Revised 7-24-13Draft1 Distributed Generation Interconnections - Group Study Process Option: Voluntary Rolling Window Presented to Massachusetts Distributed.

Slides:



Advertisements
Similar presentations
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
ISTISNA’.
CATS System Welcome Screen. Program Access and Authority Three levels of access: Super User: Can update and delete assigned program records (Contract.
GHG PSD Applicability Exercise. GHG PSD Applicability Exercise - Part 1 Hard Rock, LLC is a manufacturing facility with the following sources of GHGs:
New Paradigms for Measuring Savings
DG Interconnection Working Group Fees and Cost Support for DG Interconnections August 6, 2012.
Improvements to Project Development and Program Management of New Starts Projects FY 2008 Proposed Effective April 30, 2006.
Recording the ownership of mineral-related assets London Group Rome, December 2007 Peter Comisari Australian Bureau of Statistics.
Briefing: NYU Education Policy Breakfast on Teacher Quality November 4, 2011 Dennis M. Walcott Chancellor NYC Department of Education.
Subsidized Guardianship Permanency Initiative. SG Introduction Focuses on improving permanency outcomes for children in out-of-home care through a comprehensive.
Treatment of Firm Redirects Recent FERC Order. Entergy Order Docket Nos. ER OA ER Issued May 16, 2013
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
Name of presenter Corporate Climate Change Adaptation Planning Council name Date.
Washington State Taxpayer Rights and Responsibilities.
2-1 Nature & Functions of Insurance In its simplest aspect, insurance has two fundamental characteristics: 1.Transfer of risk from the individual to the.
Implementation of Leader Axis measures by Jean-Michel Courades AGRI-F3.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
December 8, Changes to Patent Fees Under the Consolidated Appropriations Act, 2005 (H.R. 4818)(upon enactment) and 35 U.S.C. 103(c) as Amended by.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Topics to Cover Interconnection Process Overview
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
California Statewide Prevention and Early Intervention (PEI) Projects Overview May 20, 2010.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Project planning and Management By Fouad CSI1. MODULE III: PROJECT LIFE CYCLE Project Life Cycle A project life cycle is the series of phases that a project.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
Doc.: IEEE /1129r1 Submission July 2006 Harry Worstell, AT&TSlide 1 Appeal Tutorial Notice: This document has been prepared to assist IEEE
PSO Overview for Executives (Presenter) (Date) Center for Patient Safety Toolkit for PSO Participation, Section 4.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Introducing Project Management Update December 2011.
PJM©2015 PJM Order 1000 Implementation: Proposal Window Process Baltimore, MD October 13, 2015 Steven R. Herling Vice President, Planning PJM Interconnection.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Community Solar, Remote Net Metering, and Behind the Meter Solar Update Solar Progress Partnership* Summary of April 18, 2016 Comments The Solar Progress.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
European Life Sciences Infrastructure for Biological Information ELIXIR Collaboration Agreement Template ELIXIR/2014/10 Vera Herkommer.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Process 4 Hours.
Background / Introduction
Auditing & Investigations II
INTERCONNECTION GUIDELINES
Step 3: Legally Binding agreements and contracts
Large Projects proposed approach
Proposal for Distribution Group Studies
Sales Process March 2017.
IPPC first consultation 1 July to 30 September 2018
IS&T Project Reviews September 9, 2004.
PSO Overview for (name of organization’s) PSES Workgroup
California Solar Initiative RD&D PV Integrated Storage: Demonstrating Mutually Beneficial Utility-Customer Business Partnerships Deepak Aswani May 4, 2017.
PSO Overview for (name of organization’s) PSES Workgroup
Presentation transcript:

Revised Draft1 Distributed Generation Interconnections - Group Study Process Option: Voluntary Rolling Window Presented to Massachusetts Distributed Generation Collaborative Working Group on 7/18/2013 Bill Walsh, Northeast Utilities

Revised Draft2 General Concepts Group study concept is specific to the system impact study (SIS) Not applicable to any other phase, i.e. pre-application, technical screening, supplemental review, detailed study or construction. A group study is a single SIS which treats multiple applications as one A group study would only be relevant in instances where there are multiple applicants in, or entering into, the SIS stage that may interconnect to common elements of the utility grid; and, where one applicant may potentially impact the system upgrade requirements needed for one or more of the other applicants (typically common circuit and/or substation transformer)

Revised Draft3 Potential Developer Benefits and Risks Benefits: –Socialize costs Impact study Common upgrades –Reduction in upgrade costs for individual applicants may turn financially non-viable projects into viable ones Risks: –Upgrade cost socialization may increase cost to individual applicant –Time-line impacts: potentially increased uncertainty & duration –Churn in group could have adverse time and financial consequences

Revised Draft4 Considerations – Utilities While utilities recognize the potential overall DG program benefit to group study treatment, they also recognize the increased risks and uncertainties for DG developers and are therefore largely neutral on its adoption Group Process should not place additional resource burden on utilities –Group control over administration will allow members to control admin costs, contain decision making to stakeholders, and prevent utilities from being perceived to be creating adverse outcomes to individual members or the group as a whole

Revised Draft5 (continued) Once formed, the group should have a single liaison (legal entity?) with the utility that will be responsible for all cost obligations attributable to the group including SIS, detailed design and construction of common upgrades Detailed design and construction of common upgrades will not be undertaken until costs are paid in full consistent with tariff Detailed studies and construction of individual member upgrades will be processed independent of the group study process

Revised Draft6 (continued) Each member will be issued a separate ISA that will include a description of their non-common upgrades and costs and will include a contingency that requires the provisioning of a release issued by the group liaison Utilities will provide cost allocations attributable to each member for common costs consistent with the tariff

Revised Draft7 Voluntary Rolling Window Attributes Initial applicant (#1) with no electrical interdependency follows sequential process Upon receipt of subsequent application with electrical interdependence to #1, Utility s #1. “There’s a project 2. Do you want your contact information shared with #2 so that consideration may be given to forming a group?” –#1 & #2 processed as individuals under sequential process pending group agreement #1 informs utility – No to group… continue sequential, Yes… #1 & #2 inform utility of interest.

Revised Draft8 (continued) Liaison submits application for group Utility assigns group same queue position as #1. Both retain original applications and original queue positions Liaison impact study agreement executed with incremental study cost. Study clock reset (complex time frame? Mutual agreement?) Utility prosecutes group study and provides both group and individual results Liaison determines if group to be retained or dissolved/revert to individual

Revised Draft9 (continued) Detailed design and construction process requirements same as for sequential. –Individual applicant queue position determines order for individuals. Common upgrades done 1 st Process continues for subsequent applications with electrical interdependence with group with group becoming #1 in the prior example

Revised Draft10 (continued) In the event that an electrically interdependent applicant opts not to participate in the group, it is evaluated within the group study, and if it benefits from the common upgrades, it is forced to participate, subject to the approval of the group, with said approval documentation to be provided to the utility by the group liaison. –If not accepted into the group, or if this provision is not agreed to, an applicant that does not participate in the group is queued behind the group for independent study

Revised Draft11 DGWG Meeting Discussions and Follow-up If group studies were mandatory and there was significant interest in DG development within an electrically interdependent area, there is a likelihood that system upgrades required for the entire group would be extensive and potentially cost prohibitive. Unraveling of the group for such an outcome may be complicated and all applicants may experience significant time delays. The average time to process applications in a mandatory fixed window process could be longer than that for the voluntary rolling window (processing time for the voluntary process is significantly under group control)

Revised Draft12 (continued) There is reference in the tariff to utilities’ line extension policy treatment where DG customers would benefit from the upgrades paid for by a prior customer. Several concerns include: –Line extension policies vary between utilities and non-uniform treatment could introduce inequities –Utilities would need to add resource and introduce special processes and systems Systems, processes, and staff additions would be needed to allow accurate queries to identify prior upgrades within an applicable time window. The system would need to be able to identify which DG customers paid for the upgrades and what cost allocations would be A DG customer rebates/refunds program would need to be administered

Revised Draft13 (continued) Would refunds be owed to the original applicant or the current owner at the time that another customer contribution is received? –DG customer business plans are developed on the basis of upgrade costs presented in the impact studies and agreed to in the interconnection agreement. Subsequent cost reimbursements would be a windfall and do not square with the benefit that the DG customer receives from capacity costs borne by ratepayers. Consistent treatment would require consideration of and allocation of ratepayer supported capacity additions to all DG customers.