HQ & LHQ End Parts Miao Yu Fermilab 08/27/12. HQ parts All the spacers are arriving within a week. 2.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

ax2 + bx + c 2x2 + 11x + 5 ac 2(5) = b =11 ( ) 2x2 + 10x + 1x
Slide 1 Insert your own content. Slide 2 Insert your own content.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Rice Krispie Treats Microwave. Ingredients: 2 Tablespoons butter ( cut butter) 20 large marshmallows (3c. Mini) 3 c. rice krispie cereal 2/3 c. chocolate.
Exponents You will have 20 seconds to complete each of the following 16 questions. A chime will sound as each slide changes. Read the instructions at.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
BALANCING 2 AIM: To solve equations with variables on both sides.
Richmond House, Liverpool (1) 26 th January 2004.
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
2A 1A 3A 1A Vs 3A : A Vs 1A : A Vs 3A : A 6 points 1A 3 points 3A 0 point.
HT Series – High Temperature Technology 1 INTERPUMP GROUPS NEW PUMP LINE FOR CAR WASH AND INDUSTRIAL APPLICATIONS UP TO 85°C (185° F)
© S Haughton more than 3?
Tapio RQP Roll Quality Profiler.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Squares and Square Root WALK. Solve each problem REVIEW:
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Proposal for HQ Coil 27 Miao Yu, Steve Krave. What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
Week 1.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
X-box Factoring. X- Box 3-9 Product Sum Factor the x-box way Example: Factor 3x 2 -13x (3)(-10)= x 2x 3x 2 x-5 3x +2.
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011.
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Surface Coatings & Tests for LARP Coil Endparts Task Force D.W.Cheng LBNL February 24, 2012.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LHQ01 IL Curing Miao Yu 01/31/2013. LHQ IL Packing for Curing 2.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
QXF Cable Winding Test and End Parts Design
Analytical Cost Model (16 T dipole)
Analytical Cost Model (16 T dipole)
Presentation transcript:

HQ & LHQ End Parts Miao Yu Fermilab 08/27/12

HQ parts All the spacers are arriving within a week. 2

HQ L1 RE Key (Pole) 3 Nominal thickness: mm ( inch) Measure: inch ~ inch

Saddle Grind by hand due to the late awareness Not satisfied Our techs will buff the edges (20 min/part) ~14.0 mm vs mm ~0.5 mm unsupported strands during w/c/r 4

Spacer The spacers were fabricated after the awareness. 5

Plasma Coating 6 Vendor: White Engineering, PA A100 coating passes the curing, reaction and thermal cycle

Thickness measurement 5 random points on OD, BEND and side surfaces Fisher dual scope 7

Thickness measurement 5 random points on the coating surface 8

Quotation 1 9 Equipped with robotic head +/- 1mil on priority surface +/-3mil on curved surface Response: very slow Price: high Delivery: slow

Quotation 2 10 Coat manually +/- 3mil tolerance Response: fast Price: low Delivery: fast

Quotation 3 11 Equipped with robotic head +/- 1mil on regular surface +/-3mil on BEND surface Response: fast Price: low Deliver: fast

Plan 6 middle pole pieces (one LHQ coil) to each vendor Verify the thickness Measure the coating strength as the parts received and after curing, reaction and thermal cycles. (no impregnation test) Vendor selection 12