Doc.: IEEE 802.11-11/0810r0 Submission May 2011 Minho Cheong, ETRISlide 1 Selection of Key Requirement Elements for Baseline FR-EM Document Date: 2011-05-12.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0204r2 Submission March 2010 David Halasz, AclaraSlide 1 Comments on Sub 1 GHz license-exempt operation Date: Authors:
Advertisements

Sangsung Choi(ETRI) tv SG4TV Slide 1 May 2011 Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission.
Doc.: IEEE g TG4g - SUN November 2010 Phil Beecher, (PG&E) Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0338r1 Submission March 2012 Hung-Yu Wei, National Taiwan UniversitySlide 1 DeepSleep: Power Saving Mode to Support a Large Number.
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Doc.: IEEE /1392r0 Submission November 12, 2008 De Vegt (Qualcomm)Slide 1 Inputs for a VHT Selection Procedure Date: Authors:
Doc.: IEEE /0410r2 Submission March 2011 Slide 1 Data Transmission Protection on the IEEE ac MU-MIMO Downlink Date: Authors:
Doc.: IEEE /0237r0 Submission February 12, 2009 Rolf de Vegt (Qualcomm)Slide 1 Inputs for a ac Spec Framework Methodology Date:
Updated China's 5GHz Spectrum Regulation
Doc.: IEEE /0953r1 Submission November 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Nov 2009 Date: Authors:
Doc.: IEEE yy/0847r0 Submission Slide 1Leonardo Lanante, Ochi Lab, KIT July 2009 IEEE802.11ac Preamble with Legacy a/n Backward Compatibility.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
0 - 0.
Addition Facts
ZMQS ZMQS
Submission doc.: IEEE /0325r0 March 2012 Slide 1 TIM Enhancement With Group Bits Date: Authors: Zhong-Yi Jin, Nokia.
Wi-Fi interference measurements in Korea (Part II)
Doc.: IEEE /0301r2 Submission March 2011 David Halasz, OakTree WirelessSlide 1 Categories of TGah Use Cases and Straw Polls Date: Authors:
Doc.: IEEE /1515r0 Submission November 2011 Timo Koskela, Renesas Mobile CorporationSlide ah Wi-Fi Offloading Considerations Date:
Doc.: IEEE tvws Submission September 2009 Stanislav Filin et al, NICTSlide 1 Comments to WS coexistence draft PAR Notice: This document.
Doc.: IEEE /1363r0 Submission November 2013 Ron Porat, Broadcom Evaluation Methodology Open Items Date: Authors: Slide 1.
Doc.: IEEE /1062r2 Submission Zhendong Luo, CATR September 2010 RF Feasibility of 120 MHz Channelization for China Date: Authors: Slide.
IEEE ah Requirements Discussion
Doc.: IEEE /0613r0 Submission May 2012 Ron Porat, Broadcom US Channelization Date: Authors: Slide 1.
Doc.: IEEE /1516r0 Submission November 2011 Huai-Rong Shao, et.al. Samsung ElectronicsSlide ah Channelization Proposal for US Date:
November 2003 Tim Wakeley – HP, et al Slide 1 doc.: IEEE r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1550r1 Submission Nov 2011 Zander, I2R SingaporeSlide 1 Extension of AID and TIM to Support 6000 STAs in ah Date:
Doc.: IEEE /1205r1 Submission September 2011 ZTE CorporationSlide 1 Consideration on battery power alarm mechanism for IEEE ah framework.
Doc.: IEEE /0785r0 Submission July 2009 Eldad Perahia, Intel CorporationSlide 1 Investigation of PA Model Sample Rate for TGac Date:
Submission doc.: IEEE /0859r0 July 2014 Hakan Persson, Ericsson ABSlide 1 Proposing a Stadium Scenario Date: Authors:
Submission doc.: IEEE 11-12/0657r1 May 2012 Panasonic Slide 1 Target PER at receiver sensitivity power level for use case 1g Date: Authors:
Doc.: IEEE /0898r2 Submission July 2012 Marc Emmelmann, FOKUSSlide 1 Fast Initial Service Discovery: An enabler for Self-Growing Date:
Doc.: IEEE /222r4 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Doc.: IEEE /1294r0 Submission September 2011 Rolf de Vegt, QualcommSlide 1 Spec Framework Text for.11ah Bandwidth Modes Date: Authors:
ZTE corporation doc.: IEEE /1086r2 September 2012 Submission TIM Compression for No Buffered Unicast Traffic Date: Slide 1 Authors:
Doc.: IEEE /0342r0 SubmissionLiwen Chu Etc.Slide 1 Power Efficient PS Poll Date: Authors: Date: March, 2012.
Doc.: IEEE /0881r0 Submission July 2012 Anna Pantelidou, Renesas Mobile CorporationSlide 1 PS Mode Enhancements with Timing Indication Date:
Doc.: IEEE /1167r0 Submission November 2009 Osama Aboul-Magd (Samsung)Slide 1 TGac Ad Hoc Group Operation and Chair Selection Procedure Date:
Doc.: IEEE /0022r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Discussion on Contention-based Protocol (CBP) Study Group Notice:
Submission doc.: IEEE 11-13/1100r0 September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Progress Review Date: Authors:
Doc.: IEEE COEX-01/010r0 Submission November 2001 Jim Lansford, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group November Plenary.
Doc.: IEEE /0324r0 Submission Slide 1Michelle Gong, Intel March 2010 DL MU MIMO Error Handling and Simulation Results Date: Authors:
Submission doc.: IEEE ai November 2012 Lei Wang, InterDigital CommunicationsSlide 1 Proposals for the FD Frame Capability, Security and.
Doc.: IEEE /1457r0 Submission December 2010 David Halasz, OakTree WirelessSlide 1 Frequency Hopping Review and IEEE ah Date:
Doc.: IEEE /0371r0 Submission March 2012 Ron Porat, Broadcom BF Feedback and Protocol Date: Authors: Slide 1.
Doc.: IEEE /0373r0 Submission March 2012 Ron Porat, Broadcom BF Frame Format Date: Authors: Slide 1.
Doc.: IEEE /0782r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 STA MU-MIMO Group Management Signaling Design Date: Authors:
Doc.: IEEE /1123r0 Submission September 2010 Zhu/Kim et al 1 Date: Authors: [TXOP Sharing for DL MU-MIMO Support]
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
1 IEEE m-09/ Work Plan for IEEE m Standard & IMT-Advanced Submission.
Doc.: IEEE /0606r1 Submission Uplink Channel Access Date: Authors: May 2012 Minyoung Park, Intel Corp.Slide 1.
Doc.: IEEE /1144r1 Submission W.Carney et al (Sony, Ericsson) Slide 1 Simplified Traffic Model Based On Aggregated Network Statistics Date:
Doc.: IEEE /0044r0 Submission Proposed Changes to Simulation Scenario Date: 2015/01/12 Takeshi Itagaki, Sony CorporationSlide 1 Authors: January.
TIM Compression Date: Authors: January 2012 Month Year
Doc.: IEEE /1539r0 Submission Dec Minho Cheong, ETRISlide 1 Beam forming for 11ah Date: Authors:
Doc.: IEEE /0707r0 Submission May 2011 Minyoung Park, Intel Corp.Slide 1 Overview on TGah Specification Framework Development Date:
Doc.: IEEE /0747r1 Submission May 2011 Minho Cheong, ETRISlide 1 Discussion Review of TGah Functional Requirements and Evaluation Methodology.
Doc.: IEEE /0542r0 SubmissionSimone Merlin, QualcommSlide 1 HEW Scenarios and Goals Date: Authors: May 2013.
Discussion on ax functional requirements
Doc.: IEEE 11-14/0660r0 Submission May 2014 Minho Cheong, NEWRACOMSlide ax Timeline Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0341r2 Submission March 2011 MediaTek, Inc Slide 1 Usage Cases for ah Date: Authors:
Requirements Discussion
Raising the PAR Date: Authors: January 2014 January 2014
Raising the PAR Date: Authors: January 2014 January 2014
Usage Cases for ah Date: Authors: March 2011
Presentation transcript:

doc.: IEEE /0810r0 Submission May 2011 Minho Cheong, ETRISlide 1 Selection of Key Requirement Elements for Baseline FR-EM Document Date: Authors:

doc.: IEEE /0810r0 Submission Abstract This submission is for selection of key requirement elements for baseline FR-EM (Functional Requirements and Evaluation Methodology) document. Slide 2Minho Cheong, ETRI May 2011

doc.: IEEE /0810r0 Submission Background As described in 11/0747r2, key requirements needs to be selected by straw polls in the task group to make an initial draft of the FR- EM document. Plan to have straw polls on the potential key requirement elements after all the presentations during this week are done. Straw polls on approach for evaluation methodology is also to be done. This purpose is for preparation to make an baseline FR-EM document. With the use of these straw poll results, I will try to make an initial version of “TGah Functional Requirements and Evaluation Methodology (FR-EM) document” until the upcoming conference call after Palm Springs meeting. April 2011 Minho Cheong, ETRISlide 3

doc.: IEEE /0810r0 Submission Background (2) Meaningful threshold by which key functional requirement elements can be chosen is 75% agreement in TGah group (not counting “Abstain”) It may be also possible to include additional elements in the upcoming F2F meetings if the majority of the task group can agree on those. In the long run, the mature version of that document (FR-EM) with which TGah will try a first official approval may be ready until this Autumn. Minho Cheong, ETRISlide 4 May 2011

doc.: IEEE /0810r0 Submission Meaning of Functional Requirements TGah Functional requirements –These requirements are derived from the document “ wng-900mhz-par-and-5c”. –TGah amendment must address the functional requirements defined in functional requirements document. –As defined in Selection Procedure document(0238r2), TGah functional requirements document also include evaluation methodology (network simulation scenarios) –They are an small set of very essential and key requirements without which we cannot call the amendment TGah. –Each requirement in the FR-EM document had better be described as a normative text without any specific number as possible. Minho Cheong, ETRISlide 5 May 2011

doc.: IEEE /0810r0 Submission Potential Contents of TGah FR-EM Documents Requirements Section –Elements inherited from the TGah PAR document, such as coverage, data rate, WLAN experience, coexistence. –Other essential and key requirements element as a brief normative text, without which we cannot name it TGah. Evaluation Methodology Section (depending on CM) –PHY performance –Comparison criteria –Traffic model –Network simulation scenarios –And so on. Minho Cheong, ETRISlide 6 May 2011

doc.: IEEE /0810r0 Submission Straw polls on Requirements Section As follows: April 2011 Minho Cheong, ETRISlide 7

doc.: IEEE /0810r0 Submission Straw Poll on Minimal Supported Band Do you support adding the following as one of key requirement elements to the requirements section in TGah FR-EM document –US band ( MHz) for TGah minimal supported band –Yes: –No: –Abstain: April 2011 Minho Cheong, ETRISlide 8

doc.: IEEE /0810r0 Submission Straw Poll on Coverage Do you support adding the following as one of key requirement elements to the requirements section in TGah FR-EM document –Coverage up to 1km (as described in the PAR document) –Yes: –No: –Abstain: Minho Cheong, ETRISlide 9 May 2011

doc.: IEEE /0810r0 Submission Straw Poll on Data Rate Do you support adding the following as one of key requirement elements to the requirements section in TGah FR-EM document –Aggregated data rates are supported > 100Kbps (as described in the PAR document) –Yes: –No: –Abstain: Minho Cheong, ETRISlide 10 May 2011

doc.: IEEE /0810r0 Submission Straw Poll on Coexistence Do you support adding the following as one of key requirement elements to the requirements section in TGah FR-EM document –Coexistence with IEEE and IEEE g –Yes: –No: –Abstain: Minho Cheong, ETRISlide 11 May 2011

doc.: IEEE /0810r0 Submission Straw Poll on WLAN User Experience Do you support adding the following as one of key requirement elements to the requirements section in TGah FR-EM document –Maintaining the WLAN user experience for fixed, outdoor, point-multi-point applications –Compatibility with the existing standard and its amendments –Yes: –No: –Abstain: Minho Cheong, ETRISlide 12 May 2011

doc.: IEEE /0810r0 Submission Straw Poll on Number of Associations Do you support adding the following as one of key requirement elements to the requirements section in TGah FR-EM document –Number of associations beyond 2007 for outdoor –Yes: –No: –Abstain: Minho Cheong, ETRISlide 13 May 2011

doc.: IEEE /0810r0 Submission Straw Poll on Power Saving Do you support adding the following as one of key requirement elements to the requirements section in TGah FR-EM document –Efficient power saving feature shall be used –Yes: –No: –Abstain: Minho Cheong, ETRISlide 14 May 2011

doc.: IEEE /0810r0 Submission Straw Poll on Approach for Evaluation Methodology Section As follows: April 2011 Minho Cheong, ETRISlide 15

doc.: IEEE /0810r0 Submission Straw Poll on Approach for Evaluation Methodology Do you support adding the following as a basic set of simulation scenarios (3 scenarios) to the evaluation methodology section in TGah FR-EM document –From Use Case category 1 (sensors and meters) Outdoor (or mixture of indoor/outdoor) with extremely large number of nodes Indoor with moderately large number of nodes –From Use Case category 3 (extended range Wi-Fi) Outdoor with moderately high data rate –Yes: –No: –Abstain: Minho Cheong, ETRISlide 16 May 2011

doc.: IEEE /0810r0 Submission Straw Poll on OBSS Scenario Do you support adding the following as an additional simulation scenarios to the evaluation methodology section in TGah FR-EM document –Overlapped BSS for outdoor services –Yes: –No: –Abstain: Minho Cheong, ETRISlide 17 May 2011

doc.: IEEE /0810r0 Submission Summary This submission is for selection of key requirement elements for baseline FR-EM (Functional Requirements and Evaluation Methodology) document. Minho Cheong, ETRISlide 18 May 2011

doc.: IEEE /0810r0 Submission References ah-discussion-review-of-tgah-functional-requirements- and-evaluation-methodology wng-900mhz-par-and-5c ah-potential-compromise-of-802-TGah-use-case- document ah-proposed-selection-procedure ac-tgac-functional-requirements-and-evaluation- methodology ad-functional-requirements n-functional-requirements ac-proposal-for-tgac-evaluation-methodology s1g-possible-mac-changes n-usage-models Minho Cheong, ETRISlide 19 May 2011