1 Intensively Monitored Watersheds Validation Monitoring for Salmon Habitat Restoration.

Slides:



Advertisements
Similar presentations
Collaborative, Systemwide Monitoring and Evaluation Program
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advanced Piloting Cruise Plot.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Investigate the Life History of Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Basin Project Brian Jonasson Oregon Department.
Annual Stock Assessment – Coded Wire Tag Program (ODFW & WDFW) BPA Project Numbers: and
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
1 Measuring Progress: Monitoring and Evaluation in WRIA 8 WRIA 8 Salmon Recovery Council November 19, 2009 Scott Stolnack WRIA 8 Technical Coordinator.
and 6.855J Spanning Tree Algorithms. 2 The Greedy Algorithm in Action
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Water Use Planning in British Columbia Campbell River Case Study Flow 2008 Conference October, 2008 San Antonio, TX Dan Ohlson, M.Sc., P.Eng., MCIP.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
CSMEP Goal: Improve the quality and consistency of fish monitoring data, and the methods used to evaluate these data, to answer key questions relevant.
25 seconds left…...
Subtraction: Adding UP
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
Apparent over-winter survival of juvenile coho in three tributaries to the lower Columbia River Trevor Johnson, Mara Zimmerman, Matthew Sturza, Patrick.
Evaluating Fish Response to Habitat Restoration Overview of Intensively Monitored Watershed Research in the PNW Rationale for IMW approach Extent of current.
Linking freshwater habitat to salmonid productivity Watershed Program 1 1. NW Fisheries Science Center 2725 Montlake Blvd. East, Seattle, WA
October 20 & 21, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Lower Columbia Sub-Basin.
Presentation transcript:

1 Intensively Monitored Watersheds Validation Monitoring for Salmon Habitat Restoration

2 Background  Can habitat restoration produce more fish (outmigrants)?  Can we use the information gained to inform and guide restoration efforts? Both require that we know the causal mechanisms affecting production Both require that we know the causal mechanisms affecting production

3 Location of Study Watersheds

4 IMW Concept-Coho Steelhead Complexes Long-term, paired-watershed experiments Long-term, paired-watershed experiments Fish and habitat responses to treatments are conducted at multiple spatial scales from reach to whole watershed Fish and habitat responses to treatments are conducted at multiple spatial scales from reach to whole watershed Coho and steelhead Coho and steelhead Species with at least 1 year of freshwater residency Species with at least 1 year of freshwater residency Often utilize small watersheds for spawning and rearing Often utilize small watersheds for spawning and rearing Treatments can be applied to a large proportion of the watershed Treatments can be applied to a large proportion of the watershed Increased potential to detect a response by the fish Increased potential to detect a response by the fish

5 Design Before-After/Control-Impact Hierarchical monitoring scheme at nested spatial scales Reach scale-effects of specific restoration actions Sub basin scale-effects of multiple restoration actions Basin scale-cumulative effects of all actions

6 Reach Scale Project-specific monitoring to determine effectiveness Example: LWD addition Habitat effects Juvenile abundance Survival to smolting Reference Basin Treatment Basins

7 Sub-basin Scale Look for opportunities to treat entire sub basins within treatment basin. Use reference sub basin within reference basin and possibly within treatment basin. Reference Basin Treatment Basins

8 Basin Scale Most appropriate scale to assess fish population response Ultimate measure of success is downstream migrant (smolt) production Also assess habitat, juvenile (parr) and adult abundance at this scale Reference Basin Treatment Basins

9 Treatments Wood placement Wood placement Off-channel habitat creation Off-channel habitat creation Barrier removal Barrier removal Nutrient augmentation? Nutrient augmentation?  Land use - urbanization Status SJF complex - Habitat treatments completed in 2007 SJF complex - Habitat treatments completed in 2007 Skagit Estuary - Treatments began in 2000 Skagit Estuary - Treatments began in 2000 Hood Canal (L. Anderson Cr.) - Began in 2007 Hood Canal (L. Anderson Cr.) - Began in 2007 L. Columbia - Restoration plan due in 2008 L. Columbia - Restoration plan due in 2008

10 Strait of Juan de Fuca Some Results from Years 1-4 Timing of juvenile fish emigration (West Twin and East Twin) Influence of wood addition on coho survival (West and East Twin)

11

12

% pools Km Km Deep Cr-LWD projects Width:Depth ratio Km Km % pool habitatWidth:Depth

14 East Twin-LWD projects Width:Depth % pool habitat Width:Depth ratio Km Km % pools

15 Coho Emigration from East Twin River

16 Effects on Coho Survival East Twin (Restored) West Twin Fall Migrants15-28%10-13% Survival to Spring6-10%5-10% Overall survival23-31%14-20% Marine survival5% (38 fish)2% (12)

17 Skagit River Delta H w : Restoring estuary habitat increases salmon production (connectivity and capacity)

19 Treatments Skagit Estuary Dike removal/flooding to restore habitat Dike removal/flooding to restore habitat Connectivity-improve access to existing habitat Connectivity-improve access to existing habitat Barrier removal-self regulating tidegates, other infrastructure Barrier removal-self regulating tidegates, other infrastructure Long lead times and complex planning required but hundreds of acres affected. Long lead times and complex planning required but hundreds of acres affected.

20 Deepwater Slough (dike removal) A - Blind Channel Habitat, ,000 10,000 15,000 20,000 25,000 30,000 35,000 MarchAprilMayJuneJuly Wild juvenile Chinook salmon per hectare Reference Treatment B - Blind Channel Habitat, ,000 10,000 15,000 20,000 25,000 30,000 35,000 MarchAprilMayJuneJuly Wild juvenile Chinook salmon per hectare Reference Treatment C - Blind Channel Habitat, ,000 10,000 15,000 20,000 25,000 30,000 35,000 MarchAprilMayJuneJuly Wild juvenile Chinook salmon per hectare Reference Treatment E - Distributary Channel Habitat, ,000 10,000 15,000 20,000 25,000 30,000 35,000 MarAprMayJunJul Wild juvenile Chinook salmon per hectare Reference Treatment F - Distributary Channel Habitat, ,000 10,000 15,000 20,000 25,000 30,000 35,000 MarAprMayJun Wild juvenile Chinook salmon per hectare Reference Treatment D - Distributary Channel Habitat, ,000 10,000 15,000 20,000 25,000 30,000 35,000 MarAprMayJunJul Wild juvenile Chinook salmon per hectare Reference Treatment

21 Fornsby SRT (opened in 2006) SRT

22 Habitat Restoration Passive RestorationActive Restoration

23

24

25

26 Frequent Concerns When will results be available? When will results be available? What magnitude of change can be detected? What magnitude of change can be detected?

27 Coho production Power Analysis Post-restorationPre-restoration

28 Seabeck Cr-Minimum  P

29 Conclusions Well-designed monitoring program can detect relatively small (20-40%) increases in smolt production Well-designed monitoring program can detect relatively small (20-40%) increases in smolt production Understanding why is critical to differentiate between restoration impacts and other factors Understanding why is critical to differentiate between restoration impacts and other factors

30 IMW Program Participants Oversight Committee: Washington Dept. of Ecology - Bill Ehinger Washington Dept. of Ecology - Bill Ehinger Washington Dept. of Fish and Wildlife - Tim Quinn Washington Dept. of Fish and Wildlife - Tim Quinn NOAA Fisheries (NWFSC) - Phil Roni, Correigh Greene NOAA Fisheries (NWFSC) - Phil Roni, Correigh Greene Lower Elwha Klallam Tribe - Mike McHenry Lower Elwha Klallam Tribe - Mike McHenry Skagit River System Coop - Eric Beamer Skagit River System Coop - Eric Beamer Weyerhaeuser - Bob Bilby Weyerhaeuser - Bob Bilby IMW Partners: Lower Columbia Fish Recovery Board - Jeff Breckel Hood Canal Coordinating Council - Richard Brocksmith Salmon Recovery Funding Board