Yate health centre and locality hub development

Slides:



Advertisements
Similar presentations
Impact of Dynamic DTCs Transformation of Kidderminster Hospital 1st September 2003 David Evans Project Director Worcs Acute Hospitals NHS Trust.
Advertisements

Michael Smith, Safety Manager. FIRE SAFETY The main object of the fire safety arrangements is to save life. The fire alarm procedure should be followed.
COUNCIL LOUNGE 2 ND FLOOR, NEW ADMIN BUILDING UNIVERSITY OF JOHANNESBURG AUCKLAND PARK KINGSWAY CAMPUS Parking can be reserved in the reserved parking.
Development Strategy nd Consultation. Our Mission To proclaim Gods kingdom and call people to worship God in Streatham To seek to serve our community.
Want to see the inside of my House? Follow me, for a guided tour You MUST have PowerPoint viewer to see this presentation Click your mouse to advance the.
Security, Fire Safety and Health and Safety at Central European University.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Bus Loading Zone Kinder Pick up/ Parking 1 st Grade 2 nd Grade 3 rd Grade 4 th Grade 5 th Grade 6 th Grade 5 th & 6 th parents to Margaret Curb Side pick.
Occupational Health & Safety training and consultancy Demo version e-training for emergency procedures Start your e-training.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Heart or vascular Surgery at the Heart & Vascular Institute.
Overview for Resource Room 203 Day 2 Part
College of Dental Sciences Dental school building.
Fire Marshall Tool Box Training Jo Smith – Safety, Health and Environment Manager Claire Doran Paula Evans Room A132 Ext: 3334/3432 Mobile:
6 th Grade Lunch Procedures. Lunch Bell Students with a 5 th period class upstairs should drop their things in their 5th period room, and line up for.
Re-introduce yourselves to the new members of your form Revise the day to day school procedures Task 1 – Icebreaker activity Click here to choose an icebreaker.
Welcome to Hartley Library. Use your University ID/ Smartcard Getting into the library.
Welcome to Chem 2!. Room 201 Fire Alarms Located Near Doors.
Event Details Bridgestone Europe. MAIN ENTRANCE Flag Personalization.
FIRE ESCAPE Christina Joy Chambers IND 5615 Fall 2011.
Heath and Safety Contractor Induction. AUTHORISATION TO WORK No work should be carried out unless you have been given authorisation from your host Contact.
Welcome to Hartley Library. Getting into the library Use your University ID/ Smartcard.
CLASSROOM PROCEDURES. WALKING INTO CLASS ENTER CLASS QUIETLY PICK UP ANY HANDOUTS THAT ARE ON THE TABLE TURN ANY HOMEWORK INTO THE BASKET ON YOUR WAY.
Basement Suite Renovations. Storage Room Under stairs East Bedroom West Bedroom Living Room Furnace Fridge Bathroom Previous Basement Entrance to stairs.
Patriot Traits Stay Strong November – Before and After School Procedures.
Fire at the Norwich City Hotel Evacuation Scenario Click here to enter your name Click here to enter your name Click here to move to the next slide.
+ WELCOME TO HEALTH Orientation and Overview. + Today we will… Go over classroom expectations Review the grading system and content Introduce the class.
Grady Emergency Room Visit -Janani Venugopalan -PhD Student Biomedical Engg.
Heidi Alderton, School Safety Advisor. IN CASE OF FIRE: Sound the alarm by breaking the nearest Break Glass point (located in each stair well) Notify.
Kindergarten, 1st Grade, and 2nd Grade
We have two Zones in the Library Conversation Mobile Phones Group Work Zones Second and third floors are completely silent.
Layout as at 1 st July 2007 Public Rooms Offices/Reception Museum Cafe Friends of Museum Shop Physiotherapist Art Exhibition Staff Room Library.
Drill Schedule John Jay High School Mrs. Varian.  At the sound of the alarm, students are to remain silent and quickly exit the classroom going toward.
Learning, Health, and Safety Capital Project Alternates and Change Order
HBA Event: Maps & Fuqua CLICK for Complete MAP of Fuqua CLICK for Complete MAP of Fuqua.
DON’T PANIC Mesa County Public Library District Evacuation Procedures These are general instructions and procedures. Every situation is different. Use.
Out Patient Entrance Before Construction. Out Patient Entrance After Construction.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
Presentation Euroškola Praha s.r.o. Jana Křůpalová
Route 1 Route 2 Route 3 Open Day 2016 Tours Route 4.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Evacuation Route Power Point
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Main entrance To the hall.
Your Patient Survey Results February 2016
Name :Reema Balharith ID:
OFF SITE RENEWAL REGISTRATIONS!
6th Grade Lunch Procedures
IMPORTANT FLU CLINIC CHANGES
Healthwatch Portsmouth Board meeting 17 October 2018
Christmas & New Year Opening Times
WELCOME TO IT CONFERENCE ROOM
Christmas & New Year Opening Times
,
KOMPLEX Investors Report – Q
Scenario 1 CP Fire Room Ignition Team CP Attack Team Entry
for Ms. Smith’s Classroom
People and staff Patients said: A named GP is valued
New Gorbals Health and Care Centre
WES Renovation Update Photo Gallery
St Catharine’s College, Cambridge. UK Exhibition Floor Plan
Toilets In ČRG.
BUILDING LIGHTING PLAN PHASE II
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
Fire Emergency Respond
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Special Day Spa Packages Toronto by Registered Massage Therapists | King Thai massage
Campus evacuation procedure
Presentation transcript:

Yate health centre and locality hub development 22 September 2009

Looking at the rear of the building

Walking through from Sure Start to main reception – Ground floor

Main reception – Ground floor (entering from rear entrance)

Main reception area – Ground floor

Main reception area – Ground floor

Storage and filing area – 2nd floor Integrated Office

2nd floor Integrated Office

2nd floor – Integrated Office and individual meeting rooms

2nd floor Integrated Office – large meeting room 8690

2nd floor – Integrated Office

Outside S15 – Out Patients Notes Room (2nd floor)

Shower cubicle – 1st floor

G31 – Activity room

Plant room – 2nd floor

Plant room – 2nd floor

Server room – 2nd floor

West Walk Surgery – G.P. Office

Fire Escape Staircase – overlooking Library

View into corridor

Minor procedures room F19

Minor procedures room F19

1st floor waiting area

A G.P. consultation room – 1st floor

1st floor reception for out patients

1st floor reception – out patients

1st floor reception for out patients

F08 bookable room with audio booth

West Walk Surgery – waiting area

West Walk Surgery – Treatment room 1st floor 8710

Fire escape staircase

Corridor on 1st floor

Integrated office – 1st floor

Integrated office – 1st floor

Integrated office – 1st floor

G40 – assessment office – Sure Start Children’s Centre

G48 – Activity room (left) for Sure Start Children’s Centre

Looking back to the Sure Start entry/exit end of corridor

Looking back towards Sure Start entry/exit end of corridor at building rear

G34 – Physiotherapy room

G11 – Main waiting area near reception

Ground floor main reception (main entrance far left, waiting room immediate left)

Main reception desks

Main reception desks

Looking at rear of building