to visibility impairment  These 8 must now conduct BART control analyses using the five factors (technology available, costs, energy & non-air impacts, existing pollution control, and remaining useful life of the source  control plans to be completed by December 15, 2005 (appx)  AQ NSR Program will review control proposals for agreement and set emission limits for these sources (similar to BACT)

Presumptive Levels  Provided Modeling Protocol for evaluating degree of visibility improvement from control of “Subject to BART” Sources on October 2, 2006  Previously had advised that selecting Presumptive Limits for SO2 and NOx control eliminated the need for detailed analysis of the 5 BART Factors  Because of expressed EPA concern that there might be some economic benefit or peculiarity associated with specific site applications, WY is now advising that a “minimal” evaluation of all BART factors (1-technology, 2-costs, 3-energy/non-air env. impacts, 4-existing pollution control 5-remaining life) is required