USAID-CIFOR-ICRAF Project Assessing the Implications of Climate Change for USAID Forestry Programs (2009) The Clean Development Mechanism: Overview Topic.

Slides:



Advertisements
Similar presentations
Ongoing discussions on the formulation of National Appropriate Mitigation Actions (NAMAs) and their possible inclusion as market mechanisms in a post-2012.
Advertisements

UNFCCC African Group preparatory meeting for COP9 on LULUCF under the CDM. (UNEP, IUCN, FAO) Addis Ababa, 23/10/2003 Antonio Lumicisi Ministry for the.
UNEP-IUCN-FAO CDM and Forestry Addis, Oct 2003 Accounting for non-permanence of carbon sequestration – options as contained in FCCC/SBSTA/2003/10/Add.3.
Climate Change Mitigation: The need to include Agriculture, Forestry and Other Land Uses (AFOLU)
ADAPTATION FUND: status and issues Richard Muyungi, United Republic of Tanzania.
DG Energy and Transport, European Commission Fabrizio Barbaso 17/04/2008 EU RENEWABLE ENERGY PROPOSALS ARF Energy Security Seminar EUROPEAN COMMISSION.
Axis 2: Environment/land management DG AGRI, October 2005 Rural Development
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
1 Kai-Uwe Barani Schmidt Secretary CDM Executive Board Clean Development Mechanism Carbon Forum America 26 February 2008.
Regional Distribution
CCS – OVERVIEW OF THE MODALITIES AND PROCEDURES AND THEIR IMPLEMENTATION SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
CLEAN DEVELOPMENT MECHANISM OF THE KYOTO PROTOCOL Group J - Matt Bastyan, Simon Crook, Joe Payne, Sarah Teverson, Michael Treiber, Paula Urry.
Trustee Financial Training 1. Agenda: 1.Overview of the Foundation 2.Define and discuss University-controlled Activities 3.Track a University-controlled.
European Commission: Environment Directorate General Slide: 1 Linking the EU Emissions Trading Scheme with JI and CDM Linking the EU Emissions Trading.
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
Forests for adaptation
EMMER INTERNATIONAAL A/R CDM projects : modalities, implementation and progress Igino M. Emmer EUSTAFOR workshop Forestry & EU ETS Brussels, 26 June 2008.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
S E R V I N G C A N A D I A N S A U S E R V I C E D E S C A N A D I E N S This may not necessarily represent the view of the Government CBA/Justice Annual.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
LULUCF María J. Sanz UNFCCC Secretariat 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means to reach emission reduction targets.
Payments for Environmental Services: Design Issues John Kerr and Rohit Jindal Michigan State University October 4, 2007.
Module 2: Project appraisal M2. M2. Project appraisal Time lines -10:45 -12:30: Content: Elements of the project appraisal (SSN) –Blunt tools blunt data.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
KYOTO PROTOCOL MECHANISMS EURASIA 歐亞 Solicitors and Advocates.
CARBON CONTRACTS - the PCF experience September 30, 2002.
Carbon Trading: The Challenges and Risks John Drexhage Director, Climate Change and Energy International Institute for Sustainable Development Agriculture.
Overview of BioCF ERPA terms December 15, 2005 The World Bank, Washington, DC.
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
CDM National Authorities : an Example Prepared for the National Workshop on Capacity Development for Clean Development Mechanism (CD4CDM) March 2003,
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
Limitations in sequestering carbon in forests By Promode Kant Indian Forest Service.
SESSION 3: Climate Change Financing Opportunities.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Global Carbon Market and CDM Potential in Cement Production Industry.
FINANCING REDD – A CRITICAL EVALUATION OF THE REDD MECHANISM Patricia Blazey and Hope Ashiabor Patricia Blazey and Hope Ashiabor 1.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Project Cycle and Project Design Document Project Cycle and Project Design Document.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
Implementation of the Kyoto Protocol: what does it mean for bioenergy and C sequestration? Implementation of the Kyoto Protocol: what does it mean for.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Global Carbon Market and CDM Potential in Cement Production Industry.
CDM and Forestry Sector in India Carbon Pool of Forestry Sector in India The growing stock of the country has been estimated to be 4,740 million m³.
Capacity promotion in research and education on clean development mechanism (CDM) Preliminary results and plan to implement the task 5 in year
Innovative Sources of Funding for SLM:
CLEAN DEVELOPMENT MECHANISM & FORESTRY CLEAN DEVELOPMENT MECHANISM & FORESTRY OPPORTUNITIES FOR CAMBODIAN FORESTERS AND CONSERVATIONISTS by Thanakvaro.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Cacho (2008) 1 THE ROLE OF TRANSACTION COSTS IN LUCF PROJECTS Research funded by ACIAR Oscar Cacho School of Business, Economics and Public Policy University.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
GEF and the Conventions The Global Environment Facility: Is the financial mechanism for the Stockholm Convention on Persistent Organic Pollutants the.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
AIT Developing Baselines for Afforestation and Reforestation Projects Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 26 th March 2004.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Mohamed Bakarr Senior Environmental Specialist GEF Familiarization Seminar Washington, DC January 17 – 19, 2012 GEF Strategies, Activities and Accomplishment:
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Things to Know About the World Bank Carbon Finance (CF) 10
Tatsushi HEMMI Institute for Global Environmental Strategies COP 9 Decisions related to CDM in forestry sector – An update on implications for Asia IGES-URC.
LDC Workshop Bali Land Use, Land-use Change and Forestry Agenda Items for COP and COP/MOP.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Carbon Markets and Carbon Crediting For Forestry West and Central Africa Tropical Forest Investment Forum – August 28 th to 30 th 2007 Timothy Pearson.
Voluntary Emission Reduction (VER) Standards EcoSecurities Carbon Neutral Network on 2Degrees September 2008.
Climate Change and Forestry —Possible Legal and Policy Instruments to Address Potential Effects of Forest Carbon Offsets Ding Zhi (Department of Law of.
1 Forests and Climate Change London, 24 January 2007 Charlotte Streck
Presentation transcript:

USAID-CIFOR-ICRAF Project Assessing the Implications of Climate Change for USAID Forestry Programs (2009) The Clean Development Mechanism: Overview Topic 5, Section D

In this presentation you will learn about the basics of the Clean Development Mechanism (CDM), the project development cycle, and forestry projects within the CDM. Topic 5, Section D, slide 2 of 31 Learning outcomes

Outline 1. CDM basics 2. Project development cycle 3. The role of forestry projects in CDM Topic 5, Section D, slide 3 of 31

1. CDM basics Article 12 of the Kyoto Protocol under the UNFCCC:  The purpose of the CDM shall be to assist non-Annex I Parties in achieving sustainable development and in contributing to the ultimate objective of the Convention, and to assist Annex I Parties in achieving compliance with their commitments  It is the host Party’s prerogative to confirm whether a CDM project activity assists it in achieving sustainable development  A CDM project activity is additional if greenhouse gas emissions are reduced below those that would have occurred in the absence of the registered CDM project activity Topic 5, Section D, slide 4 of 31

Rules for the CDM  Annex I Parties are to refrain from using Certified Emissions Reductions (CERs) generated from nuclear facilities to meet their quantified greenhouse gas emissions reduction targets  The eligibility of land use, land-use change and forestry project activities under the CDM is limited to afforestation and reforestation  Public funding for CDM projects from Annex I Parties is not to result in the diversion of official development assistance (ODA) and is to be separate from, and not counted towards, the financial obligations of Annex I Parties ODA can be, and is being, used to help prepare CDM projects For example, the Danish government has used its ODA in select countries to help develop CDM projects. Then other non-ODA funds have been used by the Danish government and the private sector to actually buy the carbon credits generated by the CDM project Topic 5, Section D, slide 5 of 31

The CDM market UNEP/EcoSecurities, 2007 Topic 5, Section D, slide 6 of 31

Source: UNEP/EcoSecurities 2007 Topic 5, Section D, slide 7 of 31 CDM projects by sectorCERs issued by sector

2. The CDM project cycle (1/2) Topic 5, Section D, slide 8 of 31

Topic 5, Section D, slide 9 of The CDM project cycle (2/2)

3. The role of forestry projects in the CDM Topic 5, Section D, slide 10 of 31

Marrakech Accord  CDM forestry is limited to: afforestation – land unforested 50 years ago reforestation – land unforested before 1990  First commitment period is when Annex 1 parties must meet their reduction obligation  Allowed at a maximum level of 1% from the assigned amount, or cap: 140 megatonnes of CO2 Topic 5, Section D, slide 11 of 31

Afforestation  Afforestation is different from reforestation. It is the process of establishing a forest on land that is not a forest, or has not been a forest for a long time by planting trees or their seeds.  The Marrakesh Accord requires that to qualify as an afforestation project, the land to be planted has not been forested for at least 50 years. 50 years Topic 5, Section D, slide 12 of 31

Reforestation  Direct human-induced conversion of non-forested land to forested land through planting, seeding and/or the human- induced promotion of natural seed sources, on land that was forested but that has been converted to non-forested land  For the first commitment period, reforestation activities will be limited to reforestation occurring on those lands that did not contain forest on 31 December Topic 5, Section D, slide 13 of 31

What is a forest?  Host country must define a forest within the following guidelines: minimum tree crown cover between 10 and 30% minimum tree height between 2 and 5 metres minimum land area between 0.05 and 1.0 hectare  Once chosen, values must remain fixed 010 Canopy Cover Topic 5, Section D, slide 14 of 31

Non-permanence  Land-based systems subject to reversal by human and natural disturbances  Addressed by concept of ‘rental’ of the service  Includes two options – temporary and long-term certified emission reductions (tCER and lCER) Topic 5, Section D, slide 15 of 31

How long can a CDM project last? (crediting period)  Two options: fixed – 30 years with no renewal renewable – may be a maximum of 20 years and may be renewed twice for a total maximum of 60 years  Need to determine if baseline is same or will be updated Topic 5, Section D, slide 16 of 31

Forest carbon is a rental service  tCER expiring at the end of the commitment period following the one in which it was issued in practice it lasts for 5 years at most  lCER expiring at the end of the crediting period following the one for which it was issued in practice it can last for years and is used in one commitment period in which it was issued  Annex 1 countries using the tCER or lCER must replace or retire them before they expire Topic 5, Section D, slide 17 of 31

Additionality b a f e d c C B D t1t1 t2t2 Time Carbon stocks A AB = Baseline AC = Additionality AD = Leakage abcd = gain abef = loss abcd-abef = net gain Fixed: 30 years with no renewal Renewable: may be a maximum of 20 years and may be renewed twice for a total maximum of 60 years Topic 5, Section D, slide 18 of 31

Transaction costs for forestry projects  Project preparation usually by a consultancy company: US$60,000 to US$180,000  Validation by a Designated Operational Entity: Estimated at US$15,000 to US$25,000  Registration fee by the Executive Board: For the first 15,000 CERs, projects are charged US$0.10/CER. For anything above 15,000 they are charged US$0.20/CER  Monitoring costs: Depends on project size and sample size needed, as well as on monitoring methods and intensity  On-going verification by the Designated Operational Entity: US$15 to US$25,000 per audit  Issuance fee by the Executive Board: The issuance fee is as above US$0.10/CER for the first 15,000 CERs, and US$0.20/CER for anything above 15,000 CERs  Adaptation levy by the Executive Board: 2% of the CERs generated  Taxes by the host country: Some countries claim a share of a project’s CERs in exchange for issuing a Letter of Approval that is prerequisite to registration Topic 5, Section D, slide 19 of 31

Tropical forests and the carbon market  There are still very few takers of forestry carbon projects under the so-called Kyoto market  It has been estimate that up to 13.6 million carbon credits may be available by 2012 based on projects in the pipeline Topic 5, Section D, slide 20 of 31

CDM Projects by scope as of 1 April 2009 Topic 5, Section D, slide 21 of 31

World Bank carbon funds  Prototype Carbon Fund (PCF) all sectors with loan component  Community Development Carbon Fund for small-scale projects sector: energy, urban, waste, agroforestry prioritises the LDC contract price US$26 per 28 tonnes of carbon  BioCarbon Fund (BCF) especially for the forestry and land-use projects to improve people livelihoods to avoid erosion and desertification contract price US$12 per 16 tonnes of carbon Topic 5, Section D, slide 22 of 31

Sustainable development objectives  Enhanced environmental services improve soil fertility conserve biodiversity maintain hydrological/watershed functions  Improved livelihoods create job opportunities increase income and financial benefits  Secured social capital ascertain land titles and tenure systems reduce conflicts over property strengthen institutions Topic 5, Section D, slide 23 of 31

Barriers to CDM projects  A lack of financing for tree planting  High transaction cost (more than US$200,000)  Carbon credits not sufficient to cover total cost of project 24Topic 5, Section D, slide 24 of 31

Strategies for overcoming barriers  For host countries, finding a partner from an Annex 1 party or financing institutions  Making carbon credits a supplemental source of income Topic 5, Section D, slide 25 of 31

Programmatic CDM  Programmes of Activities (PoAs) increase the efficiency of the CDM  To complement traditional stand-alone CDM  PoA is a programme coordinated by a private or public entity  No approved forestry programmatic CDM  But has good potential for forestry projects Topic 5, Section D, slide 26 of 31

First CDM project: Facilitating Reforestation for Guangxi Watershed Management in Pearl River Basin, China  The project activity aims to reduce threats to local forests and generate income for poor farmers by enabling the carbon sequestered by plantations to act like a ‘virtual’ cash crop for project participants  The overall objective is to explore and demonstrate the technical and methodological approaches related to credible carbon sequestration. The project will also enhance the livelihoods of people and native biodiversity Topic 5, Section D, slide 27 of 31

Specific objectives  To sequester CO2 through forest restoration in small watershed areas and to test and pilot how reforestation activities generate high-quality emission reductions in greenhouse gases that can be measured, monitored and certified  To enhance biodiversity conservation by increasing the connectivity of forests adjacent to nature reserves  To improve soil and water erosion control  To generate income for local communities Topic 5, Section D, slide 28 of 31

Project activities  Establishing 2,000 hectares of multiple-use forests in Huanjiang County, Guangxi  Establishing 2,000 hectares of multiple-use forests on sites with severe soil and water erosion in Cangwu County, Guangxi  Establishing legal structures to aid the sale of Certified Emission Reductions (CERs)  Monitoring and assessing the project’s environmental and social-economic impacts  Developing and testing local financing mechanisms  Developing, testing and disseminating the best practice in watershed management Topic 5, Section D, slide 29 of 31

Estimated carbon benefits Topic 5, Section D, slide 30 of 31

Thank you for your attention