St. Mary’s Hospital For Children New Patient Pavilion Progress, March – June 2011 A CAMPAIGN FOR ST. MARY’S HEALTHCARE SYSTEM FOR CHILDREN.

Slides:



Advertisements
Similar presentations
LAS SALINAS CONDOMINIUMS Key West Florida. Featuring A Sprayed Polyurethane Roof System Applied To Concrete.
Advertisements

November 2011 Newsletter From the Director Ms. Linda Phillips Visit our website at We would to say.
Children’s Museum of Sonoma County presents:. Bringing hands-on outreach programs to your students “Today I learned that science is fun!” 5 th grader.
St Mary’s Church Hall Project Cutting the First Sod Architect, David Nobes and District Councillor, Ken Carter on Monday 23 rd September.
What I Did On My Summer Vacation By Tyran Closson.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER 60% DESIGN PRESENTATION.
The line sketch with modified height for the plinth floor is displayed.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Taking Turns I can take turns By Solomon & Diego.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Community Update James Simons School – October 2,
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Rectangular framed structures
Framed Building Structure Lectured By: Ms. Noorhidayah Sunarti 15/4/2010.
SITE & GRADING PLANS CHAPTER 6. PART II CHAPTER 9 FOUNDATION PLANS.
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
A Day at the Beach By: Madison Wells Storytelling Butler County Middle School.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Expository Writing.
Introduction to a pit installation
Going to the DEC. Soon, I will be going to visit the DEC.
School Building ready for Slab casting.. View of the Children's Home.
World Trade Center 7 Building Performance Assessment.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
TYPICAL member spot checks & alternate systems design study
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Starting school is always a nervous time – Often more so for the parents than the children! Our aim is to make the transition from Nursery/Pre School.
Santa Claus Santa’s Reindeer The North Pole Christmas Traditions…
Cool Places in St.Louis By :Davion. Steinberg's Skating Park Steinberg Skating Park is an ice skating park. It is very fun. They have an arcade in the.
Ostriches Ostriches By: Jake One evening I was walking on the plains of Africa and I saw a large bird. I had no clue what it was! So I grabbed a tool.
By, David Sessions. Buildings come in many shapes and sizes The tallest buildings in the city are called skyscrapers.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Play Date. I am having a play date. A play date means that my friend [Friend’s name] is coming over to my house to play with me! Play dates are so much.
How To Catch A Really Sneaky Leprechaun!!! By: Madison March 14th 2012.
NEW VIRTUA VOORHEES HOSPITAL Voorhees, NJ Paul Stewart Structural Option Senior Thesis Presentation 2010 The Pennsylvania State University.
Concepts of Print Parent Presentation Amber Rhyne.
Nijad Rudy Boukhalil structural option spring’05.
Recordable injury 3/23/07 What Happened: –Employee was using a pry bar between a 2”x4” wood block support & an I-beam. The wood block slipped out & the.
My favorite food BP My favorite food is pizza. My favorite kind is cheese pizza. It is good you should try it .
Spread Footing Design for Columns
Welcome to Lewannick CP School Curriculum Event 5 Assessment A love of life through a love of learning…
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
My story at the moment... So they wanted me to make a movie. But I didn’t have much time, and my phone still looks more like this Here goes... So I made.
Addition and Subtraction With Eddy the Calculator! By: Paris Andrew.
Cool Magnets By: Makayla.
APPLICATIONS OF TECHNOLOGY
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Introduction Used for covering spaces in the form of roof or floor
Graduation Project 2 Redesigning a Villa
Integrative Design of a Secondary School
AARNA Progress Report-June 2017
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
Concrete Structures DR. Nabil Dmaidi.
Mississippi Riverbank Project (Final Presentation) May 14, 1999
Pier Foundations Piers Suspended floor Ground beam Next slide.
Children’s Hospital Update
Concrete A structural material made by combining cement, sand, aggregate, and water.
Build the first 5 odd numbers – each one with different colored blocks
Presentation transcript:

St. Mary’s Hospital For Children New Patient Pavilion Progress, March – June 2011 A CAMPAIGN FOR ST. MARY’S HEALTHCARE SYSTEM FOR CHILDREN

The first corner of our new building is up! (Architectural forms along northeast corner.)

Whoa! Lots of stuff is going on! (Architectural forms along north edge and reinforcement bars along east edge of new building.)

This is where we’re going to play! (Bird’s eye view of foundations for the new Children’s Activity Center.)

Look at the men on those cool trucks! Can I try? (Bird’s eye view looking northeast.)

That looks like fun! I have my beach shovel ready… just in case they need some help. (Backfilling with sand.)

Wow! Our new hospital will be ready soon. (Bird’s eye view.)

The floor looks so smooth – like we could skate on it. (Placement of concrete slab.)

Check out that crane! From way up here it looks like one of my toy trucks. (Erecting steel.)

Those steel beams look like pick up sticks. (Steel columns.)

This is so exciting! I can’t wait to play in the new CAC. (View looking northeast of concrete slab for Children’s Activity Center, crane, and steel.)

Look at all of the beams getting ready to build us a new home. (Staging steel.)

A CAMPAIGN FOR ST. MARY’S HEALTHCARE SYSTEM FOR CHILDREN Check back with us soon for more updates!