MACAO-VLTI Adaptive Optics

Slides:



Advertisements
Similar presentations
NAOS-CONICA (a.k.a NACO) for the VLT
Advertisements

Optical Tweezing with Adaptive Optics Canada France Germany - Young Photonic Researchers – Munich, 2009 Shaun Bowman Supervisors - Dr. Colin Bradley, Dr.
What is HiCIAO ? Near-infrared high contrast imaging instrument with a linear polarimetor at the 8.2m Subaru telescope. Targets: exoplanets and proto-planetary.
Standard stars for the ZIMPOL polarimeter
The GMT NGS WFS design Presented by S. Esposito. The team L. Fini G. Agapito L. Carbonaro A. Puglisi L. Busoni V. Biliotti A. Riccardi S. Esposito E.
Università di Parma Pisa, Nov. 29, 2005 A. Bononi, 2nd Korea-Italy S&T Forum 1/30 Research at Parma University in Optical Communications and Networks Alberto.
Observation of beam halo with corona graph
The Very Large Telescope Interferometer EuroSummer School Astrometry and Imaging with the Very Large Telescope Interferometer Keszthely, Hungary June.
- Slide 1 OPTICON Optical-Infrared Astronomy for Europe EC Infrastructures press day 7 July 2005 EC Infrastructures press day 7 July 2005 Gerry Gilmore.
Break Time Remaining 10:00.
The basics for simulations
Fast & Furious: a potential wavefront reconstructor for extreme adaptive optics at ELTs Visa Korkiakoski and Christoph U. Keller Leiden Observatory Niek.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
HIGH RESOLUTION & CONTRAST Imaging F. Pedichini. PARSEC: 3.26 ly 1 Pc 3 Pc 1 A.U. 1 arcsec 2 arcsec.
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
ESO, 27 Nov 09 SPHERE – the high contrast challenge Markus Kasper, ESO 1 1.
20 years of AO at ESO MACAO-CRIRES, or how to recycle a good idea.
Clock will move after 1 minute
Select a time to count down from the clock above
Osservatorio di Arcetri Adaptive primary mirrors for ELTs A. Riccardi 1, P. Salinari 1, G. Brusa 1, R. Ragazzoni 1, S. Esposito 1, D. Gallieni 2 and R.
Claire Max UC Santa Cruz January 24, 2013
GLAO Workshop, Leiden; April 26 th 2005 Ground Layer Adaptive Optics, N. Hubin Ground Layer Adaptive Optics Status and strategy at ESO Norbert Hubin European.
1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
Preparing MIDI for science operations on Paranal Markus Schöller Jean-Gabriel Cuby, Sebastien Morel, Andrea Richichi Schloss Ringberg, September 03, 2003.
CHARA AO WFS Design JDM (+LS,MJI) 2012Sep06 v0.1 1.
“Riding the Hub”: The MMT Adaptive Secondary Douglas Miller University of Arizona The AO System Current Performance of the MMT AO System Ongoing Development.
Géraldine Guerri Post-doc CSL
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
GMT Phasing GLAO – not needed LTAO – Phase stabilization done at ~1kHz with edge sensing at M1 and M2 – Phase reference set at ~.01Hz using off-axis star.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO NGS WFS design review Caltech Optical Observatories 31 st March 2010.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
Cophasing activities at Onera
Blue Dot Team « Multi aperture imaging ». BDT sept MAI techniques High accuracy visibility measurement Differential interferometry Nulling.
1 On-sky validation of LIFT on GeMS C. Plantet 1, S. Meimon 1, J.-M. Conan 1, B. Neichel 2, T. Fusco 1 1: ONERA, the French Aerospace Lab, Chatillon, France.
EAGLE Active Optics Components E.Hugot - M.Ferrari Target Acquisition Workshop Paris 11/07/2007.
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry.
Telescope Integration and Tests Tuesday Afternoon.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
AO review meeting, Florence, November FLAO operating Modes Presented by: S. Esposito Osservatorio Astrofisico di Arcetri / INAF.
From NAOS to the future SPHERE Extreme AO system T. Fusco 1, G. Rousset 1,2, J.-L. Beuzit 3, D. Mouillet 3, A.-M. Lagrange 3, P. Puget 2 and many others.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
The VLT Adaptive Optics Facility
Fundamentals of closed loop wave-front control
ATLAS The LTAO module for the E-ELT Thierry Fusco ONERA / DOTA On behalf of the ATLAS consortium Advanced Tomography with Laser for AO systems.
1 High-order coronagraphic phase diversity: demonstration of COFFEE on SPHERE. B.Paul 1,2, J-F Sauvage 1, L. Mugnier 1, K. Dohlen 2, D. Mouillet 3, T.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
The Active Optics System S. Thomas and the AO team.
FLAO_01: FLAO system baseline & goal performance F. Quirós-Pacheco, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
Page 1 Adaptive Optics in the VLT and ELT era Wavefront sensors, correctors François Wildi Observatoire de Genève.
Osservatorio Astronomico di Padova A study of Pyramid WFS behavior under imperfect illumination Valentina Viotto Demetrio Magrin Maria Bergomi Marco Dima.
Pre-focal wave front correction and field stabilization for the E-ELT
The Self-Coherent Camera: a focal plane wavefront sensor for EPICS
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
Charts for TPF-C workshop SNR for Nulling Coronagraph and Post Coron WFS M. Shao 9/28/06.
François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 GSMT AO Simulations.
Date of download: 6/21/2016 Copyright © 2016 SPIE. All rights reserved. AO corrected average Strehl ratios at different field positions and Sun elevations.
Lecture 14 AO System Optimization
Pyramid sensors for AO and co-phasing
Adaptive optics Now: Soon: High angular resolution
Presentation transcript:

MACAO-VLTI Adaptive Optics 4/6/2017 Other Contributors: L. Close, J. Brynnel, J. Farinato, E. Brunetto, S. Stroebele, R. Reiss, E. Marchetti, D. Bonaccini Calia T. Craven-Bartle, M. Comin, T. Phan Duc, Wallanders … R. Arsenault, R. Donaldson, C. Dupuy, E. Fedrigo, M. Kasper, N. Hubin, B. Delabre, S. Oberti, J. Paufique, L. Ivanescu, S. Tordo, S. Rossi, A. Silber, J.-L. Lizon, P. Gigan, M. Quattri 20th AO ESO 27.11.09

MACAO-VLTI: How it started… Challenges… 4/6/2017 MACAO-VLTI: How it started… Challenges… Low cost - reliable – easy to operate AO system Polyvalent: feed VLTI, CRIRES, SPIFFI… Few curvature system in world (IoA Hawaii, CFHT) Believers/Architects: F. Roddier, G. Monnet, F. Rigaut AO Group restructure 1999 Fast track !!! (thanks to team !) (FDR-4th Macao: 4 yrs) Low Maintenance - easy to operate (automatic: guide str mag. & seeing LUT) Understand Curvature system… Detailed simulations & test in Europe Piston Spec. New for AO systems; no real time feedback; open loop process… DM mech. decoupled from WFS DM @ M8 location 5m above WFS !!! Decoupled structure

MACAO-VLTI: Milestones & Requirements 4/6/2017 MACAO-VLTI: Milestones & Requirements Design Reviews: System Deliveries: Strehl Ratio: Piston from DM < : Residual Jitter < 10 mas Off-axis guiding On-line diagnosis Chopping V < 9 50% V = 14.5 35% V = 15.5 10% Concept Des. Rev. Sept. 99 Prelim. Des. Rev. Oct. 00 Final Des. Rev. March 01 2.5 yr ! Tip-Tilt Boxes (2) Nov. 01 MACAO#2 (UT2) Apr. 03 MACAO#3 (UT3) Aug. 03 MACAO#4 (UT4) Aug. 04 MACAO#1 (UT1) Mar. 05 25 nm RMS Window 48 msec 125 nm RMS Window 290 msec 2 mm PV Window 10 min Allowed VLTI to combine UT2-UT3 using tilt corrected beams (STRAP-M2)

MACAO-VLTI: System Characteristics 60 elements Curvature System (vibrating membrane, micro-lenses, Bimorph DM and Tip-Tilt mount) 2.1 kHz drive membrane mirror AO loop controlled @ 420 Hz, (bandwidth ~35 Hz) PowerPC 400 MHz Real Time Computer WaveFrontSensor detector: APD coupled with Opt. Fibers Modular approach (4 VLTI+SINFONI/CRIRES+spares) X-Y Table allows reference source selection off-axis (Strap quadrant detector tip-tilt sensor+) TCCD Electronics: VLTI-RTC-IC LCU’s, XYTab., DM Amplifiers, APD Racks, High Level Eng. GUI + Observing Software

MACAO-VLTI: Deformable Mirror Wavefront Corrector CILAS Bimorphe DM +/- 400 Volt 100 mm pupil (150mm full size) 60 electrodes 40 intra-pupil 20 extra-pupil (tilt) Up to 1.2” seeing Deformable Mirror Tip-Tilt mount

MACAO-VLTI: WaveFront Sensor & APD Cabinet Beam Switching Device (STRAP) TCCD T-mount on XY table APD Cabinet

MACAO-VLTI: Fiber Bundle Heptagon Micro-Lens Microfab Micro-Lens

MACAO-VLTI: Optics WFS Optics Functions Membrane vibration for curvature sensing (2.1 kHz) Beam collimation Pupil enlargment (14  18 mm) Pupil imaging on Lenslet Pupil centering on Lenslet Pupil de-rotation CRITICAL Rotating prism axis Gimball tilt

MACAO-VLTI: Industries Applied Physics Specialties, Ltd. 17 Prince Andrew Place Don Mills, Ontario M3C 2H2 Canada DR. SCHÜTTEN GmbH Dr.-Ing. Rudolf Schütten (Geschäftsführer) Frauenfelderstr. 95 CH-9548 Matzingen Shaktiware

MACAO-VLTI: Lab Tests Optical Table in Lab. 038 Simulated f/47 Coude beam Phase screens & turbulence generator DM in optical beam WFS mounted under opt. table RASOIR IR test camera

MACAO-VLTI: Paranal Installation Five (5) comm. (inclu. TTB) from Dec.’01 to Mar.05 Required >140 man-day/comm, 20 k € /comm transport, 15 k € overtime Shipment/comm: 10 crates, 3 tons, 15 m3, value 1.4 M€ All together ~8 staff monopolized for 1.5 months Preparation: Hand & power tools, handling tools, books, docum., laptops, soft … Lots of constraints before scheduled dates (calibr., scien. op. etc.) Paranal overloaded with operation Limited Paranal prep. before arrival; but outstanding response once there Heavy toll on staff (assume 2wks off after comm. or “low-profile”); one wk – 10 days on sky about limit of exhaustion! Data reduction & Comm. Report prep. and writing not evaluated yet (2-3 wk/staff ?!) + Documentation to provide… The Right stuff!

MACAO-VLTI: Components Location Azimuth Cabinet HVA, TTM elec., capa. RO M8 Well TTM, DM, Capa. FE, DM mask Coude Room WFS box IC/XY Cab. RTC/VLTI Cab. APD Cab. Cooling Coude focus

MACAO-VLTI: Calibrations 4/6/2017 MACAO-VLTI: Calibrations Membrane Mirror Stroke Calibration RoC vs Volt; FOV of WFS for given RoC and Tilt Membrane Mirror Phaselag Calibration Use tilt signal; for which phaselag curv =0; add 180º Interaction Matrices Calibration ~6 matrices for different RoC; interpolation to cover whole range DM Flattening (close loop with low gains; re-iterate) Influence Functions (Piston; laboratory) DM shape+Capa. Sensor (OPD offset); DM non-linearity See paper 5490-100 on Calibrations Oberti, Bonnet, Fedrigo et al. See paper 5490-182 on Piston Ivanescu, Arsenault, Fedrigo et al. Worry about DM far from WFS After install and work in Coude LOTS of turbulence Beginning of night some turbulence Middle of night after good ventilation rock steady !!!

MACAO-VLTI System Description Coude Room View Front: ITC rack, M9 tower, Macao on XY table Back: Elec. Cab, APD rack, FOB, M9 cooling, SCP (For system description see Arsenault et al., 2003, SPIE 4839, p.174) Test Bench & Turbulence Generator

MACAO-VLTI Performance: Results on UT2 HIC59206 V=10Sep. 0.120” Seeing 0.75” 5 x 5 arcsec2 K-band image of "Frosty Leo" obtained in 0.7 arcsec seeing. V~ 11, difficult AO target because 3 arcsec in size at visible wavelengths. The corrected image quality is about FWHM 0.1 arcsec. Open-loop Close-loop 90-second K-band exposure of the central 6 x 13 arcsec2 around the Galactic Center obtained by under average atmospheric conditions (0.8 arcsec seeing). Although the 14.6 magnitude guide star is located roughly 20 arcsec from the field center the present image has a point-source FWHM of about 0.115 arcsec.

MACAO-VLTI: Results UT3 Mars image taken in August 8th 2003 Some ~20 mosaic images in K band Reference source: Deimos WFS offsets (excellent “exercise” for MACAO-VLTI functionalities) (thanks to MKA & STO) Neptune H band image Planet disk used for guiding (f=3”) Smallest features ~0.067”

MACAO-VLTI: Results on UT3 Interferometry Calibrator fringes HD20356 with 2 MACAO’s on UT2-UT3 November ‘03 1st fringes with 2 MACAO’s on UT2-UT3 14.08.03 Flux injected in VINCI fibers (beam combiner) versus MACAO-VLTI main loop gain. Approximately 50 times more flux injected with MACAO than with tip-tilt correction alone.

MACAO-VLTI: Results UT4 Tilt Correction 4/6/2017 MACAO-VLTI: Results UT4 Tilt Correction Nasmyth A/R failed; Exchanged with UT1 Bad Active correction first; MKA wants to correct it all with MACAO !!!

MACAO-VLTI Performance: Strehl Rogue Gallery 4/6/2017 MACAO-VLTI Performance: Strehl Rogue Gallery mv=11.5 Seeing=0.8” Sr(K)=57% texp.= 0.2s mv=8-9 Seeing=0.5” Sr(K)=63% texp.= 0.2s BEST Mv=9.87 Seeing=0.8” Sr(K)=65% texp.= 64s mv=14.5 Seeing=0.6” Sr(K)=45% texp.=0.5s FWHM= 66 mas mv=15.5 Seeing=0.6” Sr(K)=26% texp.= 0.5s FWHM= 89mas mv=16 Seeing=0.55” Sr(K)=26% texp.=0.2s

MACAO-VLTI Performance: Strehl versus V magnitude 4/6/2017 MACAO-VLTI Performance: Strehl versus V magnitude Legend: Pink diamonds: VLTI specifications Blue curve: Computer simulations Red Curve: Test Bench (lab.) measurements Brown dots (error bars): Sky data on UT2 (April’03; lower limit ‘cause seeing > spec.) Black squares: Sky data on UT3 (August’03) Red dash-dot line: open loop strehl Strehl ratio versus guide star magnitude

MACAO-VLTI Performance: Piston-control freq. influence 4/6/2017 MACAO-VLTI Performance: Piston-control freq. influence Piston Removal: a)Determine piston mode b)Given act. V, calibrate piston over pupil c)Apply piston corr. V for each V (350 Hz) Non-Linear double iteration See paper 5490-182 Ivanescu et al. for details

MACAO-VLTI MACAO-VLTI Upgrades ITF Electronics cabinets vibrations: move out end-2006 (in progress; Paranal Eng.) Membrane mirror phaselag switch solved (noise on APDCM); upgrade of EPROM’s RTC Anti-Windup FINITO injection (ITF): Delay Lines alignment + VCM use; procedure Source centering on Fiber; dynamic modulation Tunnel Seeing: IRIS (+actuator pre-instrument!?) PSF “explosion”: implementation of SMA+Anti-Windup UT Vibrations: implementation of VTK algorithm

MACAO-VLTI: Conclusions 4/6/2017 MACAO-VLTI: Conclusions Milestones TTB (STRAP) Dec. ’01 First closed loop lab. Aug.’02 First closed loop sky 18.04.03 First fringes 14.08.03 End project 2005 Delivery of systems on schedule All functionalities operational and tested in telescope environment Strehl Ratio Performance above spec. S~60% bright sources (seeing 0.8”); S~25% V~15.5 (seeing 0.6”) Residual tip-tilt 5-9 mas for bright sources Similar performance on all UT’s (homogeneous systems) Automatic acquisition through VLTI ISS templates Perf. Tested at Coude focus (not including delay lines)

MACAO-VLTI: Team