STAND TEST 3MeV AB-PO-PH mars 2007Jean-Pierre ROYER POWER CONVERTERS AB-PO-PH ( Pulsed and High voltage converters) WHERE ARE WE ?

Slides:



Advertisements
Similar presentations
Welcome to Who Wants to be a Millionaire
Advertisements

Technologies for Demand Response: Enabling Efficiency and Prices to Devices Dr. Arshad Mansoor Vice President, Power Delivery & Utilization 2010 National.
1 1  1 =.
Multi Beamlett Extraction Experiments and Sector Magnet Field Investigation.
CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I.
SITOP power Automation and Drives SITOP modular The First Modular Power Supply SITOP - a step ahead.
Towards a Portuguese participation in the ESS project, 29 th Jan. 2010, Lisbon Carlos Martins – IST / CIEEE1 Carlos A. Martins Instituto Superior Técnico.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Diamond Field-Emission Cathodes as High- Brightness Electron Sources Bo Choi, Jonathan Jarvis, and Charles Brau Vanderbilt University.
LINAC 4 Emittance Meter.
FIGURE 6-1 Comparison of: (a) ac waveform: (b) dc waveform; (c) dc variable power supply and battery-sources of dc; (d) function generator-a source.
The CRB Project for MedAustron
High Frequency Distortion in Power Grids due to Electronic Equipment Anders Larsson Luleå University of Technology.
© K.U.Leuven - ESAT/ELECTA Controlling HID lamps by intelligent power electronics Geert Deconinck, Peter Tant K.U.Leuven-ESAT 8 November 2007.
NANOHARD 2007 MF pulsed DC power supplies for PVD processes Milko Angelov Milko Angelov Consulting Co Ltd., Plovdiv, Bulgaria
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
TS01 Klystron Modulator Minh Nguyen May 20, 2014 Beam Voltage Stability Improvements.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Partial Products. Category 1 1 x 3-digit problems.
Practical Considerations for Digital Design
© Power Grid Company profile C ONDENSATOR D OMINIT Power Grid Company profile.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up.
DC Power Sources for the High Power RF Amplifiers By Rolf Wedberg Review ESS Spoke RF Source 11 – 12 December 2012.
Development of Solid State Long Pulse Klystron Modulators
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Power Supply System for DRFS
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
XII-th Collaboration MeetingJan 18, House1 LOI PROGRESS: JANUARY 2008 AT THE HALL 2 Yoshiro Irie, KEK for the LOI/SH collaboration.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
Michał Matusiak Sławomir Wronka
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
Pulsed Magnet Power Supply Feasibility Study
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
The Survey of the Power Supply Reliability at SSRF
Construction and Commissioning of Electronic Test Benches
Power converters for 2GeV injection
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
352MHz Klystron Control for the 3MeV Linac test stand
PS System for DRFS PS System for Diode-type klystrons
WP Coordinaten XFEL RF Operation
Klystron Power Supplies for ILC
Advanced Research Electron Accelerator Laboratory
Presentation transcript:

STAND TEST 3MeV AB-PO-PH mars 2007Jean-Pierre ROYER POWER CONVERTERS AB-PO-PH ( Pulsed and High voltage converters) WHERE ARE WE ?

AB-PO-PH – mars 2007J.P. Royer AB-PO-PH SOURCE H- 1 High Voltage Converter (40kV, 15 mA, dc) 1 High Voltage Converter (65kV, 4 mA, dc) PLCs for converters 40 and 65 kV 1 Screen bias Converter 2 kV, 1A, dc 1 Grid bias Converter 500V, 500mA dc 1 Anode bias Converter (5 kV to 20 kV, 20A pulsed 2msec, I dc 20 mA) LEBT (SOURCE H-) 2 pulsed solenoids converters (1200A, 800 microsec., 2 Hz) 4 « LPSS » for steerer (70V, 10A bipolar, dc) 1 « LPS2 » for bending (50A, 35V, dc) CHOPPER LINE 11 « maxidiscap » for quad (300A, flat top 800microsec, 2 Hz) 2 « LPSS » for steerer (35V, 20A, dc) KLYSTRON MODULATEUR Prototype AB-PO (100kV, 20A, 800 microsec, 2Hz) Indian collaboration (100kV, 20A, 800 microsec, 2Hz) Power converters summary STAND TEST 3MeV

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV SOURCE H- 1 High Voltage Converter (40kV, 10 mA, dc) 1 High Voltage Converter (65kV, 2 mA, dc) Technical Specification For DC High Voltage Power Converters Rated - 40 kV, 10 mA- 65 kV, 2 mA AB-POEDMS No.: DO  FUG, HEINZINGER, TECHNIX  order: TECHNIX 22 kFS ( 40kV 15mA + 65 kV 4 mA) delivery time ~ April 2007 PLC’s for converters 40 and 65 kV

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV SOURCE H- 1 Screen bias Converter 2 kV, 1A, dc  order FUG 6384 Euros (similar LEIR) may Grid bias Converter 500V, 200mA dc  order FUG 3258 Euros (similar LEIR) may Anode bias Converter (5 kV to 20 kV, 20A pulsed 2msec, I dc 20 mA)  order capacitor 46 microf. 26 kV: delivery  specification for “capacitors charging power converter” done and sent for DO (demand offer) FUG, Heinzinger, Technix: answer foreseen end of march, then order and manufacturing, cabling the cabinet at CERN with the different elements.

AB-PO-PH mars 2007J.P. Royer AB-PO-PH LEBT (SOURCE H-) 2 pulsed solenoid converters (1200A, 800 microsec., 2 Hz) STAND TEST 3MeV 2 power converters modified (ex septa EPA-PS) : -No matching transformer -Third harmonic to be modified and adjusted -Active filter must work for 800 microseconds -Modifications and adjustments on regulation loops and electronics.

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV CHOPPER LINE 11 « maxidiscap » for quad (300A, flat top 800microsec, 2 Hz) Market survey and call for tender for consolidation Linac 2 and Stand Test 3 MeV :  Contract placed at OCEM. Delivery of 11 units foreseen for end May 2007  12 kFS / power converter (power and electronics)

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV CHOPPER LINE 11 « maxidiscap » for quad (300A, flat top 800microsec, 2 Hz)

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV Example of current and voltage waveforms delivered by a maxidiscap on a LEIR magnet The flat top will be increase until 800 microsec. voltage current

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV  Maxidiscap E1 to E4 

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV LEBT (SOURCE H-) 4 « LPSS » for steerer (10A bipolar, dc) 1 « LPS2 » for bending (50A, 35V, dc) CHOPPER LINE 2 « LPSS » for steerer (20A, dc)  Power part: Delta power converters ordered and at CERN  Electronic crates and different electronics cards are in progress for manufacturing.

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV  LPSS LPS2 E5 to E6 

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV KLYSTRON MODULATOR 1-Indian collaboration (100kV, 20A, 800 microsec, 2Hz) 2-Prototype AB-PO (100kV, 20A, 800 microsec, 2Hz) It was foreseen to start the stand test 3MeV with the Indian modulator but now, due to the delay, the PO prototype will be installed for operation.

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV MODULATOR PROTOTYPE -The most important parts have been ordered ( ex: capacitors, high voltage pulse transformer, power converters for charging capacitors and for filament heater, H.V. switch, etc…). - Mechanical assembling has begun. - Preliminary tests of components in lab are in progress. Planning: first tests with klystron foreseen

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV Pulsed power converter for Klystron

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV Power converters AB-PO

AB-PO-PH mars 2007J.P. Royer AB-PO-PH STAND TEST 3MeV CONCLUSION for the different power converters: -Team PO/PH responsibility for 27 power converters ( High Voltage, pulsed or DC) -The planning is well followed to respect the general planning STAND TEST 3MeV. -Effort will be necessary to integrate, to test and to commissioning equipments -Permanent effort (mechanical design, manufacturing) for the high voltage pulsed power converter for klystron modulator. -Sometimes conflicts with other business: work for shut down, hardware test for start–up accelerators etc… So we continue to go ahead ……..