PennDOT’s Roundabout Program July 7, 2010 Colleen Brown, Fran Hanney, PennDOT Ed Myers, P.E. Kittelson & Associates, Inc. (410) 347-9610.

Slides:



Advertisements
Similar presentations
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Transportation Impact Analysis Presented By Katy Flynn, P.E. Fehr & Peers February 19, 2008.
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Roundabout Level of Service and Delay and Comparison to Other Intersection Types Roundabout Level of Service and Delay and Comparison to Other Intersection.
Traffic Control Devices Consortium Pooled Fund Study June 2007 Co-Chairs: Scott Wainwright (FHWA) Scott Thorson (Nevada DOT) Technical Liaisons: Thomas.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Great Western Corridor Feasibility Study
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
I-295 Flyover Project Western Henrico County Why is this being built? To improve the flow of traffic on I-64 between Route 288 and I-295 I-64: more than.
Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); K+A Crashes.
Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); K+A Crashes.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
February 2013 Quarterly Luncheon. Platte County Public Works Bridge replacements Improvements to current roadways New roadways to serve growing demand.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Santa Maria River Bridges Widening. Project Location.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Control Schedule Behind the screen. Proactive – Projects & FFS codes anticipated need 2 years from now and next year. Reactive Project & FFS codes needed.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Illinois state line to Madison Dane and Rock County
“ROUNDABOUTS FIRST” POLICY IN NEW YORK STATE What is it and how did it get developed?
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Module 1 A Nationally Emerging Practice Introduction to Roundabouts Roundabouts in the United States.
Odd Fellows Road Interchange and Roadway Improvements Citizen Information Meeting April 15, 2015.
STH 145 Roundabout Presentation Bloom Companies, LLC July 3, 2012.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Connector Ahead Capital SouthEast Connector Project Sheldon/Wilton Community Workshop #3
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Regional Roads Committee
Chapin Town Hall Meeting
District 6 – Safety Applications
Work Zone Safety Review – District 1 - Duluth
IA 122 RECONSTRUCTION PRE-BID MEETING
NDOT HSM Nevda Transportation Conference
Mobility Fund High Impact/Low Cost Projects: Cape Fear RPO
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Active Traffic Alternatives
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
BACKGROUND INFORMATION
Presentation transcript:

PennDOT’s Roundabout Program July 7, 2010 Colleen Brown, Fran Hanney, PennDOT Ed Myers, P.E. Kittelson & Associates, Inc. (410) Peach Bottom (York Co.), PA

Presentation Overview Statewide Roundabout Inventory PennDOT’s Roundabout Guide Case Study: Marshalls Creek Williamsport, PA

Pennsylvania Roundabout Inventory Sources of Information –June 2008 Michael Baker Jr. Inc. report -Determined if circular intersections were modern roundabouts or not -Identified roundabouts in state at that time (all single-lane) –9 existing roundabouts –8 planned roundabouts –Contacted PennDOT District Roundabout Coordinators in Fall 2009 to update this inventory Results –10 existing single-lane roundabouts –1 existing double-lane roundabout –2 roundabouts under construction –10 roundabouts planned –5 roundabouts in alternatives analysis Quakertown, PA Photo: Michael Baker Jr., Inc.

Pennsylvania’s Roundabouts

PennDOT Roundabout Guide PennDOT Guide to Roundabouts (Publication No. 414) published June Based upon Kansas Roundabout Guide (2003) Like KDOT Guide, PennDOT Pub. 414 is intended to supplement FHWA’s Roundabouts: An Informational Guide (2000) Roundabout experience gained in US this decade has been incorporated into state roundabout guides

PennDOT Roundabout Guide Chapters 1 – Introduction 2 – Public Involvement Considerations 3 – Planning 4 – Operation 5 – Roundabout Safety 6 – Geometric Design 7 – Traffic Design 8 – System Considerations Will update when new FHWA Guide is published. Ch. 6 – Geometric Design Ch. 7 – Traffic Design Ch. 4 – Operation

Case Study: Marshalls Creek Bypass Location –Village of Marshalls Creek in Poconos –4 miles north of I-80 and 6 miles east of Stroudsburg –In state’s fastest growing county (Monroe) Need for bypass –Two closely spaced signals at offset T intersections create congestion –Environmental and historic constrains prevent widening in village

Marshalls Creek Bypass: New Intersections Site of north intersection Site of south intersection Photos: Pete Jenior

Marshalls Creek Bypass – Intersection Options Northern Intersection Southern Intersection Old road into village Bypass US 209 Old road into village Bypass US 209

Marshalls Creek Bypass – Intersection Delay Roundabouts will create about 1/3 the delay that traffic signals would

Marshalls Creek Bypass V/C Ratio Roundabouts will have more available capacity to be used when traffic volumes exceed weekday p.m. levels (i.e. holidays)

Marshalls Creek Bypass – Intersection Cost

Marshalls Creek Bypass – Intersection Selection Southern Intersection – Roundabout –Less Delay versus signal –More available capacity for weekend/holiday traffic versus signal –Same cost as signal Northern Intersection – Traffic Signal –More delay versus roundabout –Less available capacity versus roundabout –Lower cost than roundabout –Smaller footprint and fewer impacts than roundabout Contract for entire bypass expected to be let in 2010

Questions? Spring Grove, PA