Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 1 “ASSESSMENT AND REPORTING OF ACOUSTIC CLEARANCE SURVEYS.

Slides:



Advertisements
Similar presentations
Engineer Research and Development Center, Alexandria, VA
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Database Design Using the REA Data Model
Philadelphia District
Patch Testing HYPACK 2013.
Megan Kaun San Francisco District (415) US Army Corps of Engineers BUILDING STRONG ® San Francisco District Sediment.
Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
Mammography Industry: Review of Proposed Accessibility Standards U.S. Access Board May 8, 2012 Atlanta, Georgia.
Section Cross Slope District 1 Your logo here.
62 Recommended Draft Policy ARIN Resolve Conflict Between RSA and 8.2 Utilization Requirements.
MOVIE THEATER BUILDING DESIGN OBJECTIVES: The student will learn to construct a building using various architectural elements. The students will work together.
Measuring Sitework, Excavation, and Piling
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Community College Workforce Development Center Melfa, Virginia August 16, 2013 “ A Unified Voice.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
“Use of contour signatures and classification methods to optimize the tool life in metal machining” Enrique Alegrea, Rocío Alaiz-Rodrígueza, Joaquín Barreirob.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Round each number to the level of accuracy given.
IE 355: Quality and Applied Statistics I Short Run SPC
Corps-Dredging Industry Partnership Hydrographic Survey Corps-Dredging Industry Partnership Hydrographic Survey US Army Corps of Engineers ® Anthony Niles.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 24 Slide 1 Critical Systems Validation 1.
Errors in Measurement Muhajir Ab. Rahim
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
Wes Marshall, P.E. University of Connecticut March 2007
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Payback Module 2.2.
Performance Testing What can you achieve with your MB System?
Plan Formulation for Deep Draft Harbors Navigation Measures.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
WELCOME! Public Scoping Meeting for the Proposed Designation of the “LA-3” Ocean Disposal Site July 21, 2003: Peter & Mary Muth Interpretive Center Newport.
Measurement Uncertainty Information in
Presented by: David Beamish DeFelsko Corporation
Equity in School Lunch Pricing Section 205 Indiana Department of Education School and Community Nutrition April 13, 2011.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
The Navigation Surface A New Approach to Multiple Product Creation from Hydrographic Surveys LT Shepard M. Smith, NOAA University of New Hampshire CCOM/JHC.
Natural Work Make detailed plans to reach technical goals, such as development of new products and designs Manage research and development teams that produce.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
Earthwork & Volumes Spec Requirements End Areas End-area Volumes
Pattern Classification All materials in these slides were taken from Pattern Classification (2nd ed) by R. O. Duda, P. E. Hart and D. G. Stork, John Wiley.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
ADVANCED CHANNEL DESIGN (ACD)
David Moser USACE Chief Economist
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Theory of Errors in Observations Chapter 3 (continued)
Section 5 Control Charts. 4 Control Chart Applications Establish state of statistical control Monitor a process and signal when it goes out of control.
Engineering Surveys & KGPS. Outline Problem Example Applications / uses of KGPS Project Example.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Sand Dollars Federal Shore Protection Appropriations
CIVE Engineering Mathematics 2.2 (20 credits) Statistics and Probability Lecture 6 Confidence intervals Confidence intervals for the sample mean.
ADVANCED CHANNEL DESIGN (ACD)
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
What are today’s objectives ?
Accuracy and Precision Measurements Significant Figures (Sig Figs)
Galveston Bay Bottom Ecosystem System Features
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
Warm up Biff the Builder is having trouble with the current house that he is working on. Explain the causes of Biff’s problems.
Site Grading of Terrace
Accuracy and Precision
September 2017 Phillip Godorov Caitlin Farrell
Analysis of the Polish proposal. GRE2016/18
San Dieguito Lagoon Inlet Dynamics and Maintenance
Devil physics The baddest class on campus IB Physics
Network Screening & Diagnosis
Science and Measurement
Publishing Survey Quality – CATZOC on the ENC
Designing Your Performance Task Assessment
United Maintenance and Contracting Company
Presentation transcript:

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 1 “ASSESSMENT AND REPORTING OF ACOUSTIC CLEARANCE SURVEYS IN DEEP-DRAFT NAVIGATION PROJECTS” Presentation Highlights: 1 – Establish Channel Depth 2 – Typical Dredging Section (Current & Proposed) 3 – Criteria for O&M Channel Acceptance 4 – Criteria for Multi-beam Cell Depth 5 – Criteria for Rounding Depths Furnished to the Public 6 – The EC Is Evolving – Comments Are Still Being Accepted Possible Effects of Draft EC xxxx (under review)‏

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 2 1 to 2 ft Establish Channel Depth Usually 0 ft { Justification for advance maintenance should describe historical shoaling rates, frequency of dredging, and cost analysis. DREDGING TOLERANCE 2 ft * How do you establish underkeel clearance? *

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 3 Dredging Tolerance: 1’ Allowable (Paid) OD 1’ Allowable (Non-Paid) OD Current Typical Dredging Section (O&M Dredging) Dredging Limitations: “Contour” Payment for In-Channel OD No Side-slope Dredging BUT Payment for material that sloughs off of side slope No Payment for Side-slope OD

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 4 Unclear Aspects (especially in the SF Bay area): Side-slope Dredging Side-slope Over Depth Non-pay Over Depth Total Volume of Dredged Material (Pay & Non-Pay) New: Survey Uncertainty Tolerance EC xxxx Typical Dredging Section (soft bottom maintenance dredging)

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 5 Required Channel Depth Allowable Over Depth Estimated Survey Tolerance Material falling within the survey uncertainty tolerance window need not be removed. The survey tolerance is defined as the estimated repeatability or reproducibility of the statistical average of multiple acoustic measurements made over a finite area or cell, and at a specific project site using the same or different measurement systems. Criteria for O&M Channel Acceptance * *Since the statistical computations are complex, practical engineering judgment necessitates that an estimated "average survey tolerance" be assigned to specific surveys.

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 6 Depths in a Cell Average Minimum Criteria for Multi-beam Cell Depth San Francisco District Plans to Acquire Multi-beam Survey System in FY09 EC xxxx specifies using Average Cell Depth (minimum depth in a cell shall never be used)

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 7 Required Channel Depth Allowable Over Depth Estimated Survey Tolerance ~ Published Soundings Survey Tolerance >0.5 ft => Round to Nearest 1.0 ft Survey Tolerance ±0.2 ft to ±0.5 ft => Round to Nearest 0.5 ft Criteria for Rounding Depths Furnished to the Public * Nearest 0.5 ft is the highest “accuracy” that can be published. * Better Equipment & Procedures Yields Smaller Survey Tolerance

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 8 1 – Criteria for Channel Acceptance A – Estimated Survey Tolerance (EST >= 0.2 ft)‏ B – High Spots (<= EST) Are Acceptable 2 – Criteria for Multi-beam Cell Depth (use average depth)‏ 3 – Criteria for Rounding Published Depths (± 0.5 ft or ± 1.0 ft)‏ Recognizing the steep learning curves for all things new: 4 – First priority = reduce EST of Government surveys 5 – Next priority = improve survey posting timeline The Engineering Circular is evolving – Comments Are Still Being Accepted Taking Uncertainties into Account Possible Effects of Draft EC xxxx (Summary)‏

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 9 “ASSESSMENT AND REPORTING OF ACOUSTIC CLEARANCE SURVEYS IN DEEP-DRAFT NAVIGATION PROJECTS” The End Final Version of EC xxxx – July 2008 QUESTIONS? Possible Effects of Draft EC xxxx (under review)‏

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 10 Harbor Safety Committee Briefing (12 June 2008) STOP Back Up Slides Follow Corps of Engineers ® San Francisco Engineer District

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 11 Current Data Collection System DGPS for horizontal position Tide Elevations for vertical Heave-Pitch Compensator Without Compensator Weakest Link Suboptimal Performance

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 12 No matter how repeatable our surveys are, we are still just estimating the channel depth. Constant “draft” Correction vs Loading Changes during the Survey Old Sounders in Deep Channels vs New in Shallow Stationary Bar Checking vs Dynamic Surveying 0.1 ft Precision ≠ 0.1 ft Accuracy On-shore Reference Benchmark vs tidal surface gradient errors Effects of sea Roll, Pitch, and Heave Squat Test Conditions vs Operating Velocity and Loading Echo sounding returns are dependent on the frequency of the acoustic pulse, receiver sensitivity settings, and distinct density changes in the subsurface material. Inherent Survey Uncertainties ± 0.9 ft = RMS (95%)‏ Quantitative estimate of acoustic depth measurement accuracy 0.1 ft 0.25 ft 0.1 ft 0.3 ft Error Budget Measurement System Accuracy Velocity Calibration Accuracy Sounder Resolution Draft/Index Accuracy Tide/Stage Correction Accuracy Platform Stability Error Vessel Velocity Error Bottom Reflectivity/Sensitivity

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 13 POS MV 320 GPS-Aided Inertial Navigation System functionality of a GPS receiver, gyrocompass & conventional motion sensor POS (Position and Orientation System) Computer System –controls the IMU and GPS receivers –computes velocity, roll, pitch and true heading –outputs data in the correct format to interface with Hypack Inertial Measurement Unit (IMU)‏ –contains 3 gyroscopes and 3 accelerometers GPS Sub-system –two antennas plus two receiver cards embedded in POS Computer –computes position to 0.02m with optional RTK New Positioning System‏ Heave-Pitch-Roll Compensation Critical for Multibeam Horizontal & Vertical Position Position ± 0.07 foot BETTER: - Draft/Index Accuracy - Vessel Velocity Error - Tide/Stage Correction Accuracy - Platform Stability Error Error Budget : 0.1 ft : 0.25 ft : 0.3 ft

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 14 Standards and Specifications for Acoustic Surveys Contract Specifications Quantity Computation Procedures Selection of Controlling Depths Use of Multi-beam Survey Systems RTK Position and Elevation Control Response Times for Dissemination of Survey Data The devil is in the details ! Other Aspects Covered (Draft EC xxxx)‏