Proposal for HQ Coil 27 Miao Yu, Steve Krave. What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
HQ & LHQ End Parts Miao Yu Fermilab 08/27/12. HQ parts All the spacers are arriving within a week. 2.
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
BNL - FNAL – LBNL - SLAC US LHC Accelerator Research Program LQ Reaction/Impregnation DR’s & Travelers at FNAL CM15 Magnet Systems Working Groups HQ Coils.
EMU Chambers Production Supervision FNAL Supervision Line Manag. Infor. Flow G. Apollinari N. Chester L1-L2 Managers Chamber L3 Manag. Glenn Smith.
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
LHQ Curing Mold Miao Yu Fermilab 07/26/2011. HQ and LQ Curing HQ coil curing (LBNL) 2 LQ coil curing For HQ, the pressure of the mandrel cylinder is set.
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Update on Accordion Parts Steve Krave. Accordion Parts L1: L2: 2.
Comments from reviewers and updated plans G. Ambrosio and P. Ferracin October,
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
F. Borgnolutti January 17 th 2013 Proposal for a winding test procedure for qualifying the QXF cable.
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
WEEK 1 You have 10 seconds to name…
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
Pocket and Metric Hole in End Parts Miao Yu 02/25/2014.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
LHQ01 IL Curing Miao Yu 01/31/2013. LHQ IL Packing for Curing 2.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
QXF Cable Winding Test and End Parts Design
P. Ferracin and G. Ambrosio
Modified at -
Pole Position Student Points Time
A B C D.
Presentation transcript:

Proposal for HQ Coil 27 Miao Yu, Steve Krave

What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate the fabrication of the coil with accordion end parts Test the coil performance in the mirror structure Spare coil for magnet HQ03 2

Accordion Parts L1: L2: 3

Plan and cost estimation Coil Parts: $15k including plasma coating –Procure 1 set of HQ end parts: quote next week –Procure 1 set of HQ poles –Modify LHQ splice block Fabricate the coil at LBNL after HQ coil 26: ~$200k Mirror test at FNAL: ~$227k Total cost: $442k 4